This document is a comprehensive weekly progress report detailing the development of an automatic wireless health monitoring system. The report, authored by a student, outlines the project's progression across multiple weeks, including planning, requirements gathering, literature review, and risk assessment. Each week's progress is meticulously documented, highlighting planned activities, actual achievements, and any encountered issues. The report covers various aspects of the project, such as identifying the problem, selecting the topic, gathering requirements, planning, system architecture, cost and risk analysis, evaluation, and mitigation strategies. The document also includes an annotated bibliography, project details, and a project management section with a work breakdown structure, risk analysis, and a Gantt chart. The project focuses on utilizing wireless technology and cloud computing in healthcare to improve health monitoring.

Running head: WEEKLY PROGRESS REPORT
WEEKLY PROGRESS REPORT
Name of the Student:
Name of the University:
Author Note:
WEEKLY PROGRESS REPORT
Name of the Student:
Name of the University:
Author Note:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

ITC571 - WEEKLY PROGRESS REPORT
ID: 11643188 NAME: Dileep Kumar
PROJECT TITLE: Automatic Wireless Health Monitoring
WEEK NO: 2 DATE: [Please fill in the date]
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
Initialization of
the project
The planning of the project is needed to be
done. In this stage the identification of the
problem and the steps required for the
initialization of the project are planned.
The topic chosen for the project is
automatic wireless health monitoring
system. Through the wireless health
monitoring system, the management of the
health care system can be done
accordingly.
The identification off the project topic is
relevant as the use of the wireless
technology in the health care system is a
type of emerging technology.
ISSUES : There are certain issues regarding the selection of the topic. The use of the emerging technology has different examples and there were many
options available. It was problematic for selecting a particular topic for the research.
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The decision is
taken to work
on finding the
different
aspects of
automatic
wireless health
monitoring
system. In
order to this
this step is the
[Please fill in the date] The topic is selected. The selection of the
particular topic from various options is
done on the basis of certain parameters.
Apart from that , it has been seen that the
solution is going to be feasible for the
understanding of the emerging technology.
yes
ID: 11643188 NAME: Dileep Kumar
PROJECT TITLE: Automatic Wireless Health Monitoring
WEEK NO: 2 DATE: [Please fill in the date]
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
Initialization of
the project
The planning of the project is needed to be
done. In this stage the identification of the
problem and the steps required for the
initialization of the project are planned.
The topic chosen for the project is
automatic wireless health monitoring
system. Through the wireless health
monitoring system, the management of the
health care system can be done
accordingly.
The identification off the project topic is
relevant as the use of the wireless
technology in the health care system is a
type of emerging technology.
ISSUES : There are certain issues regarding the selection of the topic. The use of the emerging technology has different examples and there were many
options available. It was problematic for selecting a particular topic for the research.
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The decision is
taken to work
on finding the
different
aspects of
automatic
wireless health
monitoring
system. In
order to this
this step is the
[Please fill in the date] The topic is selected. The selection of the
particular topic from various options is
done on the basis of certain parameters.
Apart from that , it has been seen that the
solution is going to be feasible for the
understanding of the emerging technology.
yes

