Running head: WORKPLACE PROJECT STATUS REPORT Assessment Task 2: Workplace Project Status Report Refurbishment of Residential Complex by UYI Constructions Name of the Student: Student ID: Name of the University: Author’s note:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1WORKPLACE PROJECT STATUS REPORT Table of Contents Introduction......................................................................................................................................2 Project name and description...........................................................................................................2 Name of the organization.................................................................................................................2 Date of Status report........................................................................................................................3 Project Progress and Performance...................................................................................................3 Issues of the Project.........................................................................................................................5 Budget Status...................................................................................................................................6 Planned Activities and Deliverables................................................................................................8 Workflow Diagram and Gantt chart................................................................................................9 Review of the risks........................................................................................................................10 Project and Personal Reflections...................................................................................................11 Conclusion.....................................................................................................................................11 Bibliography..................................................................................................................................12
2WORKPLACE PROJECT STATUS REPORT Introduction The project management includes the tool of project status report that helps in defining the progress of the project using appropriate documentation and processes. The project of Refurbishment of Residential Complex by UYI Constructions has been considered for analysis and it would involve the formation of the proper and effective documentation for evaluation of the project status. The following report would include project name and description, name of the organization, date of status report, project progress and performance, issues of the project, budget status, planned activities and deliverables, network diagram and Gantt chart, review of the risks, and project and personal reflections for the selected project. Project name and description The project selected for the development of the project status report is ‘Refurbishment of Residential Complex by UYI Constructions’ and it involves the renovation of the residential complex by the organization of UYI Constructions. The completion of the works by the utilization of the project management tools for forming the plan for renovation works. The renovation works would include the fixing of the floors, lights, and paints of the residential complex. The completion of the works would involve the formation of the innovative work alignment and integration of the successive work development. The renovation of the building has been initiated as the building has been facing several issues like damps and dents due to rain and water, broken floors, and old cables and wires of electricity. The completion of the project works would be integrated with the formation of the project management integration. Name of the organization
3WORKPLACE PROJECT STATUS REPORT UYI Constructions is a construction company that has been using effective innovation and works for the organization and implying the use of the innovative and effective work compilationandmanagement.Theconstructioncompanywouldintegratetheuseofthe construction principles and the listing of the works aligning the completion of the successful work management. The utilization of the works for the management of the successive integration analysis would be formed with the continuation of the innovative and effective work alignment. For ‘Refurbishment of Residential Complex by UYI Constructions’ project, the organization has deployed the individual work formation listing so that the implied renovation works can be implemented successfully. Date of Status report The ‘Refurbishment of Residential Complex by UYI Constructions’ project status report has been made as on 31stMarch, 2019 and the analysis would be done considering the progress of the project till that time. The project status baseline schedule has