Running head: ESTABLISHING WORK OFFICE FOR A NEW BRANCH Establishing work office for a new branch Name of the student: Student ID:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1ESTABLISHING WORK OFFICE FOR A NEW BRANCH 1. Problem Statement The main reason for the installation of the successive management of the activities and the alignment would be implied for easing the integration and forming the usefulness of the management[4]. The management would be implied for easing the development and integrating the alignment and development. The main problem would be achieved with the involvement of the management for easing the information transfer development. The network installation is a major setback for forming the issues in utilization of the effective information transfer for easing the management formation development[1]. The easing of the network development operations can be helpful for ensuring the management of the factors and listing the employment of the activities for integrating the development of aligning management. The major problems for the project would involve the alignment of the network configuration and listing the management of the successive integration development [3]. The network configuration is a major problem for the organization as it requires the possible formation of the activities for defining the integration and development. The configuration of the networks would be cohesive for the formation and defining of the network development.
2ESTABLISHING WORK OFFICE FOR A NEW BRANCH 2. WBS Environ Network Installation Phase 1: Planning Assess Requirements Validate Requirements Identify Reusable Equipments Identify necessary software Execute software Assess market suppliers and standards plan installation process Phase2: Procurement Draft and Validate Requests for Proposal Select vendors Receive Equipments Ensure receipt of all equipments Phase 3: Assembly Assemble equipment Organize assembled equipment into chronological order of installation Label all equipments Phase 4: Installation Execute first round of installations Execute second round of installations Ensure no steps were missed and all connections are tight Conduct Preliminary automated testing Phase 5: Testing Write testing requirements and scripts Test all network connections Test Speed Prepare Final Delievery documentation Figure 1: WBS for the Project (Source: Created by the author)
3ESTABLISHING WORK OFFICE FOR A NEW BRANCH 3. Gantt chart IDTask Mode WBSTask NameDurationStartFinish 11Environ Network Installation9 daysMon 10/1/18Thu 10/11/18 21.1Phase 1: Planning3 daysMon 10/1/18Wed 10/3/18 31.1.1Assess Requirements1 dayMon 10/1/18Mon 10/1/18 41.1.2Validate Requirements1 dayTue 10/2/18Tue 10/2/18 51.1.3Identify Reusable Equipments1 dayTue 10/2/18Tue 10/2/18 61.1.4Identify necessary software1 dayWed 10/3/18Wed 10/3/18 71.1.5Execute software1 dayWed 10/3/18Wed 10/3/18 81.1.6Assess market suppliers and standards1 dayWed 10/3/18Wed 10/3/18 91.1.7plan installation process1 dayWed 10/3/18Wed 10/3/18 101.2Phase2: Procurement3.25 daysThu 10/4/18Tue 10/9/18 111.2.1Draft and Validate Requests for Proposal1 dayThu 10/4/18Thu 10/4/18 121.2.2Select vendors1 dayFri 10/5/18Fri 10/5/18 131.2.3Receive Equipments2 daysFri 10/5/18Mon 10/8/18 141.2.4Ensure receipt of all equipments0.25 daysTue 10/9/18Tue 10/9/18 151.3Phase 3: Assembly0.75 daysTue 10/9/18Tue 10/9/18 161.3.1Assemble equipment0.25 daysTue 10/9/18Tue 10/9/18 171.3.2Organize assembled equipment into chronological order of installation 0.25 daysTue 10/9/18Tue 10/9/18 181.3.3Label all equipments0.25 daysTue 10/9/18Tue 10/9/18 191.4Phase 4: Installation1 dayWed 10/10/18Wed 10/10/18 201.4.1Execute first round of installations0.25 daysWed 10/10/18Wed 10/10/18 211.4.2Execute second round of installations0.25 daysWed 10/10/18Wed 10/10/18 221.4.3Ensure no steps were missed and all connections are tight 0.25 daysWed 10/10/18 Wed 10/10/18 231.4.4Conduct Preliminary automated testing0.25 daysWed 10/10/18Wed 10/10/18 241.5Phase 5: Testing1 dayThu 10/11/18Thu 10/11/18 251.5.1Write testing requirements and scripts0.5 daysThu 10/11/18Thu 10/11/18 261.5.2Test all network connections0.25 daysThu 10/11/18Thu 10/11/18 271.5.3Test Speed0.25 daysThu 10/11/18Thu 10/11/18 281.5.4Prepare Final Delievery documentation0.25 daysThu 10/11/18Thu 10/11/18 SMTWTFSSMTWTFS Sep 30, '18Oct 7, '18 Figure 2: Gantt chart for the Project (Source: Created by the author)
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4ESTABLISHING WORK OFFICE FOR A NEW BRANCH Bibliography [1]D. Hunziker, M. Gajamohan, M. Waibel and R. D'Andrea, “Rapyuta: The roboearth cloud engine,”Robotics and Automation (ICRA), IEEE,pp. 438-444, 2013. [2]H. Osman and M. Chaudron, “Correctness and Completeness of CASE Tools in Reverse EngineeringSource Code into UML Model,”GSTF Journal on Computing (JoC),vol. 2, no. 1, 2014. [3]H. Saarijarvi, L. Mitronen and M. Yrjola , “From selling to supporting-Leveraging mobile services in the context of food retailing,”Journal of retailing and consumer services,vol. 21(1), pp. 26-36, 2014. [4]B. A. Schmit and S. Dustdar, “Model-driven development of web service transactions,” Enterprise Modelling and Information Systems Architectures,vol. 1, no. 1, pp. 46-55, 2015.