Running head: PROJECT MANAGEMENT
Project Management
Name of the Student
Name of the University
Author Note:
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1PROJECT MANAGEMENT
Table of Contents
Activity 1A..........................................................................................................................2
Activity 1B...........................................................................................................................3
Activity 1C...........................................................................................................................4
Activity 1D..........................................................................................................................5
Activity 2A..........................................................................................................................5
Activity 2B...........................................................................................................................6
Activity 2C...........................................................................................................................6
Activity 2D..........................................................................................................................7
Activity 3A..........................................................................................................................7
Activity 3B...........................................................................................................................8
References............................................................................................................................9
Document Page
2PROJECT MANAGEMENT
Activity 1A
1. WBS stands for Work Breakdown Structure is known to be an important project
deliverable which helps in organizing the teamwork in the manageable section.
2. WBS helps in defining the scope in the given measurable chucks so that given project
can be completed in given time. WBS aims to provide details and definition in project (Kerzner
& Kerzner, 2017).
3. MindView WBS is a well-known software tool which is needed creating WBS. The
work breakdown structure can bring huge number of benefits like defining and organizing the
given project of greenhouse organization. By allocating of time and estimation of section in
WBS of the scheduled project and proper budget can be developed.
4.The top level of the WBS mainly includes outcome of this greenhouse constructing
organization (Fleming & Koppelman, 2016). The sub-section mainly comes up with work
packages for assigning the work of this construction organization.
5. One of the biggest tool and technique is all about training in various department which
are involved in this Greenhouse constructing company.
Document Page
3PROJECT MANAGEMENT
Fig 1: Work Breakdown Structure for Greenhouse Constructing Organization
(Source: Created by Author)
Activity 1B
1. Deliverables in project can be defined as proper goods and services which will be
provided on the completion of this greenhouse constructing company.
2. Deliverables are either tangible or intangible part of the whole development process.
It can provide proper characteristics of this greenhouse constructing organization
(Fleming & Koppelman, 2016).
3. The duration and effort involved in project are mainly measured after the
competition of each milestone of the project.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
4PROJECT MANAGEMENT
4. There is four kind of dependency which tends to exit in the project like finish to start,
start to start, finish to start and lastly start to finish.
5. Gantt chart can be defined as the visual view of the task which is scheduled over the
time (Heagney, 2016). Gantt chart is mainly required in the planning phase of the
project of the required sizes which is useful method of understanding the schedule of
the project.
6.
Fig 2: Gantt Chart for Greenhouse Construction Organization
(Source: Created by Author)
Activity 1C
1. Project Schedule can be defined as method of communicating the list of task collected
in the required thing. Proper organizational resources are needed for completing the
required task on time.
Document Page
5PROJECT MANAGEMENT
2. Project schedule of this greenhouse construct company is collecting the various needs
of the work (Turner, 2016).
3. The project schedule tools and techniques are needed for having an understanding
concerning schedule process like critical path, critical chain, schedule compression,
crashing and fast-tracking.
4. Also, it comprises of proper utilization of resources and modelling techniques. It also
tends to address the modelling techniques and scheduling tool and lastly analysis of
schedule network.
Activity 1D
1. Schedule can be defined as target baseline which is originally approved in project
schedule. It is mainly agreed by the stakeholders of any project before beginning.
2. A schedule baseline can be expected to be completed in the given time. It focusses on
proper estimation of resources of this greenhouse construction project (Binder, 2016).
It is considered to be an important aspect for understanding the schedule which is
seen from comparative measures.
3. Communication management tends to play a key role in keeping various individual in
a loop. The whole method of communication planning is needed for defining the type
of information which is to be delivered in the project. Communication aims to play a
key role in this project task.
4. Project managers are mainly responsible for understanding the guideline of different
aspect of this greenhouse construction organization (Verzuh, 2015).
5. By realizing the main goal and purpose of this project management plan, the
manager can easily be understanding project goals.
Document Page
6PROJECT MANAGEMENT
Activity 2A
1. Proper monitoring of the progress of this greenhouse construction organization is all
about keeping track of different parts of project.
2. A large number of projects comes up with different team members so that it can
handle the various aspect of the project (Schwalbe 2015). There are different kind of
parameters needed for understanding the schedule, budget and monitoring of
available resources.
3. Monitoring of this greenhouse construction project can bring huge number of
benefits like understanding the expectation of the project, monitoring on regular
interval, making a choice of data collection and lastly adjusting expectation.
Monitoring of this project mainly requires proper understanding concerning
expectation.
4. If there is any kind of missed deadline in the project, then it can kick-off the whole
project. There are some other parts of collecting a project for keeping track of it
(Lock, 2017). Spreadsheets are considered to be versatile way of keeping a track of
task, responsibility and lastly proper assign deadlines.
