Value Stream Map
VerifiedAdded on 2023/03/17
|12
|2843
|53
AI Summary
This report discusses about the system archetypes that can be implemented as per the case study. This report discusses the functional process of the existing Value stream map. This report deals with the changes that are to be made in the existing value stream map and the consequences of the same and provides recommendation.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: VALUE STREAM MAP
VALUE STREAM MAP
Name of the Student
Name of the University
Author note
VALUE STREAM MAP
Name of the Student
Name of the University
Author note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1
VALUE STREAM MAP
Executive Summary
This report discusses about the system archetypes that can be implemented as per the case study.
This report discusses the functional process of the existing Value stream map. This report deals
with the changes that are to be made in the existing value stream map and the consequences of
the same and provides recommendation.
VALUE STREAM MAP
Executive Summary
This report discusses about the system archetypes that can be implemented as per the case study.
This report discusses the functional process of the existing Value stream map. This report deals
with the changes that are to be made in the existing value stream map and the consequences of
the same and provides recommendation.
2
VALUE STREAM MAP
Table of Contents
Introduction......................................................................................................................................3
Background......................................................................................................................................3
Body.................................................................................................................................................3
Identification and analysis of the System Archetypes that will impede performance.................3
Analysis of the Current State Value Stream Map based on System Archetypes.........................5
Recommendation of the new State Value Stream Map...............................................................6
Consequences of the new State Value Stream Map....................................................................8
Conclusion.......................................................................................................................................9
Recommendation.............................................................................................................................9
References......................................................................................................................................10
VALUE STREAM MAP
Table of Contents
Introduction......................................................................................................................................3
Background......................................................................................................................................3
Body.................................................................................................................................................3
Identification and analysis of the System Archetypes that will impede performance.................3
Analysis of the Current State Value Stream Map based on System Archetypes.........................5
Recommendation of the new State Value Stream Map...............................................................6
Consequences of the new State Value Stream Map....................................................................8
Conclusion.......................................................................................................................................9
Recommendation.............................................................................................................................9
References......................................................................................................................................10
3
VALUE STREAM MAP
Introduction
This report discusses about the functional process of the value stream map that helps in
visualizing of the functional process of a particular department. Implementation of the new
terminologies that will be beneficial will be providing a better understanding of the data
processing system. this data processing system instills the fact that proper treatment process is
performed and the time that is taken is least. Usage of Electronic data warehouse will be helpful
in completing the target of reducing of the waiting time.
Background
With the implementation of the current value stream map that is being used has several
issues in commencing of the treatment process. Patients were facing a lot of issues in the
processing of the treatment in the emergency department. This has been the major reason that
change is expected in the system. This incurs the fact that proper management of data
segmentation is performed. The delay that is caused is mainly because the nurses were solely
responsible for performing the data circulation. This excess dependency on the functioning of
nurses have been the main reason for the delay in the treatment process. This ensures that
treatment of the patients in the emergency department gets affected. Hence improving of this
scenario is the main concern of the report.
Body
Identification and analysis of the System Archetypes that will impede performance
System archetypes are the tools that help managers in providing proper management of
the insight that orientation of the business management system. Understanding of the business
management section is the reason of importance of system archetypes.
VALUE STREAM MAP
Introduction
This report discusses about the functional process of the value stream map that helps in
visualizing of the functional process of a particular department. Implementation of the new
terminologies that will be beneficial will be providing a better understanding of the data
processing system. this data processing system instills the fact that proper treatment process is
performed and the time that is taken is least. Usage of Electronic data warehouse will be helpful
in completing the target of reducing of the waiting time.
Background
With the implementation of the current value stream map that is being used has several
issues in commencing of the treatment process. Patients were facing a lot of issues in the
processing of the treatment in the emergency department. This has been the major reason that
change is expected in the system. This incurs the fact that proper management of data
segmentation is performed. The delay that is caused is mainly because the nurses were solely
responsible for performing the data circulation. This excess dependency on the functioning of
nurses have been the main reason for the delay in the treatment process. This ensures that
treatment of the patients in the emergency department gets affected. Hence improving of this
scenario is the main concern of the report.
