VUIS CONSULTING PTY LTD.
PROJECT PLAN [INSERT VERSION NUMBER]
[INSERT PROJECT NAME HERE]
[INSERT DATE HERE]
[INSERT AUTHOR NAME HERE]
[INSERT AUTHOR JOB TITLE HERE]
[INSERT AUTHOR EMAIL HERE]
VUIS Consulting Project Plan Page 1
[Insert Author name here]
PROJECT PLAN [INSERT VERSION NUMBER]
[INSERT PROJECT NAME HERE]
[INSERT DATE HERE]
[INSERT AUTHOR NAME HERE]
[INSERT AUTHOR JOB TITLE HERE]
[INSERT AUTHOR EMAIL HERE]
VUIS Consulting Project Plan Page 1
[Insert Author name here]
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
![Document Page](https://desklib.com/media/document/docfile/pages/vuis-consulting-pty-ltd-project-plan-t9zt/2024/09/08/7fa2c88d-b27a-41f4-8090-91c7c2caa0c3-page-2.webp)
Table of Contents
Introduction.................................................................................................................................. 3
Project scope............................................................................................................................... 3
Business case............................................................................................................................. 4
Project schedule and approach...................................................................................................4
Resource used............................................................................................................................ 7
Budget......................................................................................................................................... 8
Risks............................................................................................................................................ 9
Communication.......................................................................................................................... 10
Summary................................................................................................................................... 11
Bibliography............................................................................................................................... 12
VUIS Consulting Project Plan Page 2
[Insert Author name here]
Introduction.................................................................................................................................. 3
Project scope............................................................................................................................... 3
Business case............................................................................................................................. 4
Project schedule and approach...................................................................................................4
Resource used............................................................................................................................ 7
Budget......................................................................................................................................... 8
Risks............................................................................................................................................ 9
Communication.......................................................................................................................... 10
Summary................................................................................................................................... 11
Bibliography............................................................................................................................... 12
VUIS Consulting Project Plan Page 2
[Insert Author name here]
![Document Page](https://desklib.com/media/document/docfile/pages/vuis-consulting-pty-ltd-project-plan-t9zt/2024/09/08/599cecea-84ae-4b4c-adf2-131ff5a4e62d-page-3.webp)
Introduction
The main focus of the entire paper is on the organization “Yes Chemist” that furthers
aimed to prepare a project plan for the project “SAP/4HANA implementation” within the
organization by integrating different modules in order to provide proper operations to the
customers. The project plan was mainly prepared so that the project manager can follow the
plan during execution and can be capable for tracking for the progress of the project for
ensuring the SAP implementation project is on the track. Moreover, the project plan which was
generally developed as the information based on the risks, budget, schedule well as
communication plan.
Project scope
Project aim
The project successfully aims for implementing for the “Yes Chemist” so that the
organization will generally helpful in providing excellent services to the clients as well as can be
capable of managing the operations with the help of one single system. In addition to this, the
system will integrate different modules of analytics, management and accounting in order to
perform different types of operations with the help of one single system.
Project objectives
To undertake the work of SAP/4HANA implementation
To provide excellent customer service
To integrate the module of management, analytics with the new SAP system
Required quality standards
Needed standards Measurement metrics
Effective operations management If the SSAP system will manage all the
business operation of “Yes chemist” then the
system is operating properly thus
performance of the system is considered as
the measurement metrics.
Utilization of quality standards If the quality-based issues do not arise then it
can be ensured that the project manager
utilizes proper quality standards during the
VUIS Consulting Project Plan Page 3
[Insert Author name here]
The main focus of the entire paper is on the organization “Yes Chemist” that furthers
aimed to prepare a project plan for the project “SAP/4HANA implementation” within the
organization by integrating different modules in order to provide proper operations to the
customers. The project plan was mainly prepared so that the project manager can follow the
plan during execution and can be capable for tracking for the progress of the project for
ensuring the SAP implementation project is on the track. Moreover, the project plan which was
generally developed as the information based on the risks, budget, schedule well as
communication plan.
