University Network Design: AnyCompany Corporation Case Study Report

Verified

Added on  2020/05/11

|21
|3415
|336
Report
AI Summary
This report presents a comprehensive network design for AnyCompany Corporation, addressing the need to replace an outdated network infrastructure. It begins with an executive summary outlining the report's content, which includes a project proposal detailing needs, objectives, and goals. The methodology employed is the waterfall model, with a detailed timetable spanning 79 days. The technical solutions section provides component recommendations for various job roles within the company, including the Administrative Manager, Film and Graphics Production Editor, and Film Crew. The report outlines the proposed network layout, compares different ISPs, and provides a network planning form. It also incorporates a network floor plan and an address allocation table. The report also describes the network's implementation, including wired and wireless connections, and details the security measures in place. Finally, the report concludes with a budget summary and future plans for the network's expansion and concludes with the bibliography.
Document Page
Network Design: AnyCompany Corporation
Name of the Student:
Name of the University:
Author Note
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
NETWORK DESIGN: ANYCOMPANY CORPORATION
Executive Summary:
This report is related with case study of AnyCompany corporation. The company is looking to
replace their old network with a new one. The report provides the information about the
analysis of the network and the processes to be followed for the implementation of the
network. The report contains the project proposal, the methodology and timetable; technical
solutions and evaluation; budget summary; future plans for the network.
1
Document Page
NETWORK DESIGN: ANYCOMPANY CORPORATION
Tables of Contents
List of Figures and Tables...............................................................................................................3
Introduction...................................................................................................................................4
Project proposal.............................................................................................................................4
Needs Statement....................................................................................................................... 4
Objective and Goals................................................................................................................... 4
Methodology and timetable..........................................................................................................5
Technical solutions and evaluation................................................................................................6
Activity 1:................................................................................................................................... 6
Activity 2:................................................................................................................................. 12
Activity 3:................................................................................................................................. 12
Activity 4:................................................................................................................................. 13
Activity 5:................................................................................................................................. 13
Activity 6:................................................................................................................................. 14
Activity 7:................................................................................................................................. 14
Activity 8:................................................................................................................................. 16
Activity 9:................................................................................................................................. 16
Budget summary..........................................................................................................................17
2
Document Page
NETWORK DESIGN: ANYCOMPANY CORPORATION
Future plans................................................................................................................................. 18
Conclusions.................................................................................................................................. 18
Bibliography and List of References.............................................................................................20
3
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
NETWORK DESIGN: ANYCOMPANY CORPORATION
List of Figures and Tables
Table 1: Project Schedule.............................................................................................................. 6
Table 2: Proposed Computer System for The Administrative Manager.........................................8
Table 3: Proposed Computer System for The Video Editor..........................................................10
Table 4: Proposed Computer System for The Crew.....................................................................11
Figure 1: Proposed Network Layout for the Company.................................................................12
Table 5: Comparison is between different ISP.............................................................................13
Table 6: Network Planning Form................................................................................................. 14
Figure 2: Floor Plan for the company...........................................................................................15
Table 7: Address Allocation table................................................................................................ 16
Table 8: Cost Budget....................................................................................................................18
4
Document Page
NETWORK DESIGN: ANYCOMPANY CORPORATION
Introduction
The report provides information about the network design and he importance of it in
the company. This report is related with case study of AnyCompany corporation. The company
is based on services for their customers. As the customers of the company have increased the
business of the company has to be increased. Hence, this gives rise to the expansion of the