Body
Identification and analysis of the System Archetypes that will impede performance
System archetypes are the tools that help managers in providing proper management of
the insight that orientation of the business management system. Understanding of the business
management section is the reason of importance of system archetypes.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
4
VALUE STREAM MAP
The system archetypes that are used in this process includes the usage of the Escalation,
Tragedy of the commons and eroding of goals in this process.
As per the system archetypes of the escalation, reflection of the issues that are present in
the processing of the business management is stated. This reflection of the statement helps in
providing proper data sets that helps in understanding the issues that are present in the business
management system. The escalation archetype is mainly concerned with the irony of the
management that acts as a guideline for the organization for better executing of the business
processing. This archetype also provides the scope of changes that can be made. This process is a
result of the reductionist thinking (Azizi 2015). The action step that will be taken as per the
escalation is highly predictive. The reason of this predictive output is due to the fact that the
issue that is provided in the escalation is mitigated. In this case, the escalation is regarding the
delay in time that hampers the treatment process in the emergency department. Mitigating this
issue has been one of the major aspect of this report.
Tragedy of the commons is considered to be a visual display of issues that are caused due
to un-systematic approach of the business processing and needs a long term mitigation plan for
better commencing of the management process. The resources that are taken into consideration
includes resources, namely people, materials and other tools that are important in bettering of the
business processing system. This archetype is mainly concerned with the overall output of the
business management system and the individual issues that are present in the steps. In this case
the main issue that is present includes the fact that proper management of the data orientation is
performed as per the commencing of time that is taken to mitigate the issue (Andrade, Pereira &
Del Conte 2016). This mitigation of issue includes the fact that proper understanding of the issue
that is present in each and every step of the business management system.
VALUE STREAM MAP
The system archetypes that are used in this process includes the usage of the Escalation,
Tragedy of the commons and eroding of goals in this process.
As per the system archetypes of the escalation, reflection of the issues that are present in
the processing of the business management is stated. This reflection of the statement helps in
providing proper data sets that helps in understanding the issues that are present in the business
management system. The escalation archetype is mainly concerned with the irony of the
management that acts as a guideline for the organization for better executing of the business
processing. This archetype also provides the scope of changes that can be made. This process is a
result of the reductionist thinking (Azizi 2015). The action step that will be taken as per the
escalation is highly predictive. The reason of this predictive output is due to the fact that the
issue that is provided in the escalation is mitigated. In this case, the escalation is regarding the
delay in time that hampers the treatment process in the emergency department. Mitigating this
issue has been one of the major aspect of this report.
Tragedy of the commons is considered to be a visual display of issues that are caused due
to un-systematic approach of the business processing and needs a long term mitigation plan for
better commencing of the management process. The resources that are taken into consideration
includes resources, namely people, materials and other tools that are important in bettering of the
business processing system. This archetype is mainly concerned with the overall output of the
business management system and the individual issues that are present in the steps. In this case
the main issue that is present includes the fact that proper management of the data orientation is
performed as per the commencing of time that is taken to mitigate the issue (Andrade, Pereira &
Del Conte 2016). This mitigation of issue includes the fact that proper understanding of the issue
that is present in each and every step of the business management system.
5
VALUE STREAM MAP
Eroding of the goal archetype ensures that proper understanding of the goal is not made.
This delay in treatment of the patient includes the fact that improper treatment process is
implemented and the time that is taken to start the treatment process is also high. This issue
needs to be mitigated as per the commencing of the business processing.
