The Wirefire project plan outlines a system designed to analyze Australian weather patterns and predict potential wildfires using big data technologies. The project scope includes detecting current weather conditions and assisting metallurgical departments with wildfire predictions. The project deliverables are scheduled for completion by June 25, 2018, with a total budget of $17,460.00 and a 49-day timeline. The waterfall model is selected for project development. The project team consists of a project manager, system engineer, and data scientist, each with defined roles and responsibilities. The communication plan details how project information will be disseminated to stakeholders. The work plan includes work breakdown structures and milestones. Risk analysis identifies potential risks, such as natural disasters and maintenance issues, along with proposed mitigation strategies like disaster policies and maintenance manuals. The project incorporates relevant literature on project planning and management.

Running head: PROJECT PLAN
Project Plan
Name of the Student:
Name of the University:
Author Note
Project Plan
Name of the Student:
Name of the University:
Author Note
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1
PROJECT PLAN
Table of Contents
Background..........................................................................................................................2
Project Scope.......................................................................................................................2
Project Deliverables.............................................................................................................2
Project Lifecycle Approach.................................................................................................2
Project team.........................................................................................................................3
Communication Plan...........................................................................................................3
Work Plan............................................................................................................................4
Work Break down Structures...............................................................................................4
Milestones............................................................................................................................4
Risk Analysis.......................................................................................................................5
Risk Identification...........................................................................................................5
Risk Mitigation................................................................................................................5
Bibliography........................................................................................................................7
PROJECT PLAN
Table of Contents
Background..........................................................................................................................2
Project Scope.......................................................................................................................2
Project Deliverables.............................................................................................................2
Project Lifecycle Approach.................................................................................................2
Project team.........................................................................................................................3
Communication Plan...........................................................................................................3
Work Plan............................................................................................................................4
Work Break down Structures...............................................................................................4
Milestones............................................................................................................................4
Risk Analysis.......................................................................................................................5
Risk Identification...........................................................................................................5
Risk Mitigation................................................................................................................5
Bibliography........................................................................................................................7

2
PROJECT PLAN
Background
The Wirefire project is being considered for discussion in this project plan document. The
project involves the analysis of the current weather of Australia and provides insights about the
possible wildfire resulting from the extreme climate of the place. The system would be using the
big data analysis technologies for the deployment of the project.
Project Scope
The scope of the project are:
The system would be able to detect the current weather specifications of the systems.
The system would also be able to provide assistances to the metallurgical department
about the possible wirefires taking place in the region.
The system would also be to perform an efficient analysis of the data that is recorded.
Project Deliverables
The project is scheduled to be delivered by Monday 6/25/18 and for a total budget of
$17,460.00. The project would be installed in the metallurgical department of Australia. The
project would be completed in 49 days.
Project Lifecycle Approach
For the development of the project waterfall model has been selected. This model is an
efficient lifecycle development model. This model is adopted as the budget and schedule of the
project is already defined. Additionally, there would be rare alteration in the project after the
project plan has been developed.
PROJECT PLAN
Background
The Wirefire project is being considered for discussion in this project plan document. The
project involves the analysis of the current weather of Australia and provides insights about the
possible wildfire resulting from the extreme climate of the place. The system would be using the
big data analysis technologies for the deployment of the project.
Project Scope
The scope of the project are:
The system would be able to detect the current weather specifications of the systems.
The system would also be able to provide assistances to the metallurgical department
about the possible wirefires taking place in the region.
The system would also be to perform an efficient analysis of the data that is recorded.
Project Deliverables
The project is scheduled to be delivered by Monday 6/25/18 and for a total budget of
$17,460.00. The project would be installed in the metallurgical department of Australia. The
project would be completed in 49 days.
Project Lifecycle Approach
For the development of the project waterfall model has been selected. This model is an
efficient lifecycle development model. This model is adopted as the budget and schedule of the
project is already defined. Additionally, there would be rare alteration in the project after the
project plan has been developed.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3
PROJECT PLAN
Project team
The project team would consist of the project manager, System Engineer, Data Scientist.
Role Responsibilities Name Comments
Project manager Project initiation
Risk analysis
Project Planning
Risk Mitigation
Project delivery
System Engineer Hardware Setup
Risk Analysis
Risk Mitigation
Data Scientist Risk analysis
Data analysis
Communication Plan
The communication plan for the project is provided below:
Message Objective Audience Distribution
Method
Frequency of
Distribution
Sender
Project
Initiation
Initiation and
meeting with
the clients
The clients,
sponsors
Face to face
meeting
At the start
only
Project
Manager
Project Status Notifying all
the
stakeholders
about the
current status
The client,
sponsors,
staffs, team
members
Round table
conference
Every week Project
Manager
PROJECT PLAN
Project team
The project team would consist of the project manager, System Engineer, Data Scientist.
Role Responsibilities Name Comments
Project manager Project initiation
Risk analysis
Project Planning
Risk Mitigation
Project delivery
System Engineer Hardware Setup
Risk Analysis
Risk Mitigation
Data Scientist Risk analysis
Data analysis
Communication Plan
The communication plan for the project is provided below:
Message Objective Audience Distribution
Method
Frequency of
Distribution
Sender
Project
Initiation
Initiation and
meeting with
the clients
The clients,
sponsors
Face to face
meeting
At the start
only
Project
Manager
Project Status Notifying all
the
stakeholders
about the
current status
The client,
sponsors,
staffs, team
members
Round table
conference
Every week Project
Manager
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4
PROJECT PLAN
of the project
Project
delivery
Delivering the
final project
The clients Face to face
meeting
At the end Project
Manager
Work Plan
Work Break down Structures
Milestones
The project milestones are
Task Name Start Finish
Wirefire Implementation Wed 4/18/18 Mon 6/25/18
Project Initiation Wed 4/18/18 Fri 4/27/18
Requirement Analysis Mon 4/30/18 Tue 5/8/18
Analysis Completion Tue 5/8/18 Tue 5/8/18
Project Planning Wed 5/9/18 Thu 5/17/18
Finalizing Project Plan Thu 5/17/18 Thu 5/17/18
System Implementation Fri 5/18/18 Thu 6/14/18
Completion of project implementation Thu 6/14/18 Thu 6/14/18
PROJECT PLAN
of the project
Project
delivery
Delivering the
final project
The clients Face to face
meeting
At the end Project
Manager
Work Plan
Work Break down Structures
Milestones
The project milestones are
Task Name Start Finish
Wirefire Implementation Wed 4/18/18 Mon 6/25/18
Project Initiation Wed 4/18/18 Fri 4/27/18
Requirement Analysis Mon 4/30/18 Tue 5/8/18
Analysis Completion Tue 5/8/18 Tue 5/8/18
Project Planning Wed 5/9/18 Thu 5/17/18
Finalizing Project Plan Thu 5/17/18 Thu 5/17/18
System Implementation Fri 5/18/18 Thu 6/14/18
Completion of project implementation Thu 6/14/18 Thu 6/14/18