Project scope
Project aim
The project successfully aims for implementing for the “Yes Chemist” so that the
organization will generally helpful in providing excellent services to the clients as well as can be
capable of managing the operations with the help of one single system. In addition to this, the
system will integrate different modules of analytics, management and accounting in order to
perform different types of operations with the help of one single system.
Project objectives
To undertake the work of SAP/4HANA implementation
To provide excellent customer service
To integrate the module of management, analytics with the new SAP system
Required quality standards
Needed standards Measurement metrics
Effective operations management If the SSAP system will manage all the
business operation of “Yes chemist” then the
system is operating properly thus
performance of the system is considered as
the measurement metrics.
Utilization of quality standards If the quality-based issues do not arise then it
can be ensured that the project manager
utilizes proper quality standards during the
VUIS Consulting Project Plan Page 3
[Insert Author name here]
![Document Page](https://desklib.com/media/document/docfile/pages/vuis-consulting-pty-ltd-project-plan-t9zt/2024/09/08/8b8828a4-2210-4756-9a5c-90d42036ffbd-page-4.webp)
system implementation.
Business case
The organization “Yes Chemist” that is a pharmacy which has its headquarters in South
Melbourne. The pharmacy helps in giving effective health and beauty requirements for the
various clients in order to meet their requirement and additionally provides a number of
operations which are generally linked with the pharmaceuticals. In order to improve the
business operations further, the organization utilizes a review method for analyzing the areas in
which improvement can be made. It is analyzed that SAP/4HANA system will be beneficial for
the organization. In addition to this, the pharmacy also wants to add more modules of analytics,
accounting as well as management so that the operations related to this field can be performed
with the help of the newly implemented system.
Project schedule and approach
The schedule that is given below suggests that the undertaken project of SAP/4HANA
will be developed within 107.5 days. The project initiation phase gets accomplished in 33 days
whereas the closure phase in 19 days and the rest of the time is mainly used in system
implementation, installation, data conversion as well as testing.
WBS Task Name Duration Start Finish
0 SAP implementation 107.5 days Tue 25-07-17 Thu 21-12-17
1 Initiation Phase 33 days Tue 25-07-17 Thu 07-09-17
1.1 Project charter 4 days Tue 25-07-17 Fri 28-07-17
1.2 Project plan development 5 days Mon 31-07-17 Mon 04-09-17
1.3 Project status report 3 days Tue 05-09-17 Thu 07-09-17
1.4 Resource assigning 3 days Mon 31-07-17 Wed 02-08-17
1.5 Finishing the initiation phase 0 days Wed 02-08-17 Wed 02-08-17
2 Planning phase 100.25 days Thu 03-08-17 Thu 21-12-17
2.1 SDLC methodology 100.25 days Thu 03-08-17 Thu 21-12-17
2.1.1 Development phase 1 mon Thu 03-08-17 Wed 30-08-17
2.1.2 Testing user acceptance 1 mon Thu 31-08-17 Wed 27-09-17
2.1.3 Refurbishment of server rooms 3 mons Thu 28-09-17 Thu 21-12-17
2.1.4 Hardware purchase 1 mon Thu 28-09-17 Wed 25-10-17
VUIS Consulting Project Plan Page 4
[Insert Author name here]
Business case
The organization “Yes Chemist” that is a pharmacy which has its headquarters in South
Melbourne. The pharmacy helps in giving effective health and beauty requirements for the
various clients in order to meet their requirement and additionally provides a number of
operations which are generally linked with the pharmaceuticals. In order to improve the
business operations further, the organization utilizes a review method for analyzing the areas in
which improvement can be made. It is analyzed that SAP/4HANA system will be beneficial for
the organization. In addition to this, the pharmacy also wants to add more modules of analytics,
accounting as well as management so that the operations related to this field can be performed
with the help of the newly implemented system.