Analysis of the Current State Value Stream Map based on System Archetypes
Current State Value Stream map that is used in this case is time consuming and is
supposedly inefficient. This inefficient processing of the data system incurs the fact that the time
that is taken to complete the treatment process is very high. This value stream map is concerned
with the functioning of the emergency department of a hospital. As per the value stream map that
is present includes the fact that the entire value stream map is diverged in 2 parts, namely the
Information flow and the material flow (Lacerda, Xambre & Alvelos 2016). In the beginning
stages the patient enters the hospital and registers himself and provides the data that are
regarding the insurance and the nature of injury that he is having. This information is provided to
the nurse who will be attending the patient. After this the patient waits in the waiting area and
then as per the description of the nurse the patient is taken to the waiting room. After this stage,
the nurse starts examining the patient. After this examining stage the data of the patient is sent to
the doctor. After sending of the data to the doctor the treatment process begins. This circulation
of data causes high amount of issue that are regarding the time that is wasted regarding the data
circulation process (Sachdeva, Kumar & Chaudhary 2017). The nurse then supplies with the
diagnosis and supply needs that helps the doctors in treating the patient in a better manner. Again
the patient needs to wait in this phase. After the testing process, the nurses bring the medical
supplies and the doctor treats the patients. After this process, the main aspect that will be taken
into consideration is that the insurance agencies take care of the functional processing, which
VALUE STREAM MAP
Eroding of the goal archetype ensures that proper understanding of the goal is not made.
This delay in treatment of the patient includes the fact that improper treatment process is
implemented and the time that is taken to start the treatment process is also high. This issue
needs to be mitigated as per the commencing of the business processing.
Analysis of the Current State Value Stream Map based on System Archetypes
Current State Value Stream map that is used in this case is time consuming and is
supposedly inefficient. This inefficient processing of the data system incurs the fact that the time
that is taken to complete the treatment process is very high. This value stream map is concerned
with the functioning of the emergency department of a hospital. As per the value stream map that
is present includes the fact that the entire value stream map is diverged in 2 parts, namely the
Information flow and the material flow (Lacerda, Xambre & Alvelos 2016). In the beginning
stages the patient enters the hospital and registers himself and provides the data that are
regarding the insurance and the nature of injury that he is having. This information is provided to
the nurse who will be attending the patient. After this the patient waits in the waiting area and
then as per the description of the nurse the patient is taken to the waiting room. After this stage,
the nurse starts examining the patient. After this examining stage the data of the patient is sent to
the doctor. After sending of the data to the doctor the treatment process begins. This circulation
of data causes high amount of issue that are regarding the time that is wasted regarding the data
circulation process (Sachdeva, Kumar & Chaudhary 2017). The nurse then supplies with the
diagnosis and supply needs that helps the doctors in treating the patient in a better manner. Again
the patient needs to wait in this phase. After the testing process, the nurses bring the medical
supplies and the doctor treats the patients. After this process, the main aspect that will be taken
into consideration is that the insurance agencies take care of the functional processing, which
6
VALUE STREAM MAP
lead to proper management of the financial transaction process. In between this phase the
attendant is also kept informed regarding the data of the patients by the nurse. This ensures the
fact that management of the data processing is performed by the nurses and hence the time that is
consumed is more than expected. This is one of the major reason that the delay that is caused in
the treatment processing phase affects the functioning process of the treatment. After completion
of the treatment process, patients are provided with departure information. This departure
information is again provided by the nurses. This again includes the aspect that the time that is
consumed in the process increases. Hence proper management of the data system affects the
functional process of the emergency department in a positive manner.
The system archetype that is used in this case is the limit to growth archetype. As per this
archetype the main advantage that is used in the process includes the fact that proper
management of the task that is performed is performed with a particular decorum. This decorum
insists that there will be guidelines and the entire process is to be performed with the help of that
guideline. This process limits the growth of the system. This limiting of the growth of the system
includes the fact that innovation process is not implemented and this is the main reason that
processing of the business management gets affected in a negative manner.
Recommendation of the new State Value Stream Map
The new value stream map that is designed is performed with the help of the processing
of the shifting of burden archetype. This shifting of burden archetype is concerned with the
processing of the task that is to be performed by distributing the task among the resources that
are present. This ensures the fact that proper management of the business processing gets
performed as per the divergence resource functioning (Hung et al, 2015). This process also
ensures the fact that proper overlapping of the phases can be created. This will again help in
VALUE STREAM MAP
lead to proper management of the financial transaction process. In between this phase the
attendant is also kept informed regarding the data of the patients by the nurse. This ensures the
fact that management of the data processing is performed by the nurses and hence the time that is
consumed is more than expected. This is one of the major reason that the delay that is caused in
the treatment processing phase affects the functioning process of the treatment. After completion
of the treatment process, patients are provided with departure information. This departure
information is again provided by the nurses. This again includes the aspect that the time that is
consumed in the process increases. Hence proper management of the data system affects the
functional process of the emergency department in a positive manner.
