UNIT 6 MANAGING A SUCCESSFUL
BUSINESS PROJECT
Student Name:
Student Id:
1 | P a g e
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
2 | P a g e
Document Page
Table of Contents
Introduction...................................................................................................................... 4
Task (a): Establish your aims and objectives for the project. Outline objectives and
timeframes based on the scenario set.............................................................................5
Task (b): Produce an appropriate project management plan that includes relevant
actions to meet objectives and timeframes......................................................................6
Task (c): Conduct research to generate knowledge which will form the basis for analysis
of the scenario posed in the brief...................................................................................10
Task (d): Analyse your findings and draw conclusions to form the basis for
recommendations...........................................................................................................13
Task (e): Present and produce your project in an appropriate manner for the intended
audience.........................................................................................................................14
Task (f): Communicate your recommendations in an appropriate manner for the
intended audience..........................................................................................................14
Task (g): Complete a performance review that addresses the following:.......................27
a. The success of the project and its usefulness in supporting organisational
performance................................................................................................................27
b. Own performance................................................................................................... 27
Conclusion..................................................................................................................... 29
References.....................................................................................................................30
Appendices 1................................................................................................................. 32
3 | P a g e
Document Page
List of figures
Figure 1: 4 steps of project planning................................................................................6
Figure 2: Gantt chart........................................................................................................8
Figure 3: slide 1..............................................................................................................14
Figure 4: slide 2..............................................................................................................15
Figure 5: slide 3..............................................................................................................16
Figure 6: slide 4..............................................................................................................17
Figure 7: slide 5..............................................................................................................18
Figure 8: slide 6..............................................................................................................19
Figure 9: slide 7..............................................................................................................20
Figure 10: slide 8............................................................................................................21
Figure 11: slide 9............................................................................................................22
Figure 12: slide 10..........................................................................................................23
Figure 13: slide 11..........................................................................................................24
Figure 14:slide 12...........................................................................................................25
Figure 15: slide 13..........................................................................................................25
4 | P a g e
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Introduction
The objective of the project research is to make the brand new summer shoes that are
to be present at the London fashion week that is held from the 16 th to 20th February
2019. Therefore, the report contains the planning, development, and testing before it is
present at the London fashion week. The report provides a complete scenario for
market summer shoes for improving project productivity. The aim of the research is for
creating the new strategies which compete with other market brands which help the
project design manager in managing the barker shoes design and launch. All
circumstances of the barker shoes are followed by project design manager. The quality
is also been tested whether it is good or bad. The decision is also made for launching
the shoes in the market. Further, for launching the barker shoes at the London fashion
week new design has to be created and tested so that the barker product must be
completed under the estimated time. Therefore, in the design or manufacturing of
Barker shoes the design is checked by the product design manager. So, new market
strategies have been developed.
5 | P a g e
Document Page
Task (a): Establish your aims and objectives for the project. Outline objectives
and timeframes based on the scenario set.
Aim and Objective: The British fashion council is organizing the London fashion week
for two times in a year in which the motto of product designing manager is to increase
the quality and looking of the Barker shoes. The design and looking of the Barker shoes
are represented in London fashion week. The primary focus of product stylist is
manufacturing the Barker shoe of low cost with high quality that results in improving
sales and products of the company. The product design engineer discusses with the
colleagues regarding design or shape or working of engineers that are manufacturing
Barker shoes. #-models are used in the opposite of staff and engineers that showcase
their ideas for making the shoes. The work is completed under the estimated deadline
so, in London, fashion week shoes are represented (Barker Shoes Europe, 2019).
The primary objective of the design manager has to create the shoes with new color
and shape of the Barker shoes. The different methods are understood on several
production methods that have good skills of practical, scientific and technical skills
regarding the launch or creation of Barker shoes. The likes or dislikes of people are
understood that helps in identifying the market trends of Barker shoes to get selected in
London fashion week.
6 | P a g e
Document Page
Task (b): Produce an appropriate project management plan that includes relevant
actions to meet objectives and timeframes.
Planning is defined as the natural procedure which helps in managing the project. In the
launch program of Barker shoes, some aspects are managed such as quality, cost,
time, etc. (Kerzner, 2019).
Figure 1: 4 steps of project planning
Source: (Celestialmedia, 2019)
Cost:
For attracting the buyer cost is to be fewer as compared to other market brands.
Therefore, the cost should be taken low by focusing all the perspective so, the buyers
are attracted more. For example, the product design engineer has decided the design of
Barker shoes in which the cost plan is designed by the design manager that is to be
related to the complete Barker shoes manufacturing process (Gunduz and Yahya,
2018).
Time:
For managing the time of the project plan, it is also one of the important features that
help in making the project under the estimated time and makes the project plan efficient.
The product manager has to make the proper plan of each time frame of every task
from planning to manufacturing if the Barker shoes. This helps in identifying the areas at
which extra time is taken by the appropriate task (McGivern, et. al., 2018).