Project schedule and approach
The schedule that is given below suggests that the undertaken project of SAP/4HANA
will be developed within 107.5 days. The project initiation phase gets accomplished in 33 days
whereas the closure phase in 19 days and the rest of the time is mainly used in system
implementation, installation, data conversion as well as testing.
WBS Task Name Duration Start Finish
0 SAP implementation 107.5 days Tue 25-07-17 Thu 21-12-17
1 Initiation Phase 33 days Tue 25-07-17 Thu 07-09-17
1.1 Project charter 4 days Tue 25-07-17 Fri 28-07-17
1.2 Project plan development 5 days Mon 31-07-17 Mon 04-09-17
1.3 Project status report 3 days Tue 05-09-17 Thu 07-09-17
1.4 Resource assigning 3 days Mon 31-07-17 Wed 02-08-17
1.5 Finishing the initiation phase 0 days Wed 02-08-17 Wed 02-08-17
2 Planning phase 100.25 days Thu 03-08-17 Thu 21-12-17
2.1 SDLC methodology 100.25 days Thu 03-08-17 Thu 21-12-17
2.1.1 Development phase 1 mon Thu 03-08-17 Wed 30-08-17
2.1.2 Testing user acceptance 1 mon Thu 31-08-17 Wed 27-09-17
2.1.3 Refurbishment of server rooms 3 mons Thu 28-09-17 Thu 21-12-17
2.1.4 Hardware purchase 1 mon Thu 28-09-17 Wed 25-10-17
VUIS Consulting Project Plan Page 4
[Insert Author name here]
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
![Document Page](https://desklib.com/media/document/docfile/pages/vuis-consulting-pty-ltd-project-plan-t9zt/2024/09/08/dc0c9a58-c9dd-4a21-9cfe-8cd1a8a6dca8-page-5.webp)
2.2 Server installation 21 days Thu 28-09-17 Thu 26-10-17
2.3 Completion of planning phase 0 days Thu 26-10-17 Thu 26-10-17
3 Server installation phase 72 days Thu 03-08-17 Fri 10-11-17
3.1 Equipment and infrastructure 3 days Thu 03-08-17 Mon 07-08-17
3.2 Server room modifications 13.5 days Thu 28-09-17 Tue 17-10-17
3.2.1 Installation of cables 12 hrs Thu 28-09-17 Fri 29-09-17
3.2.2 Commencing cabling 12 days Fri 29-09-17 Tue 17-10-17
3.3 HP server hardware 18.5 days Tue 17-10-17 Fri 10-11-17
3.4 Installation work of technical
software 3 days Wed 25-10-17 Mon 30-10-17
3.5 Installation of server 0 days Mon 30-10-17 Mon 30-10-17
4 System installation phase 52 days Fri 29-09-17 Tue 12-12-17
4.1 Requirement Phase 24 days Mon 30-10-17 Fri 01-12-17
4.1.1 Functional requirements of new
system design 10 days Mon 30-10-17 Mon 13-11-17
4.1.2 User expectations management 11 days Mon 13-11-17 Mon 27-11-17
4.1.3 Designing and implementing
managing design 14 days Mon 13-11-17 Fri 01-12-17
4.2 Data conversion 52 days Fri 29-09-17 Tue 12-12-17
4.2.1 Legacy data understanding 4 days Fri 01-12-17 Thu 07-12-17
4.2.2 Setting automated data extractor
scripts development 3 days Thu 07-12-17 Tue 12-12-17
4.2.3 Data validation 4 days Wed 25-10-17 Tue 31-10-17
4.2.4 Script development for loading
data 3 days Tue 31-10-17 Fri 03-11-17
4.2.5 Real time testing 4 days Fri 29-09-17 Thu 05-10-17
4.2.6 Defects rectification 3 days Thu 05-10-17 Tue 10-10-17
4.2.7 Analysis of post migration 1 wk. Tue 10-10-17 Tue 17-10-17
4.3 Completion of system installation