The system archetype that is used in this case is the limit to growth archetype. As per this
archetype the main advantage that is used in the process includes the fact that proper
management of the task that is performed is performed with a particular decorum. This decorum
insists that there will be guidelines and the entire process is to be performed with the help of that
guideline. This process limits the growth of the system. This limiting of the growth of the system
includes the fact that innovation process is not implemented and this is the main reason that
processing of the business management gets affected in a negative manner.
Recommendation of the new State Value Stream Map
The new value stream map that is designed is performed with the help of the processing
of the shifting of burden archetype. This shifting of burden archetype is concerned with the
processing of the task that is to be performed by distributing the task among the resources that
are present. This ensures the fact that proper management of the business processing gets
performed as per the divergence resource functioning (Hung et al, 2015). This process also
ensures the fact that proper overlapping of the phases can be created. This will again help in
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
7
VALUE STREAM MAP
reducing the time that will be required in the competition of the project. As per the usage of the
burden shifting system the main advantage that will be received is that hypothesizing of the
symptomatic solution as the alleviating of the fundamental solution will be reducing the pressure
of the implementing of the fundamental solution. The side effect of this process is that the
fundamental solution gets undermine. Identifying the problem symptom is considered as a step
of the business processing system. Mapping the quick fixes are also stated in the system.
Developing of the multiple perspective has been one of the major aspect that provides better
understanding of the remedial and mitigation strategy. Fundamental loops are also taken into
consideration.
Figure 1: Value Stream Map
(Created by Author)
The new value stream map that is designed has its highlight as in implementation of the
enterprise data warehouse. This tool is generally is generally used for the processing of the
reporting of data and analysis of the same (Tyagi et al, 2105). The electronic data warehouse is
concerned with the processing of the management of the integrated data as per the disparate
VALUE STREAM MAP
reducing the time that will be required in the competition of the project. As per the usage of the
burden shifting system the main advantage that will be received is that hypothesizing of the
symptomatic solution as the alleviating of the fundamental solution will be reducing the pressure
of the implementing of the fundamental solution. The side effect of this process is that the
fundamental solution gets undermine. Identifying the problem symptom is considered as a step
of the business processing system. Mapping the quick fixes are also stated in the system.
Developing of the multiple perspective has been one of the major aspect that provides better
understanding of the remedial and mitigation strategy. Fundamental loops are also taken into
consideration.
Figure 1: Value Stream Map
(Created by Author)
The new value stream map that is designed has its highlight as in implementation of the
enterprise data warehouse. This tool is generally is generally used for the processing of the
reporting of data and analysis of the same (Tyagi et al, 2105). The electronic data warehouse is
concerned with the processing of the management of the integrated data as per the disparate
8
VALUE STREAM MAP
source. This tool is generally used for analysis of the data of people who have their data inputted
in the system (Henrique et al, 2016). The main advantage that is gained after implementation of
the data warehouse in the treatment process is that data can be entered from more than one
source and hence the data set can be accessed from more than one system as well. In this tool
data can be entered from multiple input system to a single data base. This helps in increasing the
efficiency of the data circulation process.
The new value stream map that is designed is similar to that of the existing value stream
map but has an implementation of the Electronic data warehouse system. This introduction of the
data warehouse system enhances the functional process of the data management system. In this
case the patient visits the hospital and registers himself (Tamás 2016). During the registration
process the data that the patient provide about himself gets stored in the data warehouse. Now
the data that are stored in the data warehouse will be available to the system of the doctors as
well as the nurses and the other attendants. In this case commencing of the data gets easier. The
patient visits the ER room and waits there (King & King 2015). The nurses examines patient and
then the patient waits for the doctors to examine the patient. After the testing phase the patient
needs to waits for the processing of the entire scenario. After completion of the treatment
process, the data that are generated in the treatment process, gets stored in the data base of the
system and hence proper understanding of the financial aspect of the insurance company is
made. With the help of the newly designed map, the waiting time can be reduced to half of the
waiting time that was required earlier.
