The assignment content is about creating a work breakdown structure (WBS) for installing a new sign board in CQU campus. The WBS includes tasks such as designing the sign board, printing it, removing old signatures, and implementing the new signage. It also provides a Gantt chart and project schedule table to visualize the timeline of the project.