phase 0 days Tue 17-10-17 Tue 17-10-17
5 Implementation Phase 47 days Tue 17-10-17 Thu 21-12-17
VUIS Consulting Project Plan Page 5
[Insert Author name here]
2.3 Completion of planning phase 0 days Thu 26-10-17 Thu 26-10-17
3 Server installation phase 72 days Thu 03-08-17 Fri 10-11-17
3.1 Equipment and infrastructure 3 days Thu 03-08-17 Mon 07-08-17
3.2 Server room modifications 13.5 days Thu 28-09-17 Tue 17-10-17
3.2.1 Installation of cables 12 hrs Thu 28-09-17 Fri 29-09-17
3.2.2 Commencing cabling 12 days Fri 29-09-17 Tue 17-10-17
3.3 HP server hardware 18.5 days Tue 17-10-17 Fri 10-11-17
3.4 Installation work of technical
software 3 days Wed 25-10-17 Mon 30-10-17
3.5 Installation of server 0 days Mon 30-10-17 Mon 30-10-17
4 System installation phase 52 days Fri 29-09-17 Tue 12-12-17
4.1 Requirement Phase 24 days Mon 30-10-17 Fri 01-12-17
4.1.1 Functional requirements of new
system design 10 days Mon 30-10-17 Mon 13-11-17
4.1.2 User expectations management 11 days Mon 13-11-17 Mon 27-11-17
4.1.3 Designing and implementing
managing design 14 days Mon 13-11-17 Fri 01-12-17
4.2 Data conversion 52 days Fri 29-09-17 Tue 12-12-17
4.2.1 Legacy data understanding 4 days Fri 01-12-17 Thu 07-12-17
4.2.2 Setting automated data extractor
scripts development 3 days Thu 07-12-17 Tue 12-12-17
4.2.3 Data validation 4 days Wed 25-10-17 Tue 31-10-17
4.2.4 Script development for loading
data 3 days Tue 31-10-17 Fri 03-11-17
4.2.5 Real time testing 4 days Fri 29-09-17 Thu 05-10-17
4.2.6 Defects rectification 3 days Thu 05-10-17 Tue 10-10-17
4.2.7 Analysis of post migration 1 wk. Tue 10-10-17 Tue 17-10-17
4.3 Completion of system installation
phase 0 days Tue 17-10-17 Tue 17-10-17
5 Implementation Phase 47 days Tue 17-10-17 Thu 21-12-17
VUIS Consulting Project Plan Page 5
[Insert Author name here]
![Document Page](https://desklib.com/media/document/docfile/pages/vuis-consulting-pty-ltd-project-plan-t9zt/2024/09/08/0deec63f-89ce-422f-95d6-6087b368a59e-page-6.webp)
5.1 Installation of hardware 10 days Tue 17-10-17 Tue 31-10-17
5.2 Configuration of SAP system 15 days Tue 31-10-17 Tue 21-11-17
5.3 System testing 12 days Tue 21-11-17 Thu 07-12-17
5.4 End user training 10 days Thu 07-12-17 Thu 21-12-17
5.5 Implementation phase testing 0 days Thu 21-12-17 Thu 21-12-17
6 Integration and testing phase 13 days Tue 31-10-17 Fri 17-11-17
6.1 End to end testing 10 days Tue 31-10-17 Tue 14-11-17
6.2 Testing system integration 1 day Tue 14-11-17 Wed 15-11-17
6.3 Integration of the testing phase 2 days Wed 15-11-17 Fri 17-11-17
7 Closure phase 37 days Mon 30-10-17 Wed 20-12-17
7.1 Documentation and training 23 days Mon 30-10-17 Thu 30-11-17
7.1.1 Developing functionality manuals 4 days Fri 17-11-17 Thu 23-11-17
7.1.2 Reviewing the SAP business
standards 5 days Thu 23-11-17 Thu 30-11-17
7.1.3 Customization of system 2 days Mon 13-11-17 Tue 14-11-17
7.1.4 Proper sessions of training 3 days Mon 30-10-17 Thu 02-11-17
7.2 Acceptance, testing and sign off 19 days Thu 02-11-17 Wed 29-11-17
7.2.1 Hardware and software