Consequences of the new State Value Stream Map
The consequences that will be received includes the fact that proper management of the
data can be made. This management of the data will be providing an ace in governing of the
VALUE STREAM MAP
source. This tool is generally used for analysis of the data of people who have their data inputted
in the system (Henrique et al, 2016). The main advantage that is gained after implementation of
the data warehouse in the treatment process is that data can be entered from more than one
source and hence the data set can be accessed from more than one system as well. In this tool
data can be entered from multiple input system to a single data base. This helps in increasing the
efficiency of the data circulation process.
The new value stream map that is designed is similar to that of the existing value stream
map but has an implementation of the Electronic data warehouse system. This introduction of the
data warehouse system enhances the functional process of the data management system. In this
case the patient visits the hospital and registers himself (Tamás 2016). During the registration
process the data that the patient provide about himself gets stored in the data warehouse. Now
the data that are stored in the data warehouse will be available to the system of the doctors as
well as the nurses and the other attendants. In this case commencing of the data gets easier. The
patient visits the ER room and waits there (King & King 2015). The nurses examines patient and
then the patient waits for the doctors to examine the patient. After the testing phase the patient
needs to waits for the processing of the entire scenario. After completion of the treatment
process, the data that are generated in the treatment process, gets stored in the data base of the
system and hence proper understanding of the financial aspect of the insurance company is
made. With the help of the newly designed map, the waiting time can be reduced to half of the
waiting time that was required earlier.
Consequences of the new State Value Stream Map
The consequences that will be received includes the fact that proper management of the
data can be made. This management of the data will be providing an ace in governing of the
9
VALUE STREAM MAP
treatment process (Jimmerson 2017). This ensures that the time that will be taken for the
treatment process reduces. This reduction in the treatment process will help in bettering of the
emergency treatment process.
The negative consequence that is present in the system includes the fact that despite
having advantages there is no direct advantage that is received (Suarez-Barraza, Miguel-Davila
& Vasquez-García 2016). This ensure that the revenue that is spent in implementing of the tool
will not be received in direct manner.
Conclusion
The dependency of the stages will be met as per the requirement of the time saving
process. With overlapping of the phases that are to be performed will be having a better impact
on reducing the time that is required in the treatment process of the patient in th emergency
department. This is one of the major reason that the usage of the Electronic data warehouse will
be beneficial in the commencing of the treatment process in the emergency department.
Recommendation
Recommendations are as follows: -
Usage of shifting of burden archetype
Usage of Electronic data warehouse.
VALUE STREAM MAP
treatment process (Jimmerson 2017). This ensures that the time that will be taken for the
treatment process reduces. This reduction in the treatment process will help in bettering of the
emergency treatment process.
The negative consequence that is present in the system includes the fact that despite
having advantages there is no direct advantage that is received (Suarez-Barraza, Miguel-Davila
& Vasquez-García 2016). This ensure that the revenue that is spent in implementing of the tool
will not be received in direct manner.
Conclusion
The dependency of the stages will be met as per the requirement of the time saving
process. With overlapping of the phases that are to be performed will be having a better impact
on reducing the time that is required in the treatment process of the patient in th emergency
department. This is one of the major reason that the usage of the Electronic data warehouse will
be beneficial in the commencing of the treatment process in the emergency department.
Recommendation
Recommendations are as follows: -
Usage of shifting of burden archetype
Usage of Electronic data warehouse.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
10
VALUE STREAM MAP
References
Andrade, P. F., Pereira, V. G., & Del Conte, E. G. (2016). Value stream mapping and lean
simulation: a case study in automotive company. The International Journal of Advanced
Manufacturing Technology, 85(1-4), 547-555.
Azizi, A. (2015). Designing a future value stream mapping to reduce lead time using SMED-A
case study. Procedia Manufacturing, 2, 153-158.