Activity 2B
1. The baseline of the project helps in understanding the how the performance can
deviate from the plan of this project. A project baseline is needed for defining cost,
scope and schedule of this greenhouse constructing organization. It is mainly
documented before project execution and various activities which can be defined
before execution and understanding the control activities (Heldman, 2018).
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7PROJECT MANAGEMENT
2. In the domain of project management, variance can be defined as a measurable
change of the given unknown standard. Variance comes up with different kind of
meaning than what can be accomplished.
3. There is only one particular method for comparing the position or even status in the
project with earlier version of the project.
4. It can be considered to be convenient for the baseline data to be easily planned for
actual data (Verzuh, 2015). The variance is provided between them by the help of
variance table.
Activity 2C
1. Change control can be defined as a proper kind of method which is needed for
managing all the required changes in the project.
2. The main task is all about understanding the required kind of changes which are
documented. It focusses on certain number of services which can affect the resources
to be used properly (Kerzner, 2017).
3. It comes up with a series of steps like document the change request, formal
assessment, planning, design and testing, implementation and review.
4. IT based changes are mainly inclusive of some kind of additional features which
tends to exit in the given software. It is all about installation of patches along with
upgrading the present network.
Document Page
8PROJECT MANAGEMENT
Activity 2D
1. Project Management Life Cycle is all about describing the high-level of processes
involved in successful delivery of greenhouse construction project. By the help of
this, two important aspects that is wasted money and resources.
2. There are mainly four phases of project management like initiation, planning,
execution and lastly closure phase of this greenhouse construction project (Fleming &
Koppelman, 2016).
3. Project KPIs are defined as measurable indicators which are needed for keeping track
of project. It is needed for completing the project on the given time. Project manager
needs to monitor the overall performance of this project. It is mainly needed to
complete the given project performance on the needs of this greenhouse constructing
organization.
4. There is certain number of tools which is needed for understanding the progress of the
project. Milestone tends to play a key role in understanding the vital phases of the
project.
5. Change management is all about understanding the changes in the present system
(Heagney, 2016). In the current change management techniques needs to be properly
identified and planned as per the need of this project.
Activity 3A
1. There are benefits of effective time management in this Greenhouse construction
project. In the domain of project management, is all about having proper kind of
understanding. It can result in large number of distraction and getting overwhelmed.
Document Page
9PROJECT MANAGEMENT
2. It mainly tends to focus on the sum benefits of this time management (Turner, 2016).
It focuses on new kind of cook which comes up with new kind of strategy for
understanding the present trends.
3. Time management can bring huge number of benefits for this project which is needed
for grouping this project. Time management is an important skill for understanding
the fact the system might be different. In the domain of project management, schedule
performance index can play a key role in correcting various kind of issues.
4. Schedule Performance Index is considered to be a fundamental aspect of getting
earned value management. It highlights how much the project is ahead from the point
of analysis.
Activity 3B
1. Time management can be defined as an important skill which is needed by project
managers (Binder, 2016). If there is absence of skill then, it might result in poor or
even missed targets and lastly ineffective use of resources.
Prepared Project Plan: Project plans tend to play a key role in the project milestone
which tends to work like a time target.
Poor Estimation of Schedule: Time estimation requires to be sound as estimation is
considered important aspect of project manager.
Advantage of time-saving: Leading time can easily result in earlier flow of benefits for
completing this project. An individual need to make use of float to schedule non-critical based
activities.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
10PROJECT MANAGEMENT
Identifying the critical path: Critical path of this project can be easily changed for
understanding the changes in the project.
Wasting time in Project meeting: The meeting of this greenhouse construction project
generally come up with agenda. It mainly tends to highlight various kind of issues like problem
solving and risk identification in project.
Document Page
11PROJECT MANAGEMENT
References
Binder, J. (2016). Global project management: communication, collaboration and management
across borders. Routledge.
Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management.
Project Management Institute.
Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management.
Project Management Institute.
Heagney, J. (2016). Fundamentals of project management. Amacom.
Heldman, K. (2018). PMP: project management professional exam study guide. John Wiley &
Sons.
Kerzner, H. (2017). Project management metrics, KPIs, and dashboards: a guide to measuring
and monitoring project performance. John Wiley & Sons.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Lock, D. (2017). The essentials of project management. Routledge.
Schwalbe, K. (2015). Information technology project management. Cengage Learning.
Turner, R. (2016). Gower handbook of project management. Routledge.
Verzuh, E. (2015). The fast forward MBA in project management. John Wiley & Sons.
chevron_up_icon
1 out of 12
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]