installation 4 days Thu 02-11-17 Wed 08-11-17
7.2.2 Completion of data conversion 6 days Wed 08-11-17 Thu 16-11-17
7.2.3 Training completion 5 days Thu 16-11-17 Thu 23-11-17
7.2.4 User acceptance testing
completion 4 days Thu 23-11-17 Wed 29-11-17
7.3 Closure phase 3 wks. Wed 29-11-17 Wed 20-12-17
7.4 Completion of training and sign off 0 days Wed 20-12-17 Wed 20-12-17
VUIS Consulting Project Plan Page 6
[Insert Author name here]
5.2 Configuration of SAP system 15 days Tue 31-10-17 Tue 21-11-17
5.3 System testing 12 days Tue 21-11-17 Thu 07-12-17
5.4 End user training 10 days Thu 07-12-17 Thu 21-12-17
5.5 Implementation phase testing 0 days Thu 21-12-17 Thu 21-12-17
6 Integration and testing phase 13 days Tue 31-10-17 Fri 17-11-17
6.1 End to end testing 10 days Tue 31-10-17 Tue 14-11-17
6.2 Testing system integration 1 day Tue 14-11-17 Wed 15-11-17
6.3 Integration of the testing phase 2 days Wed 15-11-17 Fri 17-11-17
7 Closure phase 37 days Mon 30-10-17 Wed 20-12-17
7.1 Documentation and training 23 days Mon 30-10-17 Thu 30-11-17
7.1.1 Developing functionality manuals 4 days Fri 17-11-17 Thu 23-11-17
7.1.2 Reviewing the SAP business
standards 5 days Thu 23-11-17 Thu 30-11-17
7.1.3 Customization of system 2 days Mon 13-11-17 Tue 14-11-17
7.1.4 Proper sessions of training 3 days Mon 30-10-17 Thu 02-11-17
7.2 Acceptance, testing and sign off 19 days Thu 02-11-17 Wed 29-11-17
7.2.1 Hardware and software
installation 4 days Thu 02-11-17 Wed 08-11-17
7.2.2 Completion of data conversion 6 days Wed 08-11-17 Thu 16-11-17
7.2.3 Training completion 5 days Thu 16-11-17 Thu 23-11-17
7.2.4 User acceptance testing
completion 4 days Thu 23-11-17 Wed 29-11-17
7.3 Closure phase 3 wks. Wed 29-11-17 Wed 20-12-17
7.4 Completion of training and sign off 0 days Wed 20-12-17 Wed 20-12-17
VUIS Consulting Project Plan Page 6
[Insert Author name here]
![Document Page](https://desklib.com/media/document/docfile/pages/vuis-consulting-pty-ltd-project-plan-t9zt/2024/09/08/011ef8f5-8922-4284-8c25-97db5999d7ef-page-7.webp)
Resource used
The resources which are utilized in the project are reflected from the screenshot that is
taken from the MS project file.
Figure 1: Resource screenshot
(Source: Created by Author)
In addition to this, the resources who are generally linked in the project that are mainly
reflected in context to power and interest of the project stakeholders.
Stakeholders Interest Impact
Business analyst High Low
Trainer Low Low
Project manager High High
Technical writer Low High
Application manager Low High
System integrator Low High
Administrative officer Low High
Data entry officer Low High
VUIS Consulting Project Plan Page 7
[Insert Author name here]
The resources which are utilized in the project are reflected from the screenshot that is
taken from the MS project file.
Figure 1: Resource screenshot
(Source: Created by Author)
In addition to this, the resources who are generally linked in the project that are mainly
reflected in context to power and interest of the project stakeholders.
