Project Management Report: Analyzing ASDA CRM for Business Improvement
VerifiedAdded on 2023/04/10
|11
|3020
|420
Project
AI Summary
This project management report focuses on analyzing the issues within ASDA's CRM system and proposing solutions to improve business performance. The report begins with an introduction outlining the importance of project management and its principles. It then delves into the viability of projects by developing success and failure criteria, followed by an explanation of project management systems and procedures. The report further explores organizational structures, roles, and responsibilities, along with project control, leadership requirements, and human resource planning. Project planning, scheduling, cost control techniques, and performance measurement methods are also discussed. The report concludes by examining project change control procedures and overall project evaluation. The analysis covers various aspects of project management, aiming to provide insights and recommendations for enhancing ASDA's CRM system and overall business outcomes.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.

PROJECT MANAGEMENT
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Table of Contents
INTRODUCTION...........................................................................................................................3
TASK 1............................................................................................................................................3
1.1 Describe background and principles of project management................................................3
1.2 Appraise the viability of projects by developing success/failure criteria..............................4
1.3 Explain the principles behind project management systems and procedures........................4
1.4 Explain the key elements involved in terminating projects and post project appraisals.......5
TASK 2............................................................................................................................................6
2.1 Identify most appropriate organizational structure, role and responsibilities of participants6
2.2 Control and coordinate a project............................................................................................6
2.3 Assess project leadership requirement and qualities.............................................................7
2.4 Plan and specify human resources and requirements for a project........................................7
TASK 3............................................................................................................................................8
3.1 Prepare project plans and establish the project organization ................................................8
3.2 Application of project scheduling, estimating and cost control techniques..........................8
3.3 Methods used to measure project performance.....................................................................9
3.4 Project change control procedures and evaluation of project................................................9
CONCLUSION................................................................................................................................9
REFERENCES..............................................................................................................................10
2
INTRODUCTION...........................................................................................................................3
TASK 1............................................................................................................................................3
1.1 Describe background and principles of project management................................................3
1.2 Appraise the viability of projects by developing success/failure criteria..............................4
1.3 Explain the principles behind project management systems and procedures........................4
1.4 Explain the key elements involved in terminating projects and post project appraisals.......5
TASK 2............................................................................................................................................6
2.1 Identify most appropriate organizational structure, role and responsibilities of participants6
2.2 Control and coordinate a project............................................................................................6
2.3 Assess project leadership requirement and qualities.............................................................7
2.4 Plan and specify human resources and requirements for a project........................................7
TASK 3............................................................................................................................................8
3.1 Prepare project plans and establish the project organization ................................................8
3.2 Application of project scheduling, estimating and cost control techniques..........................8
3.3 Methods used to measure project performance.....................................................................9
3.4 Project change control procedures and evaluation of project................................................9
CONCLUSION................................................................................................................................9
REFERENCES..............................................................................................................................10
2

INTRODUCTION
Management of every project is essential in order to identify the future requirements of
the project in terms of everything. ASDA has been selected for the given project report which
held responsible for identifying their current needs and the obligations. This project report is all
about resolving the issues of CRM in this entity which further affecting the business performance
of an enterprise. The different principles and the importance of project management principles
and the systems are followed in order to identify the solutions to all the problems.
TASK 1
1.1 Describe background and principles of project management
Project management is that discipline where the whole projects are analyses in the
present in order to predict its future obligations. This is regarded as one of the important
approach in which the process has framed to analyze the future obligations to save the time of
the business (Gollenia, 2016). This is a process which includes setting and developing specific
market goals and the objectives to resolve the issues in achieving desired aims and the targets.
The weaknesses of the project will be bring out which involves time allotted to each and every
tasks with the funding requirements The finance need to be arranged by an enterprise to meet the
financial requirements of the business to support their overall project aim.
Principle of project management
Vision and Mission- The current project management issue is to resolve the issues faced by an
entity in CRM which affects the overall business performance of the business concern. The
beginning of the project will accompany with end solution to this problem.
Business objectives- The objectives framed y an entity is to reduce the current obligations
imposed on the business. The sales will be improved by focusing on accomplishing needs and
the objectives of the customers. The customer expectations are fulfilled by analyzing weak areas
responsible for the current issue.
