Q1 How do you identify and interpret quality standards
(AC1.4,1.5)
To interpret and identify from the process, user have to improve
the gaps and arrears. Quality standard will help to modify it.
Q2 Explain ways that quality standards on to people responsible for
implementing them before starting work on a contract (AC1.6)
Before the work processing, the focus area of a project has been
marked. Then the marked area should be modified or execute properly.
Q3 Explain how responsibilities can be specified to individuals having
to maintain quality standards, and who those individual may be for
given projects. (AC2.2)
The responsibility is needed to be divided into several part. Each
part should be divided into the proper expertise person. That’s how the
project will executed.
Q4 Why you need to specify the responsibilities which
individuals have for maintaining quality standards (AC2.3)
To maintain the product quality, the project have to structure in
proper way.
Q5 Explain how solutions, which decision-makers need to make about
significant variations in quality standards and advice on the actions
they need to take, can be recommended. (AC6.4)
The recommendation is always needed to complete the process.
The Decision making is needed for quality task. The
recommendation is directly connected with the decision.
Job Knowledge Questions Unit No.
QCF735

The quality of a product is depended on the several objects. According to
the requirement the quality have to modify.
Q6 Explain how systems for inspecting and controlling the quality of
work and record the outcomes should be set up. (AC3.3)
The system inspection process helped to record the data properly. The
data is used to apply and the quality of product should be
maintained .
Q7 Why do you need to set up systems for inspecting and
controlling the quality of work and record the outcomes
(AC3.4)
Inspection is needed to identify the fault and the recommendation is needed to
complete the process.
Q8 Explain methods that checks that work conforms to design
requirements and the specified quality standards. (AC4.3)
Testing or gauging, measuring, examining is the methods of the quality
standerds.
Q9 Describe ways that identifies and records work that fails to
meet the requirements and specified quality standards (AC5.3)
The output of the failed case lead to other same category product; those are about to
fail. Thus the failed cases is identified.
Q10 How do you implement corrective action where work fails to
meet the requirements and specified quality standards
(AC5.4,8.4)
Failed cases are supposed to avoid the failed steps. Those are identified with
the quality analysis.
Q11 Explain ways of recommending improvements to decision-makers,
and why recommendations should be made (6.5)
Recommendation is used to modify the task again and
again.
Q12 Explain how conflicts between quality standards can be identified. (AC7.3)

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Controlling Project Quantities and Costs in the Workplace
|2
|692
|379

Control Project Progress against Agreed Programs in the workplace
|4
|1047
|155

DNI 4 Project 3: Equipment Maintenance and Validation
|4
|796
|443

Quality Standards in Occupational Work Environment
|4
|826
|116

Contribute to Service Improvement in Pharmacy Services
|11
|3840
|416

Establish, Controlling and Monitoring Environmental Factors and Sustainability in the workplace
|3
|613
|440