Detailed Project Charter: Al Maktoum International Airport Expansion

Verified

Added on  2021/11/11

|32
|4919
|180
Project
AI Summary
This document presents a detailed project charter for the initial phase of the Al Maktoum International Airport expansion in Dubai, UAE. The project, managed by Dubai Aviation Engineering Projects (DAEP), aims to construct a new international airport with two parallel runways and modern facilities, targeting an annual capacity of 65 million passengers. The charter outlines the project's objectives, vision, scope, and deliverables, including a complete airport system, ultramodern terminal, and aircraft hangars. It identifies key stakeholders, their roles and responsibilities, and the project's organizational structure. The implementation plan covers the project approach, schedule with milestones, resource and financial plans, quality plan, and completion criteria. Key project considerations such as risks, assumptions, and constraints are also addressed, providing a comprehensive overview of the airport expansion project.
Document Page
Running Head: PROJECT MANAGEMENT
Project Charter: Al Maktoum International Airport Expansion
Project
Name of the Student
Name of the University
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1PROJECT MANAGEMENT
Table of Contents
Introduction........................................................................................................................2
1. Executive Summary.......................................................................................................2
2. Project Definition............................................................................................................2
2.1 Objectives................................................................................................................2
2.2 Vision........................................................................................................................3
2.3 Scope.......................................................................................................................3
2.4 Deliverables.............................................................................................................3
3. Project Organization......................................................................................................4
3.1 Customer..................................................................................................................4
3.2 Stakeholders............................................................................................................4
3.3 Roles........................................................................................................................4
3.4 Responsibilities........................................................................................................4
3.5 Structure...................................................................................................................5
4. Implementation Plan......................................................................................................6
4.1 Approach..................................................................................................................6
4.2 Schedule..................................................................................................................6
4.3 Milestones..............................................................................................................16
4.4 Dependencies........................................................................................................16
4.5 Resource Plan........................................................................................................16
4.6 Financial Plan.........................................................................................................18
4.7 Quality Plan............................................................................................................28
4.8 Completion Criteria................................................................................................28
5. Project Consideration..................................................................................................28
5.1 Risks.......................................................................................................................28
5.2 Assumptions...........................................................................................................29
5.3 Constraints.............................................................................................................30
Approvals.........................................................................................................................30
Revision History...............................................................................................................30
Bibliography.....................................................................................................................32
Document Page
2PROJECT MANAGEMENT
Document Page
3PROJECT MANAGEMENT
Introduction
The Dubai Aviation Engineering Projects (DAEP) is a Dubai based entity that has
been given the responsibility to proceed with the construction of the Al Maktoum
International Airport in a number of different phases. The first phase will involve
construction of the airport terminal and two parallel runways. The airport will be able to
handle 65 million passengers per year after the first phase is complete. The government
has allotted a budget of $32bn for the project.
This report is based on a detailed project plan for the initial phase of the Al
Maktoum International Airport.
1. Executive Summary
The proposed airport is supposed to be constructed and then expanded in a
number of phases. The initial plan involves the construction of two parallel runways that
will be able to hold large aircrafts like Airbus and also will be able to support the arrival
and departure of more than 100 flights per day. This particular project will allow UAE
government to operate more international flights and allow the economic growth of the
country.
2. Project Definition
2.1 Objectives
The objectives of the project are listed as follows.
To build a new international airport in Dubai, UAE.
To install ultramodern facilities in the airport
To provide services to around 65 million passengers annually
To provide the passengers with various international flights from a single
airport
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4PROJECT MANAGEMENT
2.2 Vision
The main vision behind the project is to provide ultramodern airport facilities to
the passengers and also provide non-stop international flights at a continuous basis.