Execution strategies- The implementation strategies are crafted by an individual in order to
place their ideas in its correct place in the business in order to gain additional benefits in the
future. The customer's satisfaction is to be improved by an entity owner by amending the CRM
software which are applied in the business to protect the needs of the existing and the potential
3
Management of every project is essential in order to identify the future requirements of
the project in terms of everything. ASDA has been selected for the given project report which
held responsible for identifying their current needs and the obligations. This project report is all
about resolving the issues of CRM in this entity which further affecting the business performance
of an enterprise. The different principles and the importance of project management principles
and the systems are followed in order to identify the solutions to all the problems.
TASK 1
1.1 Describe background and principles of project management
Project management is that discipline where the whole projects are analyses in the
present in order to predict its future obligations. This is regarded as one of the important
approach in which the process has framed to analyze the future obligations to save the time of
the business (Gollenia, 2016). This is a process which includes setting and developing specific
market goals and the objectives to resolve the issues in achieving desired aims and the targets.
The weaknesses of the project will be bring out which involves time allotted to each and every
tasks with the funding requirements The finance need to be arranged by an enterprise to meet the
financial requirements of the business to support their overall project aim.
Principle of project management
Vision and Mission- The current project management issue is to resolve the issues faced by an
entity in CRM which affects the overall business performance of the business concern. The
beginning of the project will accompany with end solution to this problem.
Business objectives- The objectives framed y an entity is to reduce the current obligations
imposed on the business. The sales will be improved by focusing on accomplishing needs and
the objectives of the customers. The customer expectations are fulfilled by analyzing weak areas
responsible for the current issue.
Execution strategies- The implementation strategies are crafted by an individual in order to
place their ideas in its correct place in the business in order to gain additional benefits in the
future. The customer's satisfaction is to be improved by an entity owner by amending the CRM
software which are applied in the business to protect the needs of the existing and the potential
3

customers. The support of all the employees and the staff members of customers executives are
needed as they know better to meet the higher needs and the expectations of the variety of
customers.
1.2 Appraise the viability of projects by developing success/failure criteria
The determination of the success or failure criteria of the business project is essential as it
helps in guide the current project in achieving the desired goals and the objectives framed by an
individual which is given as below:
Success criteria
Target meeting- The basic criteria determined by an individual related to the achievement of the
targets of the current project (Heagney, 2016). The existing issue of this project is to ascertain
the needs of the existing firm in relation to external environment in achieving customer
satisfaction. The issue is to resolve currently faces by an entity owner related to the deficiency in
the CRM system that affects the business performance. The targets for resolving this is
identifying current status of customers in this enterprise. The identification of customers needs
will further help in meeting the obligations imposed on this business in form of dissatisfaction.
The perspectives of both employer and the buyers are identified to meet the targets.
Right personnel- The responsibility's allocation is important element as wrong action taken by
an employee will further affect the business performance and spoil the current aim of this
project. The involvement of right employee in this project is top management, middle level
employee which involve customer care executives, sales representatives and the lower level
employees. The designated employees are assigned with unique tasks bad duties to achieve the
reason behind deficiency in the current CRM system to devise the new system.
1.3 Explain the principles behind project management systems and procedures
The companies in the corporate world uses the project management information system
in order to handle the current project in order to manage them in a proper way. The projects are
managed by adopting this system by offering quality oriented products which in turn increases
the efficiency of the work of an entity (Pollack and Adler, 2016). ASDA uses this approach in
order to increases the efficiency of the work in order to cater the needs and the obligations of
variety of customers. The current system will ensure different factors that helps in improving the
current business system in relation to its competitors which is given as follows:
4
needed as they know better to meet the higher needs and the expectations of the variety of
customers.
1.2 Appraise the viability of projects by developing success/failure criteria
The determination of the success or failure criteria of the business project is essential as it
helps in guide the current project in achieving the desired goals and the objectives framed by an
individual which is given as below:
Success criteria
Target meeting- The basic criteria determined by an individual related to the achievement of the
targets of the current project (Heagney, 2016). The existing issue of this project is to ascertain
the needs of the existing firm in relation to external environment in achieving customer
satisfaction. The issue is to resolve currently faces by an entity owner related to the deficiency in
the CRM system that affects the business performance. The targets for resolving this is
identifying current status of customers in this enterprise. The identification of customers needs
will further help in meeting the obligations imposed on this business in form of dissatisfaction.