7 | P a g e
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Communication:
In the manufacturing process of Barker shoes, formal or informal communication takes
place in project management planning. Product design manager is responsible to
perform each and every task in a smooth manner.
Resources:
The resources are the key attribute of the project plan process that ensures that if the
resources are utilized efficiently in the project than the project is completed effectively in
the project than the project is completed effectively. To make the barker shoes with
good quality the resources should be used full the product design manager provide the
plan for the resource.
Risk:
The project planning process helps in identifying and mitigating the risk that is involved
in the project. The plan helps in making the manufacturing or design of project efficient
so mitigation has been done for risk (Fee, 2018).
Quality:
The quality is the most important aspect for the buyer. The product design manager is
ensured the shoe quality of Barker shoes in which on quality is focused on the
manufacturing process. The qualitative approach is used that provide the development
of shoes in a quantitative manner.
Scope:
This phase helps in identifying or controlling the outputs of the project plan. It is the
decisive attribute that helps in managing the project relating to Barker shoes (ul Hassan,
et. al., 2018).
Work breakdown structure: WBS is defined as the process in which the deliverables
of the project is divided into small components that help in manufacturing the barker
shoes efficiently. WBS provides efficient features that make manufacturing efficiency.
The WBS helps in making the efficient action plan for barker shoes which provide the
actions that are carried out in the specific weeks (Robinson, Ryan and Abbasi, 2018).
Task Name Start Date Ending Date Duration
Project initiation 01-March-2019 01-March-2019 1
Developing the 02-March-2019 03-March-2019 2
8 | P a g e
Document Page
team
Project planning 04-March-2019 06-March-2019 3
Gather resources 07-March-2019 10-March-2019 4
Presentation 11-March-2019 12-March-2019 2
Reviewing project 13-March-2019 14-March-2019 2
Validating project 15-March-2019 16-March-2019 2
Final evaluation of
Barker shoes
17-March-2019 18-March-2019 2
Gantt chart
Figure 2: Gantt chart
On the basis of the project plan, one of the most important aspects is the project
schedule in the manufacturing of Barker shoes that mainly focus on the milestone
schedule. On the basis of the scheduling process the project design manager that has
to be complete the project under the estimated deadline with low cost and also use the
resources efficiently. In the milestone scheduling process, all the steps or activities
required in the project are implementing. The progress can be checked anytime by
checking the milestone schedule of the barker shoes (Sanghera, 2019).
9 | P a g e
Document Page
For evaluating the designing and manufacturing for barker shoes some factors have to
be considered in which different methods are applied (Zwikael, Chih, and Meredith,
2018).
Advantages of the project plan are:
Resources are utilized effectively and fully.
Product manage plan effectively manages the time.
The work progress has been tracked by the project manager.
Disadvantages of project plan:
Costly
Chance of conflict in the work
10 | P a g e
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Task (c): Conduct research to generate knowledge which will form the basis for
analysis of the scenario posed in the brief.
For manufacturing barker shoes with good design and productivity, several methods are
adopted by the product design manager which helps in meeting the expectation of the
project. For doing this the project plan should be analyzed or reviewed (Berger, 2019).
For meeting the goals and objective of the Barker shoes the responsibility of product
design manager is to use the qualitative approach and quantitative approach in the
design selection and in the manufacturing process. The market requirements, trends,
and needs are analyzed for manufacturing the barker summer shoes. The qualitative
method and quantitative methods are discussed below that are used for the fulfillment of
project objective are:
Quantitative method: The method is used for analyzing the collected data of survey
which is done by mathematical, computational and statistical techniques. The results
are changes by using computational techniques.
Qualitative methods: This method uses the detailed interview, document review which
helps the manufacturing efficiency of Barker shoes. For manufacturing, Barker
effectively shoes detailed information is required. A qualitative method is a subjective
approach which is unstructured in form. In qualitative method, the product design
manager has to identify all the features in the factory regarding specific products using
the qualitative method. The product design manager uses the qualitative method in the
development of the barker shoes which is more productive because it extracts the
information in detail for the product (Green, and Thorogood, 2018).
Questionnaire
Name-
Address-
Gender-
Q-1. Are you recommend the Barker shoes to your colleague, relative or friends?
11 | P a g e
Document Page
Yes
No
Q-2. Are you satisfies with the quality of Barker summer shoes?
Yes
No
Q-3. How much productivity is increased of Barker shoes?
High
Low
Q-4. How you rate the barker shoe quality?
High
Average
Low
Q-5. How frequently you buy Barker shoes?
Very fast
Fast
Not so like
Not like
Q-6. Is barker shoes is given competition to other shoe brands?
Yes
No
Q-7. Is the price of Barker shoes is satisfactory?
Yes
No
Q-8. How much you rate the overall barker shoes on the scale of 10?
1-3
3-5