logo

uSoft HQ Networking Project: Requirement Engineering, IP Address Planning, and Network Diagram Implementation

   

Added on  2023-04-26

10 Pages2762 Words285 Views
 | 
 | 
 | 
“Title Page”
Will include the following:
Title: Please fill
This is the title of your report and will include the name of the organisation.
Author: please fill
Date: please fill
Summary
The uSoft FQ is located in the 6 storey building which has its own floor structuring performed in a
better manner. The network used must be flexible enough to meet the prosecution of the project in a
better manner. Requirement engineering is to be performed in the project. With the help of the
requirement engineering the requirement of the LAN of HQ will be well understood. This is the sole
reason that the management of the project gets performed in a logical manner. With the help of the IP
address planning the main advantage that is present in the project management of the entire
networking scenario gets performed in a better manner. Implementation of logical network diagram
and physical network diagram is performed as per the management of the project. This is the main
reason that the VPN introduction and firewall implementation is performed. This aspect takes into
consideration the anti-malware and the DMZ system. Implementation of the VLAN and IP Subnetting
is very beneficial in the project management. Implementing of Static addressing and dynamic
addressing is one of the main reason that prosecutes better completion of the networking project. The
Physical and Logical networking diagrams will be enacting beneficial for uSoft HQ in order to
manage the system in better manner.
uSoft HQ Networking Project: Requirement Engineering, IP Address Planning, and Network Diagram Implementation_1

Table of Contents
“Title Page”...........................................................................................................................................1
Title: Please fill.................................................................................................................................1
Author: please fill..............................................................................................................................1
Date: please fill..................................................................................................................................1
Summary...............................................................................................................................................1
Table of Contents..................................................................................................................................2
1. Introduction.......................................................................................................................................3
1.2 Goal: To improve the communication in wireless, VoIP.............................................................3
2. Organisational Description................................................................................................................3
...........................................................................................................................................................3
2.2 The HQ has a total of 6 departments, namely the software development section, solution design
is also a sector of the HQ. Customer support, Sales, Finance, Human resources are the departments
that are functional in the commencement of the project....................................................................3
3. Analysis of User Requirements (Requirement engineering)..............................................................4
4.1 Security: this sub-section describes (and justifies) your proposed solution such as VPN, location
of firewall, access control, anti-malware, DMZ if any, etc................................................................4
...............................................................................................................................................................8
7. Conclusions.......................................................................................................................................8
List of References..................................................................................................................................9
Appendices (Optional)...........................................................................................................................9
Glossary of Terms (Optional)..............................................................................................................10
uSoft HQ Networking Project: Requirement Engineering, IP Address Planning, and Network Diagram Implementation_2

1. Introduction
New section, Starts on New page. Page numbering starts from 1.
The aims of your report (what you intend to cover) – goals, purpose, background & scope
May have sub sections
1.1 Aim of the report: Aim of the project is to develop a logical and physical
network
1.2 Goal: To improve the communication in wireless, VoIP
To protect the company information
1.3 Purpose: Increase the scalability, remote access, performance, security,
flexibility and availability of system functioning
1.4 Background: uSoft HQ is located in a 6 storey building with proper floor
planning. The company has different sections in different floors and also has 2
different branches that is controlled by the HQ itself.
1.5 Scope: Scope of the report is to develop an efficient network planning
2. Organisational Description
This section contains a general description of the organisation, including your assumption
about the business activities and future growth.
May have sub sections
2.1 uSoft.com is a private biomedical software organization that has its own
branches all over the Gold Coast Region. The company’s local area network
will be performed with the help of the topology that is initially set. The
company has been ever developing and this is the main reason that the
projection of redeveloping of the HQ’s existing LAN must be done in order to
support the functioning of the project in a better manner.
2.2 The HQ has a total of 6 departments, namely the software development
section, solution design is also a sector of the HQ. Customer support, Sales,
Finance, Human resources are the departments that are functional in the
commencement of the project.