The perspectives of both employer and the buyers are identified to meet the targets.
Right personnel- The responsibility's allocation is important element as wrong action taken by
an employee will further affect the business performance and spoil the current aim of this
project. The involvement of right employee in this project is top management, middle level
employee which involve customer care executives, sales representatives and the lower level
employees. The designated employees are assigned with unique tasks bad duties to achieve the
reason behind deficiency in the current CRM system to devise the new system.
1.3 Explain the principles behind project management systems and procedures
The companies in the corporate world uses the project management information system
in order to handle the current project in order to manage them in a proper way. The projects are
managed by adopting this system by offering quality oriented products which in turn increases
the efficiency of the work of an entity (Pollack and Adler, 2016). ASDA uses this approach in
order to increases the efficiency of the work in order to cater the needs and the obligations of
variety of customers. The current system will ensure different factors that helps in improving the
current business system in relation to its competitors which is given as follows:
4
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

The legal requirements of the company need to be fulfilled by fulfilling registration needs to give
legal identity to this business along with documentation requirements will create legal evidence.
Application of management and controlling strategies by transforming the manual transactions
into automatic manner in order to provide full support to an enterprise.
Principles used in project management procedures
Knowing current business nature- ASDA currently deals in providing grocery related products
to meet the needs of several individuals along with offering clothing and entertainment services
by collaborating with different partners (Young, 2016). The projects suitable for this entity is to
invest in the Tesco to get fame and recognition and most importantly to reduces the competition
among both the entities.
Understanding customer requirement- The customers need and their expectations towards the
products of ASDA are recognizes by conducting online survey on the website of this entity. The
requirements of the buyers will be identified in order to design new products or add unique
features in the dame products to attract wide number of customers towards this enterprise. The
customers expectations are identified by taking consent of an individual who visit the retail store
or online store of this enterprise by offering online vouchers and coupons to steal their interest.
1.4 Explain the key elements involved in terminating projects and post project appraisals
The project aim will be achieved by an entity in order to prepare closure requirement of
the business in advance as the closing of the project need to be defined in advance in order to
meet the basic requirements of the existing project. The end vision of the current project is to
meet the customer obligations by preparing current framework. The closure requirement framed
in advance will be helpful in order justify the project aims and the targets. The justification is to
be provide to the existing project that the current project will longer exist when all the aims and
targets will get fulfilled (Pollack and Adler, 2016). The termination approaches are applied by
the business enterprise in their current project by handling responsibilities to appropriate person.
The responsibilities is assigned to that personnel who will handle the long term tasks and the
duties in order to p[rovide future benefits to the existing business. Follow up of all the steps is
essential as in this way the work of an individual are checked at each and every step. The
accuracy of the information supplied from one stage to another for the beneficial of this entity.
5
legal identity to this business along with documentation requirements will create legal evidence.
Application of management and controlling strategies by transforming the manual transactions
into automatic manner in order to provide full support to an enterprise.
Principles used in project management procedures
Knowing current business nature- ASDA currently deals in providing grocery related products
to meet the needs of several individuals along with offering clothing and entertainment services
by collaborating with different partners (Young, 2016). The projects suitable for this entity is to
invest in the Tesco to get fame and recognition and most importantly to reduces the competition
among both the entities.
Understanding customer requirement- The customers need and their expectations towards the
products of ASDA are recognizes by conducting online survey on the website of this entity. The
requirements of the buyers will be identified in order to design new products or add unique
features in the dame products to attract wide number of customers towards this enterprise. The
customers expectations are identified by taking consent of an individual who visit the retail store
or online store of this enterprise by offering online vouchers and coupons to steal their interest.
1.4 Explain the key elements involved in terminating projects and post project appraisals
The project aim will be achieved by an entity in order to prepare closure requirement of
the business in advance as the closing of the project need to be defined in advance in order to
meet the basic requirements of the existing project. The end vision of the current project is to
meet the customer obligations by preparing current framework. The closure requirement framed
in advance will be helpful in order justify the project aims and the targets. The justification is to
be provide to the existing project that the current project will longer exist when all the aims and
targets will get fulfilled (Pollack and Adler, 2016). The termination approaches are applied by
the business enterprise in their current project by handling responsibilities to appropriate person.