Stakeholders Interest Impact
Business analyst High Low
Trainer Low Low
Project manager High High
Technical writer Low High
Application manager Low High
System integrator Low High
Administrative officer Low High
Data entry officer Low High
VUIS Consulting Project Plan Page 7
[Insert Author name here]
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
![Document Page](https://desklib.com/media/document/docfile/pages/vuis-consulting-pty-ltd-project-plan-t9zt/2024/09/08/b48e19b5-9024-4abd-a946-41738194dd6e-page-8.webp)
Budget
The budget that is given below showcases that the project of Yes chemist will generally
gets finished within the budget $562,860. The figure which is given replicates elaborates
detailed budget for the project.
Figure 2: Budget
(Source: Created by Author)
VUIS Consulting Project Plan Page 8
[Insert Author name here]
The budget that is given below showcases that the project of Yes chemist will generally
gets finished within the budget $562,860. The figure which is given replicates elaborates
detailed budget for the project.
Figure 2: Budget
(Source: Created by Author)
VUIS Consulting Project Plan Page 8
[Insert Author name here]
![Document Page](https://desklib.com/media/document/docfile/pages/vuis-consulting-pty-ltd-project-plan-t9zt/2024/09/08/953a54c3-246c-44ee-ab39-95af5e06d918-page-9.webp)
Risks
Risk Description Impact Probability Responsible Mitigation
Compatibility
issues in the
modules
It generally
led to issues
in integration
of the various
modules and
due to
compatibility
issues, the
work
associated
with the
module
integration
will be
obstructed.
High High Technical
engineer
The
compatibility
issues need
to resolved b
handling the
effectively.
Investment in
infrastructure
As suitable
budget is not
used for the
project
therefore the
application
does not
function
properly.
High High Financial
manager
Proper
amount of
money
should be
allocated for
the project so
that so
functionalities
get
compromised
due to low
budget.
Lack of
support
Due to
improper
support,
frustration
Medium Medium HR manager Proper
support
should be
given to the
VUIS Consulting Project Plan Page 9
[Insert Author name here]
Risk Description Impact Probability Responsible Mitigation
Compatibility
issues in the
modules
It generally
led to issues
in integration
of the various
modules and
due to
compatibility
issues, the
work
associated
with the
module
integration
will be
obstructed.
High High Technical
engineer
The
compatibility
issues need
to resolved b
handling the
effectively.
Investment in
infrastructure
As suitable
budget is not
used for the
project
therefore the
application
does not
function
properly.
High High Financial
manager
Proper
amount of
money
should be
allocated for
the project so
that so
functionalities
get
compromised
due to low
budget.
Lack of
support
Due to
improper
support,
frustration
Medium Medium HR manager Proper
support
should be
given to the
VUIS Consulting Project Plan Page 9
[Insert Author name here]
![Document Page](https://desklib.com/media/document/docfile/pages/vuis-consulting-pty-ltd-project-plan-t9zt/2024/09/08/746f3125-c1ce-41c6-ab03-c1fe69ea4b38-page-10.webp)
within the
project team
arises that
further
causes a lot
of issues.
project team
so that they
can finish the
work.
Appropriate
training
As the staffs
are not
comfortable
with the new
system which
generally
face different
types of
challenges
for
undertaking
different
types of
operations.
Medium Medium Trainer Proper
training
facility should
be given to
the team
Scope creep The problem
of scope
creep creates
obstruction in
project
progress.
Medium Medium Managers Managemen
t of changes
in the project
is necessary
for avoiding
the chances
of scope
creep.
Communication
Type Audience Message Responsible Frequency Vehicle
Kick off Team
member
Discussion on
project
objective
Project
manager
Once Email
VUIS Consulting Project Plan Page 10
[Insert Author name here]
project team
arises that
further
causes a lot
of issues.
project team
so that they
can finish the
work.
Appropriate
training
As the staffs
are not
comfortable
with the new
system which
generally
face different
types of
challenges
for
undertaking
different
types of
operations.
