This project management plan outlines the renovation of a bathroom, detailing the project's objective to remodel an existing bathroom within a month. It covers the project scope, stakeholders (including the project manager, client, consultant, resource manager, and interior designer), and funding. The plan defines success criteria, major deliverables (funding estimate, project plan, fixture removal/installation, and a remodeled bathroom), constraints (time, cost, resources), and assumptions. It includes an acceptance criteria section, a milestone schedule with a Gantt chart, and identifies potential risks like poor planning, cost overruns, and schedule delays. The project's budget, estimated at $26,000, is detailed, and approval requirements are specified. The project is supported by cited references, providing a comprehensive view of project management principles applied to a practical scenario.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.

RENOVATION OF BATHROOM
BU-345 PROJECT MANAGEMENT
STUDENT NAME
DATE
BU-345 PROJECT MANAGEMENT
STUDENT NAME
DATE
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Table of Contents
DESCRIPTION / OBJECTIVE...............................................................................................................2
PROJECT STAKEHOLDERS.................................................................................................................2
FUNDING..........................................................................................................................................2
PROJECT SUCCESS CRITERIA............................................................................................................2
MAJOR DELIVERABLES....................................................................................................................3
CONSTRAINTS...................................................................................................................................3
ASSUMPTIONS...................................................................................................................................3
ACCEPTANCE CRITERIA....................................................................................................................3
MILESTONE SCHEDULE....................................................................................................................3
RISKS................................................................................................................................................6
SUMMARY BUDGET..........................................................................................................................6
APPROVAL REQUIREMENTS..............................................................................................................6
BIBLIOGRAPHY............................................................................................................................7
1
DESCRIPTION / OBJECTIVE...............................................................................................................2
PROJECT STAKEHOLDERS.................................................................................................................2
FUNDING..........................................................................................................................................2
PROJECT SUCCESS CRITERIA............................................................................................................2
MAJOR DELIVERABLES....................................................................................................................3
CONSTRAINTS...................................................................................................................................3
ASSUMPTIONS...................................................................................................................................3
ACCEPTANCE CRITERIA....................................................................................................................3
MILESTONE SCHEDULE....................................................................................................................3
RISKS................................................................................................................................................6
SUMMARY BUDGET..........................................................................................................................6
APPROVAL REQUIREMENTS..............................................................................................................6
BIBLIOGRAPHY............................................................................................................................7
1

DESCRIPTION / OBJECTIVE
The undertaken bathroom renovation project aims to remodel the old bathroom of the landlord to provide an
upgraded bathroom. The objective of the undertaken project is to complete the entire work within 1 month. The
project involves removal of all the old fixtures of the existing bathroom and replacing the same with the new
fixtures. Along with that the bathroom will be re painted to provide new look to the old bathroom.
Scope Statement: The in-scope need of the project is to deliver a new bathroom to the landlord by removing and
renovating all the old fixtures. The project should be completed within 1 month and no delays in the project can be
accepted.
PROJECT STAKEHOLDERS
The table below provides the details of the main stakeholders linked with the bathroom renovation project-
Stakeholder Description
Project Manager The manager has the accountability of preparing a feasible plan
for successful project delivery
Client Here the client is the Landlord whose bathroom is being
renovated. The stakeholder is responsible for providing a
detailed project specification on basis of which the project plan
will be prepared
Consultant The stakeholder of the project is responsible managing the
majority of the construction works
Resource
Manager
The resource Manager is responsible for allocation of the project
resources as per the needs of the project
Interior Designer Is responsible for all the interior designing works of the
bathroom.
FUNDING
The sponsor of the project is the client and the funding for this bathroom renovation project will be sought from the
client only. The funding of the project will be dependent on the detailed estimation of the cost of renovating the
bathroom. Therefore, the estimation of the schedule and the resources are done at the start of the project to provide
with a detailed budget to the client.