The responsibilities is assigned to that personnel who will handle the long term tasks and the
duties in order to p[rovide future benefits to the existing business. Follow up of all the steps is
essential as in this way the work of an individual are checked at each and every step. The
accuracy of the information supplied from one stage to another for the beneficial of this entity.
5

There are different things need to be consider by an individual by preparing closing checklists
which is given as below:
Completion date will be enclosed in the structure
Information supplied will be incorporated
Responsibilities of all personnel are included in these checklists in order to ensure the business
efficiency.
TASK 2
2.1 Identify most appropriate organizational structure, role and responsibilities of participants
The project management structure formed by ASDA includes two divisions of the overall
assignment which includes training coordinator and accountant, provincial coordinator. The
customer's satisfaction is important concepts for this entity in which these designations are
assigned in order to allot specific responsibilities to achieve the project aim by gathering
important information to support the overall aims bad targets of the current business. The
scenario will remain the same in identifying the solutions for the current problem of this entity
which helps ion assessing the needs and the obligations to be borne by an individual.
The training coordinator will stress on the non-financial aspects that is the reasons
identified for achieving higher level of customer satisfaction for all the products offered to
several numbers of customers (Nanthagopan, Williams and Page, 2016). On other hand,
accountant are appointed which helps in seeking internal information related to the financial
aspects which helps in supporting the non-monetary areas by providing support. The employees
under the training coordinator includes customers executives and the sales representatives who
will helps in promoting the current business of ASDA in offering variety of services to different
set of customers. On other side, Accountants will include senior and supervisor will ensure the
overall project efficiency in order to offer different funds allotted to the tasks and activities of the
current project plan.
2.2 Control and coordinate a project
Control and coordination is that two terminologies which is backed with financial and
non-monetary supports of all the internal members of the business to get external market
opportunities in terms of wide number of customers (Heagney, 2016). The directors of the entity
will take the command of the overall project in their hand by preparing project organization. This
6
which is given as below:
Completion date will be enclosed in the structure
Information supplied will be incorporated
Responsibilities of all personnel are included in these checklists in order to ensure the business
efficiency.
TASK 2
2.1 Identify most appropriate organizational structure, role and responsibilities of participants
The project management structure formed by ASDA includes two divisions of the overall
assignment which includes training coordinator and accountant, provincial coordinator. The
customer's satisfaction is important concepts for this entity in which these designations are
assigned in order to allot specific responsibilities to achieve the project aim by gathering
important information to support the overall aims bad targets of the current business. The
scenario will remain the same in identifying the solutions for the current problem of this entity
which helps ion assessing the needs and the obligations to be borne by an individual.
The training coordinator will stress on the non-financial aspects that is the reasons
identified for achieving higher level of customer satisfaction for all the products offered to
several numbers of customers (Nanthagopan, Williams and Page, 2016). On other hand,
accountant are appointed which helps in seeking internal information related to the financial
aspects which helps in supporting the non-monetary areas by providing support. The employees
under the training coordinator includes customers executives and the sales representatives who
will helps in promoting the current business of ASDA in offering variety of services to different
set of customers. On other side, Accountants will include senior and supervisor will ensure the
overall project efficiency in order to offer different funds allotted to the tasks and activities of the
current project plan.
2.2 Control and coordinate a project
Control and coordination is that two terminologies which is backed with financial and
non-monetary supports of all the internal members of the business to get external market
opportunities in terms of wide number of customers (Heagney, 2016). The directors of the entity
will take the command of the overall project in their hand by preparing project organization. This
6

project organization is that technique in which different departmental employee's comes up
together with their individual talent to support the whole project in order to achieve the desired
aims and the targets.
The coordination in the project will be formed by adopting work breakdown structure in
which large set of work load imposed on single individual are divided into different categories.
The different individuals and management trainee are appointed to perform small tasks and
duties to contribute in the overall project.