Henrique, D. B., Rentes, A. F., Godinho Filho, M., & Esposto, K. F. (2016). A new value stream
mapping approach for healthcare environments. Production Planning & Control, 27(1),
24-48.
Hung, S. H., Wang, P. C., Lin, H. C., Chen, H. Y., & Su, C. T. (2015). Integration of value
stream map and healthcare failure mode and effect analysis into six sigma methodology
to improve process of surgical specimen handling. Journal of healthcare
engineering, 6(3), 377-398.
Jimmerson, C. (2017). Value stream mapping for healthcare made easy. Productivity Press.
King, P. L., & King, J. S. (2015). Value stream mapping for the process industries: Creating a
roadmap for lean transformation. Productivity Press.
Lacerda, A. P., Xambre, A. R., & Alvelos, H. M. (2016). Applying Value Stream Mapping to
eliminate waste: a case study of an original equipment manufacturer for the automotive
industry. International Journal of Production Research, 54(6), 1708-1720.
VALUE STREAM MAP
References
Andrade, P. F., Pereira, V. G., & Del Conte, E. G. (2016). Value stream mapping and lean
simulation: a case study in automotive company. The International Journal of Advanced
Manufacturing Technology, 85(1-4), 547-555.
Azizi, A. (2015). Designing a future value stream mapping to reduce lead time using SMED-A
case study. Procedia Manufacturing, 2, 153-158.
Henrique, D. B., Rentes, A. F., Godinho Filho, M., & Esposto, K. F. (2016). A new value stream
mapping approach for healthcare environments. Production Planning & Control, 27(1),
24-48.
Hung, S. H., Wang, P. C., Lin, H. C., Chen, H. Y., & Su, C. T. (2015). Integration of value
stream map and healthcare failure mode and effect analysis into six sigma methodology
to improve process of surgical specimen handling. Journal of healthcare
engineering, 6(3), 377-398.
Jimmerson, C. (2017). Value stream mapping for healthcare made easy. Productivity Press.
King, P. L., & King, J. S. (2015). Value stream mapping for the process industries: Creating a
roadmap for lean transformation. Productivity Press.
Lacerda, A. P., Xambre, A. R., & Alvelos, H. M. (2016). Applying Value Stream Mapping to
eliminate waste: a case study of an original equipment manufacturer for the automotive
industry. International Journal of Production Research, 54(6), 1708-1720.
11
VALUE STREAM MAP
Sachdeva, K., Kumar, V., & Chaudhary, A. K. S. (2017). Gap Analysis of Value stream mapping
tool implementation in manufacturing operation using Fuzzy Topsis. International
Journal, 5(1), 145-147.
Suarez-Barraza, M. F., Miguel-Davila, J. Á., & Vasquez-García, C. F. (2016). Supply chain
value stream mapping: a new tool of operation management. International Journal of
Quality & Reliability Management, 33(4), 518-534.
Tamás, P. (2016). Application of value stream mapping at flexible manufacturing systems.
In Key Engineering Materials(Vol. 686, pp. 168-173). Trans Tech Publications.
Tyagi, S., Choudhary, A., Cai, X., & Yang, K. (2015). Value stream mapping to reduce the lead-
time of a product development process. International Journal of Production
Economics, 160, 202-212.
VALUE STREAM MAP
Sachdeva, K., Kumar, V., & Chaudhary, A. K. S. (2017). Gap Analysis of Value stream mapping
tool implementation in manufacturing operation using Fuzzy Topsis. International
Journal, 5(1), 145-147.
Suarez-Barraza, M. F., Miguel-Davila, J. Á., & Vasquez-García, C. F. (2016). Supply chain
value stream mapping: a new tool of operation management. International Journal of
Quality & Reliability Management, 33(4), 518-534.
Tamás, P. (2016). Application of value stream mapping at flexible manufacturing systems.
In Key Engineering Materials(Vol. 686, pp. 168-173). Trans Tech Publications.
Tyagi, S., Choudhary, A., Cai, X., & Yang, K. (2015). Value stream mapping to reduce the lead-
time of a product development process. International Journal of Production
Economics, 160, 202-212.
1 out of 12
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.