PROJECT SUCCESS CRITERIA
The success criteria of any project refers to key measurable terms that are linked with the project outcome, which is
acceptable to the client and the other stakeholders (Kerzner, 2017). Therefore, successful closure of any undertaken
project is directly related to the fulfillment of these criteria. The success criteria of the bathroom renovation task are
indicated below-
1. The project is to be competed in a minimum time, preferably within a month
2. All the plumbing and facility equipment replacement is done within budget
2
The undertaken bathroom renovation project aims to remodel the old bathroom of the landlord to provide an
upgraded bathroom. The objective of the undertaken project is to complete the entire work within 1 month. The
project involves removal of all the old fixtures of the existing bathroom and replacing the same with the new
fixtures. Along with that the bathroom will be re painted to provide new look to the old bathroom.
Scope Statement: The in-scope need of the project is to deliver a new bathroom to the landlord by removing and
renovating all the old fixtures. The project should be completed within 1 month and no delays in the project can be
accepted.
PROJECT STAKEHOLDERS
The table below provides the details of the main stakeholders linked with the bathroom renovation project-
Stakeholder Description
Project Manager The manager has the accountability of preparing a feasible plan
for successful project delivery
Client Here the client is the Landlord whose bathroom is being
renovated. The stakeholder is responsible for providing a
detailed project specification on basis of which the project plan
will be prepared
Consultant The stakeholder of the project is responsible managing the
majority of the construction works
Resource
Manager
The resource Manager is responsible for allocation of the project
resources as per the needs of the project
Interior Designer Is responsible for all the interior designing works of the
bathroom.
FUNDING
The sponsor of the project is the client and the funding for this bathroom renovation project will be sought from the
client only. The funding of the project will be dependent on the detailed estimation of the cost of renovating the
bathroom. Therefore, the estimation of the schedule and the resources are done at the start of the project to provide
with a detailed budget to the client.
PROJECT SUCCESS CRITERIA
The success criteria of any project refers to key measurable terms that are linked with the project outcome, which is
acceptable to the client and the other stakeholders (Kerzner, 2017). Therefore, successful closure of any undertaken
project is directly related to the fulfillment of these criteria. The success criteria of the bathroom renovation task are
indicated below-
1. The project is to be competed in a minimum time, preferably within a month
2. All the plumbing and facility equipment replacement is done within budget
2

3. The inspection should indicate no water leakage or damage of the existing facility
MAJOR DELIVERABLES
The key deliverables of the undertaken bathroom renovation are indicated below-
1. Delivery of Funding/budget Estimate
2. Delivery of a Feasible Project Plan
3. Removal of all the old Fixtures of the Bathroom
4. Fitting the new Fixture
5. Delivering a completely remodeled Bathroom to the client
CONSTRAINTS
The execution of the project is subjected to certain key constrains which are indicated as follows-
1. The time is a constraint as the bathroom cannot be kept engaged for a longer time.
2. Cost is a constraint as the landlord can spend only a limited money on the renovation project
3. Resource is a constraint as the project is to be completed is a limited budget and hence a large number of resource
cannot be engaged in the project.
ASSUMPTIONS
The assumptions that are considered for designing and planning the bathroom renovation project are indicated as
follows-
1. The key assumption is that landlord will make alternate arrangements of the bathroom during the renovation of
the old bathroom
2. It is assumed that the resources of the project will be readily available during the execution phase
3. It is assumed that the payment for buying the needed bathroom equipment and fittings will be achieved at the start
of the project.