Moreover, currently, there is only a single airport in Dubai i.e. the Dubai International
Airport and with the increasing number of international flights, the pressure on the
airport has increased significantly. Hence, the new airport will reduce the load on the
Dubai International Airport and will also allow the airlines companies to add more
international non-stop flights to the existing roster. Furthermore, with a capacity of 65
million passengers annually, the new airport will also aid in the economic growth of the
country.
2.3 Scope
The scope of the project mainly includes the construction of Al Maktoum
International Airport at Dubai South, Dubai. The first expansion phase will include the
construction of two parallel runways each 4.5 km long and two satellite concourses of
385,000 square meters. The initial target of the airport is to have sufficient capacity for
65 million passengers annually. In addition, the scope of the project also includes 200
wide body aircraft stands with 100 each for code E and code F aircrafts. Furthermore,
the scope also includes the construction of 6 new train tracks connecting the terminals
and the concourses.
2.4 Deliverables
The main deliverables of the project are as follows.
A complete airport system
An ultramodern airport terminal with modern facilities for passengers
Two parallel runways each 4.5 Km long
Modern aircraft hangars
Document Page
5PROJECT MANAGEMENT
3. Project Organization
3.1 Customer
The customer of the project is the General Civil Aviation Authority, UAE who will
operate around 100 international flights (arrival and departure) every day.
3.2 Stakeholders
The major stakeholders of the project include the following.
Project Manager
Chief Financial Officer
Project Supervisor and Coordinator
Resource Management Officer
Contractor for Technical Works
Contractor for Non Technical Works
Project Requirements Analyst
Risk Manager
Project Plan Developer and Reporter
3.3 Roles
The stakeholders will play major roles in the project. Each of the stakeholders will
have a specific list of duties that he must perform throughout the course of the project.
The detailed responsibilities of the stakeholders are further discussed below.
3.4 Responsibilities
The stakeholder responsibilities are explained below.
Stakeholder Responsibility
Project Manager Manage and control the entire project
Chief Financial Officer Manage the funds procurement and
allocation in the project
Project Supervisor and Coordinator Supervise project progress and coordinate
Document Page
6PROJECT MANAGEMENT
with both the project team and the authority
Resource Management Officer Manage and procure resources for project
Contractor for Technical Works Execute technical works through his team
of workers
Contractor for Non Technical Works Execute non-technical works through his
team of workers
Project Requirements Analyst Analyze project requirements and report to
the project manager
Risk Manager Analyze and take steps to mitigate project
risks
Project Plan Developer and Reporter Develop project plan and report project
progress to authority
3.5 Structure
The structure is shown as follows.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7PROJECT MANAGEMENT
Authority
Project Manager Chief Financial Officer
Non Technical Contractor Risk ManagerTechnical Contractor
Supervisor Requirements Analyst + Reporter Resource Officer
4. Implementation Plan
4.1 Approach
The approach of the project will involve standard project management procedure
including initiation, planning, preparation, execution and closing. The details of the
project approach is shown in the schedule in the following section.
4.2 Schedule
The schedule for the project is developed as follows.
