BIM Implementation in Construction: A Case Study of Williams Towers
VerifiedAdded on 2023/04/23
|5
|1318
|145
Case Study
AI Summary
This case study examines the implementation of Building Information Modeling (BIM) in the Williams Towers construction project in Woodlands, Texas, undertaken by Chicago Bridge & Iron Company. It outlines the importance of project management principles and the integration of BIM to facilitate data flow from design to construction. The study delves into technical aspects of BIM, including clash control, time estimation (4D), and cost estimation (5D), highlighting its potential to automate quantity take-offs and reduce costs. It emphasizes the application of BIM in improving project yield, productivity, and sustainability, while reducing lifecycle costs and errors. The methodologies used include site visits, project documentation analysis, and worker interviews to investigate the use of BIM for cost and time evaluation. The study identifies challenges in BIM adoption and concludes by reflecting on the need for organizations to overcome competition in BIM implementation, offering a comprehensive overview of BIM's role in modern construction projects. Desklib provides access to similar case studies and solved assignments for students.

Construction of Williams towers with BIM Implementation
Student Name
Professor’s Name
Affiliation
Date
Student Name
Professor’s Name
Affiliation
Date
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Introduction
Williams towers construction project was done in Woodlands Texas by Chicago Bridge
& Iron Company. A venture alludes to an assignment or rather work that goes for accomplishing
a specific arrangement of goals, has a known begin and end time, has a financial plan, extension,
and quality (Geraldi and Söderlund ,2018)). It is regularly overseen by a group involving
partners, who work together all through the whole periods of the venture from the earliest
starting point and end when the task arrives at an end.
To guarantee successful conveyance of a quality undertaking, just venture the board
which includes the utilization of instruments, aptitudes, learning and suitable procedures. A task
ordinarily takes the accompanying four phases; commencement stage, Designing and arranging
stage, Implementation stage lastly the undertaking conclusion or eliminate (Tonchia, Tonchia
and Mahagaonkar ,2018). Building data displaying is a procedure that is incorporated and
planned in a way that can facilitate data from structure, development to the last task. All the
more ideally, it allows the architects to rapidly and effectively anticipate the execution and
format of tasks preceding the genuine building (Martinez-Aires, Lopez-Alonso and Martinez-
Rojas, 2018).
Specialized Aspects of BIM
In this subtopic, I'll expound on a few elements of the BIM concerning its different
highlights;
i. Clash control-the building data models of different dimensions are gathered and
checked for geometrical structures.
ii. A part of time estimation (4D) - estimation of time amid the undertaking running
limits additional expenses to be acquired.
iii. A part of cost estimation (5D) – Cost evaluating is as of now a tedious procedure,
requiring a whole group of estimators.
There are different elements impeding the change to demonstrate based on evaluation; as
it is, the dangers are defended by the advantages of assessing with BIM. Building Information
Williams towers construction project was done in Woodlands Texas by Chicago Bridge
& Iron Company. A venture alludes to an assignment or rather work that goes for accomplishing
a specific arrangement of goals, has a known begin and end time, has a financial plan, extension,
and quality (Geraldi and Söderlund ,2018)). It is regularly overseen by a group involving
partners, who work together all through the whole periods of the venture from the earliest
starting point and end when the task arrives at an end.
To guarantee successful conveyance of a quality undertaking, just venture the board
which includes the utilization of instruments, aptitudes, learning and suitable procedures. A task
ordinarily takes the accompanying four phases; commencement stage, Designing and arranging
stage, Implementation stage lastly the undertaking conclusion or eliminate (Tonchia, Tonchia
and Mahagaonkar ,2018). Building data displaying is a procedure that is incorporated and
planned in a way that can facilitate data from structure, development to the last task. All the
more ideally, it allows the architects to rapidly and effectively anticipate the execution and
format of tasks preceding the genuine building (Martinez-Aires, Lopez-Alonso and Martinez-
Rojas, 2018).
Specialized Aspects of BIM
In this subtopic, I'll expound on a few elements of the BIM concerning its different
highlights;
i. Clash control-the building data models of different dimensions are gathered and
checked for geometrical structures.
ii. A part of time estimation (4D) - estimation of time amid the undertaking running
limits additional expenses to be acquired.
iii. A part of cost estimation (5D) – Cost evaluating is as of now a tedious procedure,
requiring a whole group of estimators.
There are different elements impeding the change to demonstrate based on evaluation; as
it is, the dangers are defended by the advantages of assessing with BIM. Building Information

Modeling has the capacity to robotize an amount take-off, which will decrease the time and costs
required to gauge a venture; be that as it may, the industry isn't utilizing BIM for evaluating this
gauges the costs of an assortment of articles in 3D (Saieg et al. 2018). The BIM ought to be
executed well ordered in each stage to guarantee the smooth procedure of usage.
Application of BIM in Construction Project
The development ventures have been confronting designed changes to;
(i) Improve yield, productivity, framework esteem, quality, and manageability.
