Running head: WEEKLY PROGRESS REPORT
WEEKLY PROGRESS REPORT
Name of the Student:
Name of the University:
Author Note:

ITC571 - WEEKLY PROGRESS REPORT
ID: 11643188 NAME: Dileep Kumar
PROJECT TITLE: Automatic Wireless Health Monitoring
WEEK NO: 2 DATE: [Please fill in the date]
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
Initialization of
the project
The planning of the project is needed to be
done. In this stage the identification of the
problem and the steps required for the
initialization of the project are planned.
The topic chosen for the project is
automatic wireless health monitoring
system. Through the wireless health
monitoring system, the management of the
health care system can be done
accordingly.
The identification off the project topic is
relevant as the use of the wireless
technology in the health care system is a
type of emerging technology.
ISSUES : There are certain issues regarding the selection of the topic. The use of the emerging technology has different examples and there were many
options available. It was problematic for selecting a particular topic for the research.
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The decision is
taken to work
on finding the
different
aspects of
automatic
wireless health
monitoring
system. In
order to this
this step is the
[Please fill in the date] The topic is selected. The selection of the
particular topic from various options is
done on the basis of certain parameters.
Apart from that , it has been seen that the
solution is going to be feasible for the
understanding of the emerging technology.
yes

initial stage.
ID: 11643188 NAME: Dileep Kumar
PROJECT TITLE: Automatic Wireless Health Monitoring
WEEK NO: 3 DATE: [Please fill in the date]
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
The gathering
of the
requirements
of the project
This is the second stage of the project. In
this stage the gathering of the
requirements is done for the development
of the project.
The initial requirements for the
development of the software is done in this
stage. The significance of the requirements
are understood in a proper way so that the
documentation of the requirements is done
in a proper way.
It has been seen for the carrying on the
research, the understanding of the wireless
system and its relevance in the health
monitoring system are needed to be done.
In order to do this the review of the
literature from the different journals and
articles is needed to be done.
ISSUES: The review of the literature is done for understanding the concept of the wireless system and its application on the health care industry. The
selection of the article wad problematic, as the selection of the peer reviewed journals are needed to be consult during the development of the literature
review.
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The gathering
of the
requirements is
concern about
the essential
requirements
needed for the
proper
development of
[Please fill in the date]
The review of the literature is done for the
better understanding the use of wireless
technology in the health care sector.
yes

the project.
Apart from that
, it has been
seen that for
conducting the
research on the
topic needs the
review of the
literature.
ID: 11643188 NAME: Dileep Kumar
PROJECT TITLE: Automatic Wireless Health Monitoring
WEEK NO: 4 DATE: [Please fill in the date]
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
Making the
planning for
the project.
In this stage the planning for the project is
done. The planning is the blueprint for
execution of the project.
The planning for the further procedure
regarding the research for the development
of the wireless technology in the health
care system is evaluated in this stage.
The procedure has done in a proper way.
ISSUES: During the development of the project, it has been seen that there is a chance that the planning phase will become complicated. In order to make
the project planning simple and effective there is a need for the proper understanding of the project.
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
It has been [Please fill in the date] The planning is done in a proper way. The yes

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Automatic Wireless Health Monitoring Report using Cloud Computing
|8
|869
|75

Automatic Wireless Health Monitoring Report System
|15
|1935
|457

Progress Report for Near Field Communication (NFC) Project
|7
|1038
|75

Ethical Issues Jurisdiction in Social Networking for Organizations
|15
|2769
|254

MN691 Research Methods and Project Design
|30
|6018
|236

Project Status Report
|6
|920
|55