ACCEPTANCE CRITERIA
The acceptance criteria for the closure of the bathroom renovation project are indicated as follows-
1. No leakage issues are detected in the new bathroom
2. The Project takes no longer than 30 days for completion
3. The project is accomplished within the allocated budget of $26,000
MILESTONE SCHEDULE
The table below gives an idea of key milestone of the undertaken bathroom renovation project
3
MAJOR DELIVERABLES
The key deliverables of the undertaken bathroom renovation are indicated below-
1. Delivery of Funding/budget Estimate
2. Delivery of a Feasible Project Plan
3. Removal of all the old Fixtures of the Bathroom
4. Fitting the new Fixture
5. Delivering a completely remodeled Bathroom to the client
CONSTRAINTS
The execution of the project is subjected to certain key constrains which are indicated as follows-
1. The time is a constraint as the bathroom cannot be kept engaged for a longer time.
2. Cost is a constraint as the landlord can spend only a limited money on the renovation project
3. Resource is a constraint as the project is to be completed is a limited budget and hence a large number of resource
cannot be engaged in the project.
ASSUMPTIONS
The assumptions that are considered for designing and planning the bathroom renovation project are indicated as
follows-
1. The key assumption is that landlord will make alternate arrangements of the bathroom during the renovation of
the old bathroom
2. It is assumed that the resources of the project will be readily available during the execution phase
3. It is assumed that the payment for buying the needed bathroom equipment and fittings will be achieved at the start
of the project.
ACCEPTANCE CRITERIA
The acceptance criteria for the closure of the bathroom renovation project are indicated as follows-
1. No leakage issues are detected in the new bathroom
2. The Project takes no longer than 30 days for completion
3. The project is accomplished within the allocated budget of $26,000
MILESTONE SCHEDULE
The table below gives an idea of key milestone of the undertaken bathroom renovation project
3
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Summary Milestone Schedule
Project Milestone Target Date
(mm/dd/yyyy)
Project Start Thu 01-23-20
Development of Project Plan Mon 01-27-20
Removal of Old Bathroom Fixtures Tue 02-04-20
Completion of construction of New Bathroom Mon 02-10-20
Inspection and Bathroom is Ready to Use Wed 02-12-20
Project Complete Tue 02-18-20
The following figure illustrates the Gantt chart of the bathroom renovation project. The Gantt chart represents the
sequence in which each of the project task is to be implemented to ascertain that all the acceptance criteria of the
project is achieved.
4
Project Milestone Target Date
(mm/dd/yyyy)
Project Start Thu 01-23-20
Development of Project Plan Mon 01-27-20
Removal of Old Bathroom Fixtures Tue 02-04-20
Completion of construction of New Bathroom Mon 02-10-20
Inspection and Bathroom is Ready to Use Wed 02-12-20
Project Complete Tue 02-18-20
The following figure illustrates the Gantt chart of the bathroom renovation project. The Gantt chart represents the
sequence in which each of the project task is to be implemented to ascertain that all the acceptance criteria of the
project is achieved.
4

Figure 1: Demonstrating the Gantt chart of the Bathroom Renovation Project
5
5

The tasks that are marked in red in the Gantt chart above indicates the project critical path of the undertaken
bathroom renovation project.
RISKS
Identification of the key risks in the project is necessary to address the uncertainties that can disturb the normal
accomplishment of the project (Ji & Yao, 2017). The Risk factors that can affect the normal execution of the project
are documented in the table below-
High Level Rick – List high level project risk
Risk Factor Project Impact
(High, Med, Low)
Poor Planning and Design High
Cost Overrun Medium
Lack of Resources or Resource Unavailability Medium
Schedule Delays High
Absence of Backup Bathroom High
SUMMARY BUDGET
The table below represents the overall cost of the resources needed, the equipment cost and other expenses. This is
the estimated or projected budget of the bathroom renovation.
Summary Budget – List component project costs
Project Component Component Cost
Resources (including electrician, plumber and interior
decorator)
$8,000
Bathroom Equipment Cost $15,000
Cost of Paint and other interior decoration needs $2,000
Garbage removal and cleaning cost $1,000
Total $26,000
The table above represents the projected budget of the bathroom renovation project. The resource cost is high since
the project is a high priority project and is to be competed in a less time.
APPROVAL REQUIREMENTS
The charter prepared will be approved by the client. Only after the approval of the charter by the client, the project
will move to the execution phase. The On approval of this charter, the client will be agreeing to all the project
assumptions, acceptance criteria, budget and the schedule estimated for the bathroom renovation project.