2.3 Assess project leadership requirement and qualities
Leadership quality is that essential tool used by the project manager in order to motivate
their existing base of employees who are handling the current project with high precision. The
motivation is provided to all individuals in order to enhance their existing skills nad the
capabilities to move ahead in their career (Young, 2016). The vision will share by the top
management to all the employees to present future potential returns gained by an entity which
inspires its existing employees. The sharing of vision with the employees will help in increasing
the existing skills of all individuals who are contributing by striving hard in achieving the desired
aims and targets of an individual. The team building is another important objective of applying
leadership skills in the existing team of an individual who are gathered in one team to get future
market returns in form of achieving the desired aims and the targets. The team spirit will be
developed by an individual in the existing team which will be helpful for an entity to gain
competitive advantage over variety of customers.
2.4 Plan and specify human resources and requirements for a project
The activities of the current plan are identified along with the specific resources available
in an entity in order to achieve the market goals and the objectives (Gollenia, 2016). The human
resource requirement plan of the current plan is given as below:
Customer executives- This needs to be appointed who will cater the needs of different buyers
by personally contact each and every buyer.
Sales representatives- This will increase the existing level of sales in order to re-gain the trust
of different individuals
Accounts officer- This needs to be appointed in order to manage the existing financial
requirement of an entity.
7
together with their individual talent to support the whole project in order to achieve the desired
aims and the targets.
The coordination in the project will be formed by adopting work breakdown structure in
which large set of work load imposed on single individual are divided into different categories.
The different individuals and management trainee are appointed to perform small tasks and
duties to contribute in the overall project.
2.3 Assess project leadership requirement and qualities
Leadership quality is that essential tool used by the project manager in order to motivate
their existing base of employees who are handling the current project with high precision. The
motivation is provided to all individuals in order to enhance their existing skills nad the
capabilities to move ahead in their career (Young, 2016). The vision will share by the top
management to all the employees to present future potential returns gained by an entity which
inspires its existing employees. The sharing of vision with the employees will help in increasing
the existing skills of all individuals who are contributing by striving hard in achieving the desired
aims and targets of an individual. The team building is another important objective of applying
leadership skills in the existing team of an individual who are gathered in one team to get future
market returns in form of achieving the desired aims and the targets. The team spirit will be
developed by an individual in the existing team which will be helpful for an entity to gain
competitive advantage over variety of customers.
2.4 Plan and specify human resources and requirements for a project
The activities of the current plan are identified along with the specific resources available
in an entity in order to achieve the market goals and the objectives (Gollenia, 2016). The human
resource requirement plan of the current plan is given as below:
Customer executives- This needs to be appointed who will cater the needs of different buyers
by personally contact each and every buyer.
Sales representatives- This will increase the existing level of sales in order to re-gain the trust
of different individuals
Accounts officer- This needs to be appointed in order to manage the existing financial
requirement of an entity.
7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

TASK 3
3.1 Prepare project plans and establish the project organization
CRM is topic buzzed among the entrepreneurs and well established business firms. In the
era of fierce competition it is very important to craft strategy to attract and retain customers. It is
very important to entice the relevant entity in proper manner to convert prospective in to real
one. Project plan of CRM for the ASDA are as follows.
Developing marketing strategy: In this stage ASDA will develop marketing strategy for its
business (Samset and Volden, 2016). Tactics will be developed in such a way by using which
more sales can be generated from existing customers and prospective can be converted in to real
one.
Generation of data related to the relevant entity: In this stage data related to the people will be
collected from social media like Facebook. In this regard contact will be establish with the social
media and firms that are doing a work related to text analytics.
Establishing contact with customers: In third stage on the basis of derived information calls will
be done to the individuals that already purchase products from the ASDA store and feedback in
respect to service will be collected from them.
Communication of information to entity: On receipt of project on relevant time period call back
will be done the customers and relevant information will be provided to the customers.
3.2 Application of project scheduling, estimating and cost control techniques
Gantt chart is the basic technique that is used to do project scheduling. Under Gantt chart
diagram of sequence of activities is prepared (Gollenia, 2016). If it is identified that in specific
activity greater time is required the duration that is allotted to the less important activity is
curtailed. In this way project scheduling is done by using Gantt chart. There are lots of methods
that are used by the project managers to estimate the project cost. Under this past year data is
used by the managers and same is analyzed to estimate the likely amount of expenditure that
ASDA may need to made on the specific project. There are many methods of the cost control
like economic order quantity that are used by the ASDA to ensure that only required quantity of
goods are purchased from the market. Mentioned method prove effective for the firm.