initial stage.
ID: 11643188 NAME: Dileep Kumar
PROJECT TITLE: Automatic Wireless Health Monitoring
WEEK NO: 3 DATE: [Please fill in the date]
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
The gathering
of the
requirements
of the project
This is the second stage of the project. In
this stage the gathering of the
requirements is done for the development
of the project.
The initial requirements for the
development of the software is done in this
stage. The significance of the requirements
are understood in a proper way so that the
documentation of the requirements is done
in a proper way.
It has been seen for the carrying on the
research, the understanding of the wireless
system and its relevance in the health
monitoring system are needed to be done.
In order to do this the review of the
literature from the different journals and
articles is needed to be done.
ISSUES: The review of the literature is done for understanding the concept of the wireless system and its application on the health care industry. The
selection of the article wad problematic, as the selection of the peer reviewed journals are needed to be consult during the development of the literature
review.
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The gathering
of the
requirements is
concern about
the essential
requirements
needed for the
proper
development of
[Please fill in the date]
The review of the literature is done for the
better understanding the use of wireless
technology in the health care sector.
yes
ID: 11643188 NAME: Dileep Kumar
PROJECT TITLE: Automatic Wireless Health Monitoring
WEEK NO: 3 DATE: [Please fill in the date]
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
The gathering
of the
requirements
of the project
This is the second stage of the project. In
this stage the gathering of the
requirements is done for the development
of the project.
The initial requirements for the
development of the software is done in this
stage. The significance of the requirements
are understood in a proper way so that the
documentation of the requirements is done
in a proper way.
It has been seen for the carrying on the
research, the understanding of the wireless
system and its relevance in the health
monitoring system are needed to be done.
In order to do this the review of the
literature from the different journals and
articles is needed to be done.
ISSUES: The review of the literature is done for understanding the concept of the wireless system and its application on the health care industry. The
selection of the article wad problematic, as the selection of the peer reviewed journals are needed to be consult during the development of the literature
review.
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The gathering
of the
requirements is
concern about
the essential
requirements
needed for the
proper
development of
[Please fill in the date]
The review of the literature is done for the
better understanding the use of wireless
technology in the health care sector.
yes

the project.
Apart from that
, it has been
seen that for
conducting the
research on the
topic needs the
review of the
literature.
ID: 11643188 NAME: Dileep Kumar
PROJECT TITLE: Automatic Wireless Health Monitoring
WEEK NO: 4 DATE: [Please fill in the date]
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
Making the
planning for
the project.
In this stage the planning for the project is
done. The planning is the blueprint for
execution of the project.
The planning for the further procedure
regarding the research for the development
of the wireless technology in the health
care system is evaluated in this stage.
The procedure has done in a proper way.
ISSUES: During the development of the project, it has been seen that there is a chance that the planning phase will become complicated. In order to make
the project planning simple and effective there is a need for the proper understanding of the project.
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
It has been [Please fill in the date] The planning is done in a proper way. The yes
Apart from that
, it has been
seen that for
conducting the
research on the
topic needs the
review of the
literature.
ID: 11643188 NAME: Dileep Kumar
PROJECT TITLE: Automatic Wireless Health Monitoring
WEEK NO: 4 DATE: [Please fill in the date]
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
Making the
planning for
the project.
In this stage the planning for the project is
done. The planning is the blueprint for
execution of the project.
The planning for the further procedure
regarding the research for the development
of the wireless technology in the health
care system is evaluated in this stage.
The procedure has done in a proper way.
ISSUES: During the development of the project, it has been seen that there is a chance that the planning phase will become complicated. In order to make
the project planning simple and effective there is a need for the proper understanding of the project.
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
It has been [Please fill in the date] The planning is done in a proper way. The yes
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

seen that there
can raise a
problem as the
understanding
of the emerging
technology can
be become
problematic for
the novice
people. Apart
from that there
is a chance
where the
complexity
raise during the
planning phase.
planning is simple and will not create
problem during the execution of the
project.
ID: 11643188 NAME: Dileep Kumar
PROJECT TITLE: Automatic Wireless Health Monitoring
WEEK NO: 5 DATE: [Please fill in the date]
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
can raise a
problem as the
understanding
of the emerging
technology can
be become
problematic for
the novice
people. Apart
from that there
is a chance
where the
complexity
raise during the
planning phase.
planning is simple and will not create
problem during the execution of the
project.
ID: 11643188 NAME: Dileep Kumar
PROJECT TITLE: Automatic Wireless Health Monitoring
WEEK NO: 5 DATE: [Please fill in the date]
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:

Report on the
selected topic.
In this stage the report has to be made on
the findings from the review of the
literature.
In the actual progress report, the
description of the wireless technology and
its significance on the health care system is
mentioned.
The cost and the risks included in the
project is also included in the report.
ISSUES: There are certain issues those are responsible for the development of the project. There is a need for the synchronization of all the factors in the
report.
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The costs and
the possible
risks are
needed to be
included in the
report.
[Please fill in the date]
The cost and the risks are mentioned in the
report regarding the use of the wireless
system in the health care sector.
yes
ID: 11643188 NAME: Dileep Kumar
PROJECT TITLE: Automatic Wireless Health Monitoring
WEEK NO: 6 DATE: [Please fill in the date]
PLANNING
selected topic.
In this stage the report has to be made on
the findings from the review of the
literature.
In the actual progress report, the
description of the wireless technology and
its significance on the health care system is
mentioned.
The cost and the risks included in the
project is also included in the report.
ISSUES: There are certain issues those are responsible for the development of the project. There is a need for the synchronization of all the factors in the
report.
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The costs and
the possible
risks are
needed to be
included in the
report.
[Please fill in the date]
The cost and the risks are mentioned in the
report regarding the use of the wireless
system in the health care sector.
yes
ID: 11643188 NAME: Dileep Kumar
PROJECT TITLE: Automatic Wireless Health Monitoring
WEEK NO: 6 DATE: [Please fill in the date]
PLANNING

MILESTONE: PLANNED: ACTUAL: COMMENT:
Execution of
the project
The proper system architecture for the
development of the proposed system is
done in this stage.
The system has been proposed on the basis
of the literature review/
The system has been proposed in a proper
way.
ISSUES
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The issues are
regrading the
cost and the
price.
[Please fill in the date] The cost and the risks are included in the
report for the proposed system. yes
ID: 11643188 NAME: Dileep Kumar
PROJECT TITLE: Automatic Wireless Health Monitoring
WEEK NO: 7 DATE: [Please fill in the date]
Execution of
the project
The proper system architecture for the
development of the proposed system is
done in this stage.
The system has been proposed on the basis
of the literature review/
The system has been proposed in a proper
way.
ISSUES
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The issues are
regrading the
cost and the
price.
[Please fill in the date] The cost and the risks are included in the
report for the proposed system. yes
ID: 11643188 NAME: Dileep Kumar
PROJECT TITLE: Automatic Wireless Health Monitoring
WEEK NO: 7 DATE: [Please fill in the date]
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
Analysis of the
risks and the
cost for the
proposed
system in the
organization.
The proper risks are needed to be
evaluated and the preparation of the
proper budget is needed to be developed.
The risks assessment is done in a proper
way.
The development of the assessment is
done in a proper way.
ISSUES
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The unwanted
requirements
are needed to
be avoided.
[Please fill in the date] Risk assessment is done in this context. yes
ID: 11643188 NAME: Dileep Kumar
PROJECT TITLE: Automatic Wireless Health Monitoring
MILESTONE: PLANNED: ACTUAL: COMMENT:
Analysis of the
risks and the
cost for the
proposed
system in the
organization.
The proper risks are needed to be
evaluated and the preparation of the
proper budget is needed to be developed.
The risks assessment is done in a proper
way.
The development of the assessment is
done in a proper way.
ISSUES
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The unwanted
requirements
are needed to
be avoided.
[Please fill in the date] Risk assessment is done in this context. yes
ID: 11643188 NAME: Dileep Kumar
PROJECT TITLE: Automatic Wireless Health Monitoring

WEEK NO: 8 DATE: [Please fill in the date]
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
Evaluation of
the work.
The evaluation of the proposed system is
done in a proper way.
The evaluation of the system is developed
through mentioning the significance of the
system in the daily functioning of the
health care system.
The process has been done in a proper
way.
ISSUES
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The risks are
needed to be
evaluated and
the solutions
are needed to
be mentioned.
[Please fill in the date] The risks mitigation plan is proposed as the
next step. yes
ID: 11643188 NAME: Dileep Kumar
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
Evaluation of
the work.
The evaluation of the proposed system is
done in a proper way.
The evaluation of the system is developed
through mentioning the significance of the
system in the daily functioning of the
health care system.
The process has been done in a proper
way.
ISSUES
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The risks are
needed to be
evaluated and
the solutions
are needed to
be mentioned.
[Please fill in the date] The risks mitigation plan is proposed as the
next step. yes
ID: 11643188 NAME: Dileep Kumar