Medium Medium Trainer Proper
training
facility should
be given to
the team
Scope creep The problem
of scope
creep creates
obstruction in
project
progress.
Medium Medium Managers Managemen
t of changes
in the project
is necessary
for avoiding
the chances
of scope
creep.
Communication
Type Audience Message Responsible Frequency Vehicle
Kick off Team
member
Discussion on
project
objective
Project
manager
Once Email
VUIS Consulting Project Plan Page 10
[Insert Author name here]
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
![Document Page](https://desklib.com/media/document/docfile/pages/vuis-consulting-pty-ltd-project-plan-t9zt/2024/09/08/68b3d933-288d-405b-88d4-da5c32d71d62-page-11.webp)
Progress
report
Project team
leader
Focuses on
status report
Project
manager
Monthly Email/Face
to face
Monthly
report
Project
leader
Provides
information
about the
allocated
budget
Project
manager
Monthly Email
/face to
face
Weekly
report
Project team Provides
information
about the
financial
expenditure.
Project team
leader
Weekly Email /face
to face
Training
report
Project
manager
Proper
training
facility is
needed to the
project team
Team leader Closure phase Email /face
to face
Summary
It can be concluded It can be concluded within the entire report with effective
implementation of SAP/4HANA generally face a lot of issues which are mainly linked with the
entire project. The issues that are generally determined within the project needs to be resolved
by undertaking a number of steps. In addition to this, it is analyzed that SAP/4HANA
implementation is quite beneficial for the entire organization as well as for the customers.
Moreover, proper communication is also provided that includes proper way of communication
between the project team for avoiding communication related gaps.
VUIS Consulting Project Plan Page 11
[Insert Author name here]
report
Project team
leader
Focuses on
status report
Project
manager
Monthly Email/Face
to face
Monthly
report
Project
leader
Provides
information
about the
allocated
budget
Project
manager
Monthly Email
/face to
face
Weekly
report
Project team Provides
information
about the
financial
expenditure.
Project team
leader
Weekly Email /face
to face
Training
report
Project
manager
Proper
training
facility is
needed to the
project team
Team leader Closure phase Email /face
to face
Summary
It can be concluded It can be concluded within the entire report with effective
implementation of SAP/4HANA generally face a lot of issues which are mainly linked with the
entire project. The issues that are generally determined within the project needs to be resolved
by undertaking a number of steps. In addition to this, it is analyzed that SAP/4HANA
implementation is quite beneficial for the entire organization as well as for the customers.
Moreover, proper communication is also provided that includes proper way of communication
between the project team for avoiding communication related gaps.
VUIS Consulting Project Plan Page 11
[Insert Author name here]
![Document Page](https://desklib.com/media/document/docfile/pages/vuis-consulting-pty-ltd-project-plan-t9zt/2024/09/08/6f6f2ced-2383-42eb-9a7e-53a4f118cd2a-page-12.webp)
Bibliography
Badewi, A., 2016. The impact of project management (PM) and benefits management (BM)
practices on project success: Towards developing a project benefits governance
framework. International Journal of Project Management, 34(4), pp.761-778.
Binder, J., 2016. Global project management: communication, collaboration and management
across borders. Routledge.
De Carvalho, M.M., Patah, L.A. and de Souza Bido, D., 2015. Project management and its
effects on project success: Cross-country and cross-industry comparisons. International Journal
of Project Management, 33(7), pp.1509-1522.
Heldman, K., 2018. PMP: project management professional exam study guide. John Wiley &
Sons.
Hornstein, H.A., 2015. The integration of project management and organizational change
management is now a necessity. International Journal of Project Management, 33(2), pp.291-
298.
Joslin, R. and Müller, R., 2015. Relationships between a project management methodology and
project success in different project governance contexts. International Journal of Project
Management, 33(6), pp.1377-1392.