WBS Task Name Duration Start Finish Predecessors
0
Implementation Plan for
Al Maktoum
International Airport
Expansion Project
2430 days Mon 01-
04-19
Fri 21-07-
28
Document Page
8PROJECT MANAGEMENT
1 Project Discussions
and Survey 230 days Mon 01-
04-19
Fri 14-02-
20
1.1
Discuss with the
Airport Authority
Regarding the Overall
Project Requirements
30 days Mon 01-
04-19
Fri 10-05-
19
1.2
Complete an Overall
Survey of the Proposed
Airport
30 days Mon 13-
05-19
Fri 21-06-
19 2
1.3
Make Detailed
Discussions Regarding
the Overall Nature and
Scale of the Airport
15 days Mon 24-
06-19
Fri 12-07-
19 3
1.4
Determine All
Technical and Non
Technical Requirements
of the Project
20 days Mon 15-
07-19
Fri 09-08-
19 4
1.5 Feasibility testing of
the project 30 days Mon 12-
08-19
Fri 20-09-
19 5
1.6
Propose an initial
budget for risk testing and
analysis
10 days Mon 23-
09-19
Fri 04-10-
19 6
1.7
Determine risks with
the project and develop
risk management plan
25 days Mon 07-
10-19
Fri 08-11-
19 7
1.8 Submit the Risk 5 days Mon 11- Fri 15-11- 8
Document Page
9PROJECT MANAGEMENT
Management Proposal to
the Authority for Analysis
and Budget Approval
11-19 19
1.9
Receive Budget and
Approval to Proceed with
Risk Management
10 days Mon 18-
11-19
Fri 29-11-
19 9
1.10
Contact with HR for
resource requirements for
risk management
10 days Mon 02-
12-19
Fri 13-12-
19 10
1.11
Show a detailed plan
for risk management to
respective stakeholders
10 days Mon 16-
12-19
Fri 27-12-
19 11
1.12 Create team for risk
management 5 days Mon 30-
12-19
Fri 03-01-
20 12
1.13
Prepare a Risk
Management Final
Proposal
5 days Mon 06-
01-20
Fri 10-01-
20 13
1.14 Conduct Risk
Management Process 25 days Mon 13-
01-20
Fri 14-02-
20 14
2 Final Project
Preparation Phase 225 days Mon 17-
02-20
Fri 25-12-
20
2.1
Conduct a Team
Meeting with all the
Project Team Members
15 days Mon 17-
02-20
Fri 06-03-
20 15
2.2 Discuss Project 10 days Mon 09- Fri 20-03- 17
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10PROJECT MANAGEMENT
Roadmap 03-20 20
2.3
Analyze requirements
and expertise necessary
to execute all the duties
associated with the project
20 days Mon 23-
03-20
Fri 17-04-
20 18
2.4
Prepare an Estimated
List of Material and
Human Resources for
Final Project Execution
Process
25 days Mon 20-
04-20
Fri 22-05-
20 19
2.5
Appoint Specific
Personnel to Various
Parts of Project based on
their Expertise
15 days Mon 25-
05-20
Fri 12-06-
20 20
2.6
Allocate Separate
Roles to Specific Teams
involved in the Project
15 days Mon 15-
06-20
Fri 03-07-
20 21
2.7
Specify Work
Requirements for the
Project
20 days Mon 06-
07-20
Fri 31-07-
20 22
2.8
Hire Project
Management and
Supervision Team
10 days Mon 03-
08-20
Fri 14-08-
20
2.8.1 Hire Team Leader 5 days Mon 03-
08-20
Fri 07-08-
20 23
2.8.2 Hire Other 10 days Mon 03- Fri 14-08- 23
Document Page
11PROJECT MANAGEMENT
Personnel who have
expertise in project
supervision and reporting
08-20 20
2.8.3 Finalize the Analysis
Team 5 days Mon 03-
08-20
Fri 07-08-
20 23
2.9 Hire Legal Assistant 10 days Mon 17-
08-20
Fri 28-08-
20 27,25,26
2.10 Hire Technical
Personnel 30 days Mon 17-
08-20
Fri 25-09-
20 25,26,27
2.11
Prepare a Human
Resource Management
Plan
15 days Mon 28-
09-20
Fri 16-10-
20 28,29
2.12 Align the Plan with the
Project Requirements 15 days Mon 19-
10-20
Fri 06-11-
20 30
2.13 List Down Project
Requirements 15 days Mon 09-
11-20
Fri 27-11-
20 31
2.14
Allocate Roles to All
Human Resources
including the Different
Teams
20 days Mon 30-
11-20
Fri 25-12-
20 32
3 Resource
Procurement for Project 125 days Mon 28-
12-20
Fri 18-06-
21
3.1 Prepare a List of All
Materials Required for
Airport Construction and
15 days Mon 28-
12-20
Fri 15-01-
21
33