INTRODUCTION...........................................................................................................................3
Procurement alternative to be used..................................................................................................3
Work Breakdown Structure.............................................................................................................5
Cost Breakdown Structure...............................................................................................................7
Develop a Network Diagram.........................................................................................................10
Project Management and Tracking Plans for Delivery..................................................................12
Plan for Analysing Delays.............................................................................................................14
CONCLUSION..............................................................................................................................16
REFERENCES..............................................................................................................................17
Project Management for Wolfron City Tourism Development_2

INTRODUCTION
Project management can be defined as the process of planning, control as well as
coordination of a project from its initiation to completion (Abate, Bonafini and Ferrari, 2022).
The primary aim of project management is to ensure that the client's requirements are met and
that the project is completed on time within the budget without any compromise on the quality
standards. There are different components of project management such as planning, developing a
work breakdown structure, scheduling as well as monitoring and control. The project manager is
responsible for overlooking the different project activities as well as ensuring that the team
members are aware of their respective roles as well as responsibilities. The respective report is
based on Wolfron City that has an approximate population of 1 million. The goal of the city is to
boost its tourism sector for which £1billion is available for the redevelopment project. The report
will provide recommendations as well as procurement alternatives will be provided. Apart from
this, the report will also include a work breakdown structure, a cost breakdown structure as well
as a network diagram to facilitate a better understanding.
Procurement alternative to be used
Procurement can be defined as the process that involves each and every activity that is
involved in obtaining the goods as well as services that are needed to support the daily operations
or carry out a project in a smooth manner. The different activities that are included in
procurement are sourcing, negotiating terms, purchasing items, receiving as well as inspecting
the goods and lastly maintaining the records of all these steps in the process. In context of the
respective project, the Wolfron City wants to boost its tourism sector and in order to do so, the
city has planned to expand as well as upgrade the overall infrastructure of the city, provision for
extra housing as well as leisure facilities along with other needs (Chaudhury, Alam and Dooty,
2022). It can be stated that the procurement for this project would require various activities to
ensure that the project is undertaken in a smooth manner. The different activities can include
planning about what changes have to be made to the existing infrastructure. Once this is done,
the next step would be to develop a list of the different raw materials that will be required to
undertake the project effectively. In order to improve the infrastructure, the existing
transportation will be improved and also, water supplies across the city will also be developed.
This is important because it will ensure that adequate facilities are available to the tourists and
Project Management for Wolfron City Tourism Development_3

that they are able to enjoy their stay within the city. Apart from this, telecommunications will
also be improved and in order to introduce these changes, various raw materials will be required
such as water pipes, new transports will be introduced. This will be done mainly to improve the
infrastructure for the tourists. It will also be ensured that appropriate planning is done to check
the amount of funding that will be required for each of these projects. It is important to
understand that planning helps in ensuring that the appropriate resources are available and that
the project is conducted in an effective manner (Bouchard, Fritz and Sjöberg, 2022). An
infrastructure development plan will also be undertaken to make sure that the overall activities as
well as their costs can be analysed and kept a track of. Enough transportation facilities as well as
means should be made available to the tourists to make sure that they are able to explore the
different parts of the city in an effective manner.
Appropriately designed as well as adequate provision for housing will also be made
available for the tourists. The reason behind this is that the tourists will have proper as well as
adequate facilities during their stay. This is an important factor that will ensure that the overall
project is conducted in an effective manner and that the tourists get a positive impression of the
city as well as its infrastructure. Tourists place a great importance on the overall infrastructure as
well as the facilities within the city they visit. It is important to make sure that these procurement
activities are taken into account and that the goals as well as objectives are achieved. This is
because it helps in ensuring that the tourists are able to have a good time as well as enjoy their
trip and stay. Water as well as other basic facilities should be taken care of as well as made
available so that there is an increase in the tourism of the place (Tenera and Varajão, 2022).
There will be guaranteed that appropriate planning is done to check the amount of funding that
will be required for each of these projects. It is important to realize that planning helps in
ensuring that the appropriate resources are available and that the project is conducted in an
effective manner. An infrastructure development plan will also be undertaken to make sure that
the human activity as well as their costs can be analysed and kept a track of (Beljan, Dolinar and
Hodges, 2022). The housing provisions that will be made available for the tourists will include
resorts, hotels as well as home stays. This will ensure that there are adequate housing facilities
for the tourists so that they are able to explore the place in a much more efficient manner. It is
important to take these procurement activities into account to make sure that the overall
experience of the tourists is effective and they would want to visit the city again.
Project Management for Wolfron City Tourism Development_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project Management and Tracking Plans for Delivery
|16
|4859
|224

Advance Project Planning and Control
|19
|4998
|438

General Facilities and Infrastructure in Utopia
|51
|3715
|74

Project Management for Music Event by Transport for London
|17
|2397
|470

Upgrade of Network in the University
|15
|2380
|290

Environment Policy for Sustainable Development in Koala City
|30
|7105
|194