Kaiser, M.G., El Arbi, F. and Ahlemann, F., 2015. Successful project portfolio management
beyond project selection techniques: Understanding the role of structural
alignment. International Journal of Project Management, 33(1), pp.126-139.
Kerzner, H., 2017. Project management metrics, KPIs, and dashboards: a guide to measuring
and monitoring project performance. John Wiley & Sons.
Kerzner, H., 2018. Project management best practices: Achieving global excellence. John Wiley
& Sons.
Kivilä, J., Martinsuo, M. and Vuorinen, L., 2017. Sustainable project management through
project control in infrastructure projects. International Journal of Project Management, 35(6),
pp.1167-1183.
Meredith, J.R., Mantel Jr, S.J. and Shafer, S.M., 2017. Project management: a managerial
approach. John Wiley & Sons.
Milosevic, D.Z. and Martinelli, R.J., 2016. Project management toolbox: tools and techniques for
the practicing project manager. John Wiley & Sons.
Svejvig, P. and Andersen, P., 2015. Rethinking project management: A structured literature
review with a critical look at the brave new world. International Journal of Project
Management, 33(2), pp.278-290.
Todorović, M.L., Petrović, D.Č., Mihić, M.M., Obradović, V.L. and Bushuyev, S.D., 2015. Project
success analysis framework: A knowledge-based approach in project
management. International Journal of Project Management, 33(4), pp.772-783.
VUIS Consulting Project Plan Page 12
[Insert Author name here]
Badewi, A., 2016. The impact of project management (PM) and benefits management (BM)
practices on project success: Towards developing a project benefits governance
framework. International Journal of Project Management, 34(4), pp.761-778.
Binder, J., 2016. Global project management: communication, collaboration and management
across borders. Routledge.
De Carvalho, M.M., Patah, L.A. and de Souza Bido, D., 2015. Project management and its
effects on project success: Cross-country and cross-industry comparisons. International Journal
of Project Management, 33(7), pp.1509-1522.
Heldman, K., 2018. PMP: project management professional exam study guide. John Wiley &
Sons.
Hornstein, H.A., 2015. The integration of project management and organizational change
management is now a necessity. International Journal of Project Management, 33(2), pp.291-
298.
Joslin, R. and Müller, R., 2015. Relationships between a project management methodology and
project success in different project governance contexts. International Journal of Project
Management, 33(6), pp.1377-1392.
Kaiser, M.G., El Arbi, F. and Ahlemann, F., 2015. Successful project portfolio management
beyond project selection techniques: Understanding the role of structural
alignment. International Journal of Project Management, 33(1), pp.126-139.
Kerzner, H., 2017. Project management metrics, KPIs, and dashboards: a guide to measuring
and monitoring project performance. John Wiley & Sons.
Kerzner, H., 2018. Project management best practices: Achieving global excellence. John Wiley
& Sons.
Kivilä, J., Martinsuo, M. and Vuorinen, L., 2017. Sustainable project management through
project control in infrastructure projects. International Journal of Project Management, 35(6),
pp.1167-1183.
Meredith, J.R., Mantel Jr, S.J. and Shafer, S.M., 2017. Project management: a managerial
approach. John Wiley & Sons.
Milosevic, D.Z. and Martinelli, R.J., 2016. Project management toolbox: tools and techniques for
the practicing project manager. John Wiley & Sons.
Svejvig, P. and Andersen, P., 2015. Rethinking project management: A structured literature
review with a critical look at the brave new world. International Journal of Project
Management, 33(2), pp.278-290.
Todorović, M.L., Petrović, D.Č., Mihić, M.M., Obradović, V.L. and Bushuyev, S.D., 2015. Project
success analysis framework: A knowledge-based approach in project
management. International Journal of Project Management, 33(4), pp.772-783.
VUIS Consulting Project Plan Page 12
[Insert Author name here]
1 out of 12
Related Documents
![logo.png](/_next/image/?url=%2F_next%2Fstatic%2Fmedia%2Flogo.6d15ce61.png&w=640&q=75)
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.