Central Queensland University: Asset Management System Project Report

Verified

Added on  2023/02/03

|12
|432
|48
Report
AI Summary
This report presents a business case for implementing a cloud-based asset management system within an organization. It begins by outlining the current situation, which involves traditional data collection methods, and contrasts it with the desired future state enabled by cloud technology. The report explores various cloud model options (public, private, hybrid) and details the proposal's assumptions, including the availability of resources. A financial analysis is conducted using investment appraisal techniques such as NPV, IRR, and payback period. The analysis reveals a negative NPV, a positive IRR, and an estimated payback period. The report also includes a breakdown of fixed and variable costs, along with the contribution margin. Furthermore, it highlights the non-financial benefits of the system, such as risk mitigation and environmental advantages. The conclusion emphasizes the benefits of the asset management system, asserting that the company can recover all expenses within six years. The report is supported by references to relevant literature.
Document Page
Asset Management
System
(Project 2)
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Table of content
Introduction
Current Situation and desired future state
Options available
Proposal Assumptions
Financial analysis
Fixed variable cost and contribution margin
Non financial benefits
Conclusion
References
Document Page
Introduction
Asset management system is a process of developing, growing, upgrading
and maintaining the assets of an organization. In this presentation, an
understanding about this system is developed by introducing a new asset of
cloud technology in a business organization
Document Page
Current Situation and desired future state
Current situation of an organization includes traditional approaches of data
collection and storage such as flat files and manual accounts or records.
Desired future state of an organization after implementing the cloud
technology is estimated as managed data of company including employee
information and developed communication from clients.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Options available
Public cloud model
Private cloud model
Hybrid cloud model
Document Page
Proposal Assumptions
This proposal of cloud implementation has various estimates such as only
half of the materials are available to the organization This materials are
skills, equipment and tools. Another half of the required materials and
skills are assumed to be be procured from the external sources.
Document Page
Financial analysis
Financial analysis of an proposal can be conducted by investment appraisal
techniques such as NPV, IRR and Payback period.
NPV for this proposal is estimated as -1705.9227382
IRR for this proposal is estimated as 7.12%
Pay back period is estimated as 5-6 years
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Fixed variable cost and contribution margin
Fixed cost is estimated as 25000
Variable cost is estimated as 9100
Contribution margin will be as 50000-9100= 40900
Document Page
Non financial benefits
Risk mitigation
Safety
Environment
Regulatory
Social services
Document Page
Conclusion
From this presentation, it has been concluded that asset management
system is a process by which an organisation can manage and
maintain their assets. In this project, cloud implementation of an
organisation is analysed that how it can benefit the organisation and it
has evaluated that a company can wave off all the expenses in less
than 6 years.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
References
Zhang, H., Keoleian, G.A. and Lepech, M.D., 2012. Network-level
pavement asset management system integrated with life-cycle analysis
and life-cycle optimization. Journal of infrastructure Systems. 19(1).
pp.99-107.
Armstrong, M. and Taylor, S., 2014. Armstrong's handbook of human
resource management practice. Kogan Page Publishers
Document Page
Thank you
chevron_up_icon
1 out of 12
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]