PROJECT TITLE: Automatic Wireless Health Monitoring
WEEK NO: 9 DATE: [Please fill in the date]
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
Planning for
the mitigation
of the risks
The mitigation of the identified risks is
done in this stage.
The steps and the action mentioned for the
mitigation of the risks.
The work has been carried out in a proper
way.
ISSUES
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
There can be a
complexity in
the
identification of
the risks.
[Please fill in the date]
The identification of the risks in the system
along with the mitigation plan has been
done a proper way.
yes
WEEK NO: 9 DATE: [Please fill in the date]
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
Planning for
the mitigation
of the risks
The mitigation of the identified risks is
done in this stage.
The steps and the action mentioned for the
mitigation of the risks.
The work has been carried out in a proper
way.
ISSUES
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
There can be a
complexity in
the
identification of
the risks.
[Please fill in the date]
The identification of the risks in the system
along with the mitigation plan has been
done a proper way.
yes
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

ID: 11643188 NAME: Dileep Kumar
PROJECT TITLE:
WEEK NO: 10 DATE: [Please fill in the date]
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
Assessment of
the cost
In this stage the budgeting for the
development of the project is needed to be
evaluated.
The proper costing of the project is done on
the basis of the requirements. The work has been done in a proper way.
ISSUES
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The issue in this
stage is the
assigning of the
cost for
unnecessary
requirements.
[Please fill in the date] Proper budgeting is done in this stage. yes
PROJECT TITLE:
WEEK NO: 10 DATE: [Please fill in the date]
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
Assessment of
the cost
In this stage the budgeting for the
development of the project is needed to be
evaluated.
The proper costing of the project is done on
the basis of the requirements. The work has been done in a proper way.
ISSUES
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The issue in this
stage is the
assigning of the
cost for
unnecessary
requirements.
[Please fill in the date] Proper budgeting is done in this stage. yes

ID: 11643188 NAME: Dileep Kumar
PROJECT TITLE: Automatic Wireless Health Monitoring
WEEK NO: 11 DATE: [Please fill in the date]
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
Overall
evaluation of
the project
The overall evaluation of the project
regarding the cost and the risks are needed
to be done in this stage.
The evaluation of the wireless health
monitoring system is done in this stage. The evaluation is done in a proper way.
ISSUES
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Some of the
shortcomings
of the system
can be
overlooked.
[Please fill in the date]
The proper evaluation of the project is
done on the basis of the feedback from the
project manger and the users.
yes
PROJECT TITLE: Automatic Wireless Health Monitoring
WEEK NO: 11 DATE: [Please fill in the date]
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
Overall
evaluation of
the project
The overall evaluation of the project
regarding the cost and the risks are needed
to be done in this stage.
The evaluation of the wireless health
monitoring system is done in this stage. The evaluation is done in a proper way.
ISSUES
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
Some of the
shortcomings
of the system
can be
overlooked.
[Please fill in the date]
The proper evaluation of the project is
done on the basis of the feedback from the
project manger and the users.
yes

ID: 11643188 NAME: Dileep Kumar
PROJECT TITLE: Automatic Wireless Health Monitoring
WEEK NO: 12 DATE: [Please fill in the date]
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
Closing of the
project
After the evaluation of the overall project if
the system meets all the requirements, the
closing of the project will be done.
After the proper evaluation the closing of
the project is done.
The steps for the closing of the project is
done in a proper way
ISSUES
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The project
many not be
delivered in
time.
[Please fill in the date] The closing of the project and the delivery
of the project is done on time. yes
PROJECT TITLE: Automatic Wireless Health Monitoring
WEEK NO: 12 DATE: [Please fill in the date]
PLANNING
MILESTONE: PLANNED: ACTUAL: COMMENT:
Closing of the
project
After the evaluation of the overall project if
the system meets all the requirements, the
closing of the project will be done.
After the proper evaluation the closing of
the project is done.
The steps for the closing of the project is
done in a proper way
ISSUES
DESCRITPION: DATE: ACTION/RESULTS: FINISHED (Y/N)
The project
many not be
delivered in
time.
[Please fill in the date] The closing of the project and the delivery
of the project is done on time. yes
1 out of 13
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024  |  Zucol Services PVT LTD  |  All rights reserved.