8
3.1 Prepare project plans and establish the project organization
CRM is topic buzzed among the entrepreneurs and well established business firms. In the
era of fierce competition it is very important to craft strategy to attract and retain customers. It is
very important to entice the relevant entity in proper manner to convert prospective in to real
one. Project plan of CRM for the ASDA are as follows.
Developing marketing strategy: In this stage ASDA will develop marketing strategy for its
business (Samset and Volden, 2016). Tactics will be developed in such a way by using which
more sales can be generated from existing customers and prospective can be converted in to real
one.
Generation of data related to the relevant entity: In this stage data related to the people will be
collected from social media like Facebook. In this regard contact will be establish with the social
media and firms that are doing a work related to text analytics.
Establishing contact with customers: In third stage on the basis of derived information calls will
be done to the individuals that already purchase products from the ASDA store and feedback in
respect to service will be collected from them.
Communication of information to entity: On receipt of project on relevant time period call back
will be done the customers and relevant information will be provided to the customers.
3.2 Application of project scheduling, estimating and cost control techniques
Gantt chart is the basic technique that is used to do project scheduling. Under Gantt chart
diagram of sequence of activities is prepared (Gollenia, 2016). If it is identified that in specific
activity greater time is required the duration that is allotted to the less important activity is
curtailed. In this way project scheduling is done by using Gantt chart. There are lots of methods
that are used by the project managers to estimate the project cost. Under this past year data is
used by the managers and same is analyzed to estimate the likely amount of expenditure that
ASDA may need to made on the specific project. There are many methods of the cost control
like economic order quantity that are used by the ASDA to ensure that only required quantity of
goods are purchased from the market. Mentioned method prove effective for the firm.
8

3.3 Methods used to measure project performance
In order to measure project performance start and end time of each activity is taken in to
account. In this regard Microsoft project software is used by the managers (Gacasan and
Wiggins, 2016). In case delay is made in performance of the project task which lead to traction
in cost. This is interpreted as poor project performance in the specific duration. In case it is find
out that project task is completed before determined time then in that case it is assumed that
strong performance of project. Cost ratio is another method that is used to measure project
performance. Cost ratio reflects the variation that is observed in cost in respect to specific
variable. Hence, on the basis of change in cost ratio performance of project is measured.
3.4 Project change control procedures and evaluation of project
In the project change control procedure first stage is to propose a change that needs to be
implement (Padalkar and Gopinath, 2016). Thereafter, details about the impact that
implementation of change have on the business is evaluated. Decision in respect to
implementation change is made in third stage. Finally, in the fourth stage change is implemented
at the workplace. On evaluation of project, it is identified that same completed on time and
ASDA create many new one and retain old customers in the business.
CONCLUSION
It can be concluded from above project that project management technique has applied in
order to resolve the existing issue of CRM faced by ASDA. The current problems get simplified
by using variety of tools and technique to meet the specific requirements of an entity in order to
achieve higher level of customer satisfaction. The project plan has used which further helps in
scheduling the overall project.
9
In order to measure project performance start and end time of each activity is taken in to
account. In this regard Microsoft project software is used by the managers (Gacasan and
Wiggins, 2016). In case delay is made in performance of the project task which lead to traction
in cost. This is interpreted as poor project performance in the specific duration. In case it is find
out that project task is completed before determined time then in that case it is assumed that
strong performance of project. Cost ratio is another method that is used to measure project
performance. Cost ratio reflects the variation that is observed in cost in respect to specific
variable. Hence, on the basis of change in cost ratio performance of project is measured.
3.4 Project change control procedures and evaluation of project
In the project change control procedure first stage is to propose a change that needs to be
implement (Padalkar and Gopinath, 2016). Thereafter, details about the impact that
implementation of change have on the business is evaluated. Decision in respect to
implementation change is made in third stage. Finally, in the fourth stage change is implemented
at the workplace. On evaluation of project, it is identified that same completed on time and
ASDA create many new one and retain old customers in the business.