6
bathroom renovation project.
RISKS
Identification of the key risks in the project is necessary to address the uncertainties that can disturb the normal
accomplishment of the project (Ji & Yao, 2017). The Risk factors that can affect the normal execution of the project
are documented in the table below-
High Level Rick – List high level project risk
Risk Factor Project Impact
(High, Med, Low)
Poor Planning and Design High
Cost Overrun Medium
Lack of Resources or Resource Unavailability Medium
Schedule Delays High
Absence of Backup Bathroom High
SUMMARY BUDGET
The table below represents the overall cost of the resources needed, the equipment cost and other expenses. This is
the estimated or projected budget of the bathroom renovation.
Summary Budget – List component project costs
Project Component Component Cost
Resources (including electrician, plumber and interior
decorator)
$8,000
Bathroom Equipment Cost $15,000
Cost of Paint and other interior decoration needs $2,000
Garbage removal and cleaning cost $1,000
Total $26,000
The table above represents the projected budget of the bathroom renovation project. The resource cost is high since
the project is a high priority project and is to be competed in a less time.
APPROVAL REQUIREMENTS
The charter prepared will be approved by the client. Only after the approval of the charter by the client, the project
will move to the execution phase. The On approval of this charter, the client will be agreeing to all the project
assumptions, acceptance criteria, budget and the schedule estimated for the bathroom renovation project.
6
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

BIBLIOGRAPHY
Derenskaya, Y. (2018). Project scope management process. Baltic Journal of Economic Studies, 4(1), 118-125.
Hopkinson, M. (2017). The project risk maturity model: Measuring and improving risk management capability.
Routledge.
Hussein, B. A., & Klakegg, O. J. (2014). Measuring the impact of risk factors associated with project success
criteria in early phase. Procedia-Social and Behavioral Sciences, 119, 711-718.
Ji, X., & Yao, K. (2017). Uncertain project scheduling problem with resource constraints. Journal of Intelligent
Manufacturing, 28(3), 575-580.
Kerzner, H. (2017). Project management metrics, KPIs, and dashboards: a guide to measuring and monitoring
project performance. John Wiley & Sons.
Kerzner, H. (2017). Project management: a systems approach to planning, scheduling, and controlling. John Wiley
& Sons.
Kerzner, H. (2019). Using the project management maturity model: strategic planning for project management.
John Wiley & Sons.
Kliem, R. L., & Ludin, I. S. (2019). Reducing project risk. Routledge.
Nath, A., & Momin, M. M. (2014). Project scope management: A pivotal tool for project's success. International
Journal of Management, IT and Engineering, 4(8), 279-288.
7
Derenskaya, Y. (2018). Project scope management process. Baltic Journal of Economic Studies, 4(1), 118-125.
Hopkinson, M. (2017). The project risk maturity model: Measuring and improving risk management capability.
Routledge.
Hussein, B. A., & Klakegg, O. J. (2014). Measuring the impact of risk factors associated with project success
criteria in early phase. Procedia-Social and Behavioral Sciences, 119, 711-718.
Ji, X., & Yao, K. (2017). Uncertain project scheduling problem with resource constraints. Journal of Intelligent
Manufacturing, 28(3), 575-580.
Kerzner, H. (2017). Project management metrics, KPIs, and dashboards: a guide to measuring and monitoring
project performance. John Wiley & Sons.
Kerzner, H. (2017). Project management: a systems approach to planning, scheduling, and controlling. John Wiley
& Sons.
Kerzner, H. (2019). Using the project management maturity model: strategic planning for project management.
John Wiley & Sons.
Kliem, R. L., & Ludin, I. S. (2019). Reducing project risk. Routledge.
Nath, A., & Momin, M. M. (2014). Project scope management: A pivotal tool for project's success. International
Journal of Management, IT and Engineering, 4(8), 279-288.
7
1 out of 8
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.