5
PROJECT PLAN
Risk Management Fri 6/15/18 Fri 6/22/18
Completion of risk management Fri 6/22/18 Fri 6/22/18
Project Completion Mon 6/25/18 Mon 6/25/18
Risk Analysis
Risk Identification
After conducting a thorough analysis, the major risks identified for the system are:
Natural disasters: The system cannot predict any mishaps occurring from the natural disaster or
the man-made accidents. This is out of scope of the system.
Maintenance: There are various type of risks involved with the maintenance of the system. If the
devices in the system are note monitored efficiently then there might possible points in the
system that would be inefficient in performing the activities they are intended to. There would be
inefficiency in both recoding and analyzing data.
Risk Mitigation
For the identified risks the possible mitigation that can be adopted are:
Development of disaster policies: After the implementation of the system, some policies
regarding the natural disasters should be developed which provide assistances and guidance to
the authorities in order to manually handle the system for better results.
PROJECT PLAN
Risk Management Fri 6/15/18 Fri 6/22/18
Completion of risk management Fri 6/22/18 Fri 6/22/18
Project Completion Mon 6/25/18 Mon 6/25/18
Risk Analysis
Risk Identification
After conducting a thorough analysis, the major risks identified for the system are:
Natural disasters: The system cannot predict any mishaps occurring from the natural disaster or
the man-made accidents. This is out of scope of the system.
Maintenance: There are various type of risks involved with the maintenance of the system. If the
devices in the system are note monitored efficiently then there might possible points in the
system that would be inefficient in performing the activities they are intended to. There would be
inefficiency in both recoding and analyzing data.
Risk Mitigation
For the identified risks the possible mitigation that can be adopted are:
Development of disaster policies: After the implementation of the system, some policies
regarding the natural disasters should be developed which provide assistances and guidance to
the authorities in order to manually handle the system for better results.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6
PROJECT PLAN
Developing manuals for maintenance: There should be a manual in place for the maintenance of
the system. This set of activities described on the manual are to be performed efficiently to avoid
a possible system failure.
PROJECT PLAN
Developing manuals for maintenance: There should be a manual in place for the maintenance of
the system. This set of activities described on the manual are to be performed efficiently to avoid
a possible system failure.
1 out of 7
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.