been developed using the MS-Project software. The date has been set as on 3/31/19 and the project activities that would be completed before that date would be set as 100% completed. The range of 0-100% completion would be selected in the update project option of MS-Project. The project has been updated and the final outcome has shown that the project has been 59% completed. The activities of the requirement analysis, contractor recruitment, PID documentation, charter planning, project initiation meeting, sign off, activity listing, resource identification, scheduling activities, plan approval, clearing of the complex, repairing the floor, fixing electricity, and damps and breaks are repaired have been completed by 31stMarch, 2019. Project Progress and Performance
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4WORKPLACE PROJECT STATUS REPORT The following is the project progress list as on date of the 3/31/19 for the project of ‘Refurbishment of Residential Complex by UYI Constructions’, WBSTask NameDurationStartFinish% Work Complete 0Refurbishment of Residential Complex by UYI constructions100 daysMon 1/7/19Fri 5/24/1959% 1Project Initiation13 daysMon 1/7/19Wed 1/23/19100% 1.1Requirement Analysis4 daysMon 1/7/19Thu 1/10/19100% 1.2Contractor Recruitment2 daysFri 1/11/19Mon 1/14/19100% 1.3PID documentation3 daysTue 1/15/19Thu 1/17/19100% 1.4Charter Planning3 daysFri 1/18/19Tue 1/22/19100% 1.5Project Initiation Meeting1 dayWed 1/23/19Wed 1/23/19100% 1.6Sign off0 daysWed 1/23/19Wed 1/23/19100% 2Project Planning10 daysThu 1/24/19Wed 2/6/19100% 2.1Activity Listing3 daysThu 1/24/19Mon 1/28/19100% 2.2Resource Identification2 daysTue 1/29/19Wed 1/30/19100% 2.3Scheduling activities5 daysThu 1/31/19Wed 2/6/19100% 2.4Plan Approval0 daysWed 2/6/19Wed 2/6/19100% 3Project Execution58 daysThu 2/7/19Mon 4/29/1960% 3.1Clearing of the complex7 daysThu 2/7/19Fri 2/15/19100% 3.2Repairing the floor10 daysMon 2/18/19Fri 3/1/19100% 3.3Fixing Electricity6 daysMon 3/4/19Mon 3/11/19100% 3.4Damps and Breaks are repaired12 daysTue 3/12/19Wed 3/27/19100% 3.5Wall Paintings6 daysThu 3/28/19Thu 4/4/1933% 3.6Infrastructure re-modification8 daysFri 4/5/19Tue 4/16/190% 3.7Fans, Lights, and switches are installed5 daysWed 4/17/19Tue 4/23/190% 3.8Safety equipment are reinstalled4 daysWed 4/24/19Mon 4/29/190% 3.9Renovation work completed0 daysMon 4/29/19Mon 4/29/190% 4Project Closure19 daysTue 4/30/19Fri 5/24/190% 4.1Final Documentation3 daysTue 4/30/19Thu 5/2/190% 4.2Monitoring and Evaluation15 daysFri 5/3/19Thu 5/23/190% 4.3Review and Sign off1 dayFri 5/24/19Fri 5/24/190% 4.4Closure0 daysFri 5/24/19Fri 5/24/190%
5WORKPLACE PROJECT STATUS REPORT According to the above project progress table, it is clear that almost 60% of the work has been completed. The project performance can be understood as the project completed till date. The activities of the requirement analysis, contractor recruitment, PID documentation, charter planning, project initiation meeting, sign off, activity listing, resource identification, scheduling activities, plan approval, clearing of the complex, repairing the floor, fixing electricity, and damps and breaks are repaired have been completed by 3/31/19. The wall paintings have been completed by 33% of the total works. Rest of the work like infrastructure re-modification, fans, lights, and switches are installed, safety equipment are reinstalled, renovation work completed, final documentation, monitoring and evaluation, review and sign off, and closure have not even started yet. If phase wise project performance is evaluated, then the following table is seen, WBSTask Name% Work Complete 1Project Initiation100% 2Project Planning100% 3Project Execution60% 4Project Closure0% It is clear from the above table that theproject initiationand project planning phases of project have been completed. The project work alignment has been implied with the formation of the innovative work integration and management. The analysis has shown that the alignment of the improved work has helped in meeting the target work completion by 31stmarch. The project execution phase has been completed by 60% and the project closure has not started yet. Issues of the Project