network within the company. For the expansion of the network for the company a brief analysis
is required and base on the analysis the implementation of the new network for the company is
to be done.
The report provides the information about the analysis of the network and the
processes to be followed for the implementation of the network.
The report contains the project proposal, the methodology and timetable; technical
solutions and evaluation; budget summary; future plans for the network.
Project proposal
Needs Statement
AnyCompany Corporation are looking to expand their business and hence the expansion
of the network is very essential for the company to support the increased number of customers
for the company.
Objective and Goals
The main aim of the company is to replace the old network structure of the company
with an improved network structure.
5
Document Page
NETWORK DESIGN: ANYCOMPANY CORPORATION
The main objectives of the project are:
ï‚· To implements an effective network design
ï‚· To perform an efficient analysis of the existing network.
ï‚· To implement efficient security techniques within the network
ï‚· To design a cost efficient network
Methodology and timetable
For the implementation of this network the waterfall model is selected. This model is
very efficient in the systems in which the expenditure id to be kept at a very minimal rate. The
main process in this methodology are project proposal, project implementation, risk
management and project closure. The timetable for the project is provided below. The project
can be completed in a span of 79 days.
Task Name Duration Start Finish Predecessors
AnyCompany Network Design 79 days Mon 10/19/09 Thu 2/4/10
Initiation Phase 3 days Mon 10/19/09 Wed
10/21/09
Client Meeting with the
providers 3 days Mon 10/19/09 Wed
10/21/09
Sending proposals Proposal 3 days Thu 10/22/09 Mon
10/26/09
Defining the Needs
Statement 2 days Thu 10/22/09 Fri 10/23/09 3
Identification of Aims and
Objectives 1 day Mon 10/26/09 Mon
10/26/09 5
Development of technical
solution 66 days Tue 10/27/09 Tue 1/26/10
Activity 1 4 days Tue 10/27/09 Fri 10/30/09 6
Activity 2 12 days Mon 11/2/09 Tue 11/17/09 8
Activity 3 10 days Wed 11/18/09 Tue 12/1/09 9
Activity 4 4 days Wed 12/2/09 Mon 12/7/09 10
Activity 5 6 days Tue 12/8/09 Tue 12/15/09 11
6
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
NETWORK DESIGN: ANYCOMPANY CORPORATION
Activity 6 7 days Wed 12/16/09 Thu 12/24/09 12
Activity 7 9 days Fri 12/25/09 Wed 1/6/10 13
Activity 8 8 days Thu 1/7/10 Mon 1/18/10 14
Activity 9 6 days Tue 1/19/10 Tue 1/26/10 15
Project Closure
Documentation 7 days Wed 1/27/10 Thu 2/4/10 16
Table 1: Project Schedule
Source: (created by author)
Technical solutions and evaluation
Activity 1:
Administrative Manager
Job Role: Administrative Manager
Location:
Component Recommendations
Processor: AMD Athlon 64 x2 dual core
(Manufacturer, Model, Speed)
Intel Core 2 Duo, 2 GHz multi-core processor
Memory: 2 Gb of memory
(Type, Amount)
4 GB of RAM
Hard Drive: 250 Gb hard drive
(Type, Capacity)
1 TB 7200 RPM hard drive
CD-ROM/DVD: CD/DVD read/write drives CD/DVD read/write drives
7
Document Page
NETWORK DESIGN: ANYCOMPANY CORPORATION
(Read, Read/Write, Speed)
USB Ports: 7 USB ports
(Number, Location)
Number of USB 2.0 Ports- 1
Number of USB 3.0 Ports- 2
Number of HDMI Ports- 1
Number of Audio-out Ports- 1
Number of Ethernet Ports- 1
Number of VGA Ports- 1
Video Card: NA
(Manufacturer, Model, Video RAM)
NVIDIA GeForce with at least 256 MB of
internal memory,
Sound Card: NA
(Manufacturer, Model)
Integrated with the mother board
Modem: 10/100Mb switch
(Internal/External, Speed, Standard)
10/100Mb
Network Card(s): NA
(Ethernet: speed, Wireless, Standard)
Integrated with the mother board
Operating System: Windows 7 operating
system
(Manufacturer, Version, Compatibility)
Windows 10 64-bit
Monitor: NA
(Size, Resolution, Refresh Rate)
15.6 Inches, 49 x 35 x 8 cm
Printer: NA
(Manufacturer, Model, Type, Speed)
Yes connected to the Printer
8
Document Page
NETWORK DESIGN: ANYCOMPANY CORPORATION
Speakers: NA
(Manufacturer, Model, Type)
Dual Audio Speakers
Internet Connection: Ethernet
(USB, Ethernet, Wireless)
Ethernet IEEE 801.3
Table 2: Proposed Computer System for The Administrative Manager
Source: (created by author)
Film and Graphics Production Editor
Job Role: Film and Graphics Production Editor
Location:
Component Recommendations
Processor: AMD Athlon 64 x2 dual core
(Manufacturer, Model, Speed)
Intel Core i5, 2.5 GHz
Memory: 2 Gb of memory
(Type, Amount)
8 GB, DDR4
Hard Drive: 250 Gb hard drive
(Type, Capacity)
Serial ATA, 1 TB
CD-ROM/DVD: CD/DVD read/write drives
(Read, Read/Write, Speed)
DVD-RW
USB Ports: 7 USB ports
(Number, Location)
Number of USB 2.0 Ports 1
Number of USB 3.0 Ports 2
Number of HDMI Ports 1
Video Card: NA AMD Radeon R5 M315
9
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
NETWORK DESIGN: ANYCOMPANY CORPORATION
(Manufacturer, Model, Video RAM)
Sound Card: NA
(Manufacturer, Model)
Integrated with motherboard
Modem: 10/100Mb switch
(Internal/External, Speed, Standard)
connection to modem via switch
Network Card(s): NA
(Ethernet: speed, Wireless, Standard)
LAN card
Operating System: Windows 7 operating
system
(Manufacturer, Version, Compatibility)
Windows 10 Home, 64-bit
Monitor: NA
(Size, Resolution, Refresh Rate)
15.6 inches,
Printer: NA
(Manufacturer, Model, Type, Speed)
Not connected
Speakers: NA
(Manufacturer, Model, Type)
Dual Audio Speakers with Headphones
Internet Connection: Ethernet
(USB, Ethernet, Wireless)
IEEE 801.3
Table 3: Proposed Computer System for The Video Editor
Source: (created by author)
Film Crew
Job Role: Film Crew
10
Document Page
NETWORK DESIGN: ANYCOMPANY CORPORATION
Location:
Component Recommendations
Processor: AMD Athlon 64 x2 dual core
(Manufacturer, Model, Speed)
Intel Core 2 Duo, 2 GHz multi-core processor
Memory: 2 Gb of memory
(Type, Amount)
4 GB of RAM
Hard Drive: 250 Gb hard drive
(Type, Capacity)
1 TB 7200 RPM hard drive
CD-ROM/DVD: CD/DVD read/write drives
(Read, Read/Write, Speed)
CD/DVD read/write drives
USB Ports: 7 USB ports
(Number, Location)
Number of USB 2.0 Ports- 1
Number of USB 3.0 Ports- 2
Number of HDMI Ports- 1
Number of Audio-out Ports- 1
Number of Ethernet Ports- 1
Number of VGA Ports- 1
Video Card: NA
(Manufacturer, Model, Video RAM)
NVIDIA GeForce with at least 256 MB of
internal memory,
Sound Card: NA
(Manufacturer, Model)
Integrated with the mother board
Modem: 10/100Mb switch 10/100Mb
11
chevron_up_icon
1 out of 21
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]