CONCLUSION
It can be concluded from above project that project management technique has applied in
order to resolve the existing issue of CRM faced by ASDA. The current problems get simplified
by using variety of tools and technique to meet the specific requirements of an entity in order to
achieve higher level of customer satisfaction. The project plan has used which further helps in
scheduling the overall project.
9

REFERENCES
Books and journals
Heagney, J., 2016. Fundamentals of project management. AMACOM Div American Mgmt
Assn.
Nanthagopan, Y., Williams, N. L. and Page, S., 2016. Understanding the nature of Project
Management capacity in Sri Lankan non-governmental organisations (NGOs): A Resource
Based Perspective. International Journal of Project Management. 34(8). pp.1608-1624.
Pollack, J. and Adler, D., 2016. Skills that improve profitability: The relationship between
project management, IT skills, and small to medium enterprise profitability. International
Journal of Project Management. 34(5). pp.831-838.
Young, T. L., 2016. Successful project management. Kogan Page Publishers.
Chen, H. L., Chen, W. T. and Lin, Y. L., 2016. Earned value project management: improving the
predictive power of planned value. International Journal of Project Management. 34(1).
pp.22-29.
Gollenia, L. A., 2016. Business Transformation Management Methodology. Routledge.
Samset, K. and Volden, G. H., 2016. Front-end definition of projects: Ten paradoxes and some
reflections regarding project management and project governance. International Journal of
Project Management. 34(2). pp.297-313.
Gaudenzi, B. and Christopher, M., 2016. Achieving supply chain ‘Leagility’through a project
management orientation. International Journal of Logistics Research and Applications.
19(1). pp.3-18.
Gacasan, E. M. P. and Wiggins, M. W., 2016. Sensemaking through cue utilisation in disaster
recovery project management. International Journal of Project Management.
Ekrot, B., Kock, A. and Gemünden, H. G., 2016. Retaining project management competence—
Antecedents and consequences. International Journal of Project Management. 34(2).
pp.145-157.
Katz, R., 2016. Challenges in doctoral research project management: A comparative study.
International Journal of Doctoral Studies. 11.
Flouris, T. G. and Lock, D., 2016. Aviation project management. Routledge.
10
Books and journals
Heagney, J., 2016. Fundamentals of project management. AMACOM Div American Mgmt
Assn.
Nanthagopan, Y., Williams, N. L. and Page, S., 2016. Understanding the nature of Project
Management capacity in Sri Lankan non-governmental organisations (NGOs): A Resource
Based Perspective. International Journal of Project Management. 34(8). pp.1608-1624.
Pollack, J. and Adler, D., 2016. Skills that improve profitability: The relationship between
project management, IT skills, and small to medium enterprise profitability. International
Journal of Project Management. 34(5). pp.831-838.
Young, T. L., 2016. Successful project management. Kogan Page Publishers.
Chen, H. L., Chen, W. T. and Lin, Y. L., 2016. Earned value project management: improving the
predictive power of planned value. International Journal of Project Management. 34(1).
pp.22-29.
Gollenia, L. A., 2016. Business Transformation Management Methodology. Routledge.
Samset, K. and Volden, G. H., 2016. Front-end definition of projects: Ten paradoxes and some
reflections regarding project management and project governance. International Journal of
Project Management. 34(2). pp.297-313.
Gaudenzi, B. and Christopher, M., 2016. Achieving supply chain ‘Leagility’through a project
management orientation. International Journal of Logistics Research and Applications.
19(1). pp.3-18.
Gacasan, E. M. P. and Wiggins, M. W., 2016. Sensemaking through cue utilisation in disaster
recovery project management. International Journal of Project Management.
Ekrot, B., Kock, A. and Gemünden, H. G., 2016. Retaining project management competence—
Antecedents and consequences. International Journal of Project Management. 34(2).
pp.145-157.
Katz, R., 2016. Challenges in doctoral research project management: A comparative study.
International Journal of Doctoral Studies. 11.
Flouris, T. G. and Lock, D., 2016. Aviation project management. Routledge.
10
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Padalkar, M. and Gopinath, S., 2016. Six decades of project management research: Thematic
trends and future opportunities. International Journal of Project Management. 34(7).
pp.1305-1321.
11
trends and future opportunities. International Journal of Project Management. 34(7).
pp.1305-1321.
11
1 out of 11
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.