6WORKPLACE PROJECT STATUS REPORT The issue identification is a major factor for the development of the effective work plan and development of the operations. The project of ‘Refurbishment of Residential Complex by UYI Constructions’ has been facing some issues while developing the refurbishment of the residential complex. The probable issues of the project were, Equipmentfailure:Theequipmentfailureisatechnicalfactorresultinginthe management of the effective and improved work formation. The renovation works would be developed with the continuation of the successful alignment of the innovative tools listing. The failure of the equipment would result in forming the issues in completion of the renovation works. Human Accidents: The accidents during the construction works would tend to result in formation of the innovative work development and integration. The accidentsduring the construction phase would tend to the delay in the formation of the effective work alignment. The accidents by the human would tend to hindrance in the completion of the project works. Climatic Hindrance: The changes in the climatic conditions have resulted in forming the major issues for the management of the improved renovation works. The hindrance in favorable climate can result in the forming the issues for work of the construction. The issues would tend to form the major implementation issues of the machine utilization and other works. Cost Overrun: The problem of the cost overrun is a major problem for the deployment of the effective and smart work alignment management for the implication management. The cost overrun would resulted in the formation of the innovative work alignment. The lack of the cost resources has been resulted due to the lack of resources or over allocation of the resources. Budget Status
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7WORKPLACE PROJECT STATUS REPORT Thebudgetfortheprojectof‘RefurbishmentofResidentialComplexbyUYI Constructions’ has been developed using the bottom up estimation. The bottom up estimation considers the overall cost of the project resources by multiplying the resource usage with the standard rates of the resources. The summation of the individual cost expenses of the resources would provide the final cost of the project. The project status date of 3/31/19 would be considered for the analysis of the budget status as shown below, Project InitiationProject PlanningProject ExecutionProject Closure 0 10000 20000 30000 40000 50000 60000 70000 80000 Project Initiation; 7960Project Planning; 5760 Project Execution; 72260 Project Closure; 14020 Actual CostRemaining CostBaseline Cost
8WORKPLACE PROJECT STATUS REPORT Analyst Project Manager Documenter Client Planner Contractor Workers Electrician Painter Engineer 0 2000 4000 6000 8000 10000 12000 14000 16000 18000 20000 1920 40003360 0 41604760 18560 4320 1200 0 08001680 00 54405120 3600 2400 14440 Actual CostRemaining Cost Planned Activities and Deliverables The planned activities for the project of ‘Refurbishment of Residential Complex by UYI Constructions’ is given below, WBSTask NameDuration 1Project Initiation13 days 1.1Requirement Analysis4 days 1.2Contractor Recruitment2 days 1.3PID documentation3 days 1.4Charter Planning3 days 1.5Project Initiation Meeting1 day 1.6Sign off0 days 2Project Planning10 days 2.1Activity Listing3 days 2.2Resource Identification2 days 2.3Scheduling activities5 days 2.4Plan Approval0 days 3Project Execution58 days
9WORKPLACE PROJECT STATUS REPORT 3.1Clearing of the complex7 days 3.2Repairing the floor10 days 3.3Fixing Electricity6 days 3.4Damps and Breaks are repaired12 days 3.5Wall Paintings6 days 3.6Infrastructure re-modification8 days 3.7Fans, Lights, and switches are installed5 days 3.8Safety equipment are reinstalled4 days 3.9Renovation work completed0 days 4Project Closure19 days 4.1Final Documentation3 days 4.2Monitoring and Evaluation15 days 4.3Review and Sign off1 day 4.4Closure0 days Workflow Diagram and Gantt chart The work flow diagram for the project of ‘Refurbishment of Residential Complex by UYI Constructions’ is given below, The Gantt chart for the project of ‘Refurbishment of Residential Complex by UYI Constructions’ is given below,
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
10WORKPLACE PROJECT STATUS REPORT IDTask Mode WBSTask NameDurationStartFinish 00Refurbishment of Residential Complex by UYI constructions 100 daysMon 1/7/19Fri 5/24/19 11Project Initiation13 daysMon 1/7/19Wed 1/23/19 21.1Requirement Analysis4 daysMon 1/7/19Thu 1/10/19 31.2Contractor Recruitment2 daysFri 1/11/19Mon 1/14/19 41.3PID documentation3 daysTue 1/15/19Thu 1/17/19 51.4Charter Planning3 daysFri 1/18/19Tue 1/22/19 61.5Project Initiation Meeting1 dayWed 1/23/19Wed 1/23/19 71.6Sign off0 daysWed 1/23/19Wed 1/23/19 82Project Planning10 daysThu 1/24/19Wed 2/6/19 92.1Activity Listing3 daysThu 1/24/19Mon 1/28/19 102.2Resource Identification2 daysTue 1/29/19Wed 1/30/19 112.3Scheduling activities5 daysThu 1/31/19Wed 2/6/19 122.4Plan Approval0 daysWed 2/6/19Wed 2/6/19 133Project Execution58 daysThu 2/7/19Mon 4/29/19 143.1Clearing of the complex7 daysThu 2/7/19Fri 2/15/19 153.2Repairing the floor10 daysMon 2/18/19Fri 3/1/19 163.3Fixing Electricity6 daysMon 3/4/19Mon 3/11/19 173.4Damps and Breaks are repaired 12 daysTue 3/12/19Wed 3/27/19 183.5Wall Paintings6 daysThu 3/28/19Thu 4/4/19 193.6Infrastructure re-modification8 daysFri 4/5/19Tue 4/16/19 203.7Fans, Lights, and switches are installed 5 daysWed 4/17/19Tue 4/23/19 213.8Safety equipment are reinstalled 4 daysWed 4/24/19Mon 4/29/19 223.9Renovation work completed0 daysMon 4/29/19Mon 4/29/19 234Project Closure19 daysTue 4/30/19Fri 5/24/19 244.1Final Documentation3 daysTue 4/30/19Thu 5/2/19 254.2Monitoring and Evaluation15 daysFri 5/3/19Thu 5/23/19 264.3Review and Sign off1 dayFri 5/24/19Fri 5/24/19 274.4Closure0 daysFri 5/24/19Fri 5/24/19 Analyst Project Manager Documenter,Documents[1] Documenter,Documents[1] Project Manager,Client 1/23 Planner Project Manager Planner 2/6 Contractor,Workers,Cleaning Tools[1] Workers,Flooring material[1] Electrician Workers Painter,Paints[1] Contractor,Workers,Construction Materials[1] Electrician,Fans Lights & Switches[1] Engineer,Fire Extinguisher & First Aid Kit[1] 4/29 Documenter,Documents[1] Engineer Project Manager 5/24 STMFTSWSTMFTSWSTMF Dec 16, '18Jan 13, '19Feb 10, '19Mar 10, '19Apr 7, '19May 5, '19Jun 2, '19Jun 30, '19 Review of the risks The risk analysis would be done for probability, severity, and impact calculation for the different risks of the ‘Refurbishment of Residential Complex by UYI Constructions’ project, RiskTypeProbability (1-5)Severity(1- 5) Impact (P*S) Cost OverrunFinancial4312 Climatic HindranceNature428 Equipment failureTechnical2510 Human AccidentsHuman3412
11WORKPLACE PROJECT STATUS REPORT Project and Personal Reflections Our project was ‘Refurbishment of Residential Complex by UYI Constructions’ and it utilized the management of the activities defining the formation of the successive implication of the works. We involved the use of the effective schedule development using MS-Project, risk managementusingriskassessmentandprioritymatrix,costestimationusingbottomup estimation, and project status report. The project status report has resulted in forming the utilization of the project progress identification and listing probable implication management. I had implied the usage of the successful work development with the implication of the project management tools and techniques. Conclusion It can be concluded from the assignment that the implication of the effective work alignment and development would be eased with the utilization of the innovative work alignment and development. The project status reports had involved the formation of the successive documentation using the effective work function alignment. The development of the proper and effective project management with the help of innovative work alignment was assisted by the formation of the work status report. The integration had implied with the successive work and development management. The project of ‘Refurbishment of Residential Complex by UYI Constructions’ had compiled with the formation of the effective risk development and formation.
12WORKPLACE PROJECT STATUS REPORT Bibliography Aarikka-Stenroos, L., Aaboen, L., Cova, B. & Rolfsen, A., (2018). Building B2B relationships via initiation contributors: Three cases from the Norwegian-South Korean international project business.Industrial Marketing Management,68, pp.74-85. Burtonshaw-Gunn, S.A., (2017).Risk and financial management in construction. Routledge. Chance, D.M. & Brooks, R., (2015).Introduction to derivatives and risk management. Cengage Learning. Demirkesen, S. & Ozorhon, B., (2017). Impact of integration management on construction project management performance.International Journal of Project Management,35(8), pp.1639-1654. Fleming, Q.W. & Koppelman, J.M., (2016), December. Earned value project management. Project Management Institute. Glendon, A.I., Clarke, S. & McKenna, E., (2016).Human safety and risk management. Crc Press. Harrison, F. & Lock, D., (2017).Advanced project management: a structured approach. Routledge. Hopkin, P., (2017).Fundamentals of risk management: understanding, evaluating and implementing effective risk management. Kogan Page Publishers. Kerzner, H. & Kerzner, H.R., (2017).Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. Kuchta, D. & Ptaszyńska, E., (2017), July. Fuzzy based risk register for construction project risk assessment. InAIP Conference Proceedings(Vol. 1863, No. 1, p. 230006). AIP Publishing.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
13WORKPLACE PROJECT STATUS REPORT McNeil, A.J., Frey, R. & Embrechts, P., (2015).Quantitative risk management: Concepts, techniques and tools. Princeton university press. Mullaly, M., (2016).Exercising Agency: Decision Making and Project Initiation. Routledge. Sears, S.K., Sears, G.A., Clough, R.H., Rounds, J.L. & Segner, R.O., (2015).Construction project management. John Wiley & Sons. Shen, Y., Tuuli, M.M., Xia, B., Koh, T.Y. & Rowlinson, S., (2015). Toward a model for forming psychological safety climate in construction project management.International journal of project management,33(1), pp.223-235. Walker, A., (2015).Project management in construction. John Wiley & Sons. Zheng, X., Le, Y., Chan, A.P., Hu, Y. & Li, Y., (2016). Review of the application of social network analysis (SNA) in construction project management research.International journal of project management,34(7), pp.1214-1225.