(ii) Reduce; lifecycle costs, lead times and duplicates, through powerful coordinated
effort and correspondence of partners in development ventures. Computerized development is an
activity to handle low efficiency in the segment. This expects to coordinate undertakings all
through the whole lifecycle by utilizing BIM frameworks. This limits the various blunders that
were made while utilizing conventional procedures.
The correspondence advantage that BIM gives is basic to extend supervisors and relates
to what was depicted in principle to presume that the customer's objectives with an undertaking
are regularly difficult to translate (Fisher et al, 2018). Correspondence is urgent for making
understanding in regards to a customer's objectives with a venture (Kong, Liu and Wang, 2018).
Technologies Used
A meeting, site visits, venture documentation examination, and the workers were directed
to investigate the development business' utilization of Building Information displaying for
expense and time evaluating in the US. The study was led to comprehend the job of BIM's to
create cost evaluations for development ventures. Scholarly research included assessing
scholastic papers and testing BIM programming to analyze the challenges in changing from
customary evaluating techniques to assessing with Building Information Modeling.
Reactions were arranged to distinguish whether members were utilized by little, medium,
or vast organizations. The initial phase in the review was to get data about the study members.
required to gauge a venture; be that as it may, the industry isn't utilizing BIM for evaluating this
gauges the costs of an assortment of articles in 3D (Saieg et al. 2018). The BIM ought to be
executed well ordered in each stage to guarantee the smooth procedure of usage.
Application of BIM in Construction Project
The development ventures have been confronting designed changes to;
(i) Improve yield, productivity, framework esteem, quality, and manageability.
(ii) Reduce; lifecycle costs, lead times and duplicates, through powerful coordinated
effort and correspondence of partners in development ventures. Computerized development is an
activity to handle low efficiency in the segment. This expects to coordinate undertakings all
through the whole lifecycle by utilizing BIM frameworks. This limits the various blunders that
were made while utilizing conventional procedures.
The correspondence advantage that BIM gives is basic to extend supervisors and relates
to what was depicted in principle to presume that the customer's objectives with an undertaking
are regularly difficult to translate (Fisher et al, 2018). Correspondence is urgent for making
understanding in regards to a customer's objectives with a venture (Kong, Liu and Wang, 2018).
Technologies Used
A meeting, site visits, venture documentation examination, and the workers were directed
to investigate the development business' utilization of Building Information displaying for
expense and time evaluating in the US. The study was led to comprehend the job of BIM's to
create cost evaluations for development ventures. Scholarly research included assessing
scholastic papers and testing BIM programming to analyze the challenges in changing from
customary evaluating techniques to assessing with Building Information Modeling.
Reactions were arranged to distinguish whether members were utilized by little, medium,
or vast organizations. The initial phase in the review was to get data about the study members.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Members got some information about the extent of their organization, their area, and their
expected set of responsibilities. The second classification of inquiries identified with BIM
programming, as members were asked what BIM programs they are at present utilizing, how
evaluating projects are being combined with BIM, and if BIM is being used for amount take-off,
valuing, and planning.
The review was finished by people in an assortment of positions inside the development
business, including proprietors, VPs, BIM chiefs, BIM designers, estimators, and modelers, the
analysts could recognize the most referred to challenge related with BIM execution, according to
the writing (Neves, Sampaio and Vilela, 2019).
Subsequent to aggregating and recognizing the significance of each test identified with
BIM usage, the rundown of arranged difficulties was exposed to an obliged heap sort. This
enabled specialists to sort the distinguished constraints to classifications (Olawumi and
Chan ,2019). The three classes for the examination were the relevance of the distinguished test to
extend, association, or both. Thusly, toward the finish of this stage, the creators could decide a
complete rundown of difficulties affecting BIM usage and after that partner each test to prior
built up classes
Conclusion
The fundamental expectation of this investigation was to recognize traps regarding the
reception of BIM, after altogether experiencing the writing, a few sorts of research, and the
examination could decide various downsides that influence BIM usage. The above gives a
perfect reflection of the organizations demand to overcome the opposition for the
implementation of the BIM compared to the ventures.
expected set of responsibilities. The second classification of inquiries identified with BIM
programming, as members were asked what BIM programs they are at present utilizing, how
evaluating projects are being combined with BIM, and if BIM is being used for amount take-off,
valuing, and planning.
The review was finished by people in an assortment of positions inside the development
business, including proprietors, VPs, BIM chiefs, BIM designers, estimators, and modelers, the
analysts could recognize the most referred to challenge related with BIM execution, according to
the writing (Neves, Sampaio and Vilela, 2019).
Subsequent to aggregating and recognizing the significance of each test identified with
BIM usage, the rundown of arranged difficulties was exposed to an obliged heap sort. This
enabled specialists to sort the distinguished constraints to classifications (Olawumi and
Chan ,2019). The three classes for the examination were the relevance of the distinguished test to
extend, association, or both. Thusly, toward the finish of this stage, the creators could decide a
complete rundown of difficulties affecting BIM usage and after that partner each test to prior
built up classes
Conclusion
The fundamental expectation of this investigation was to recognize traps regarding the
reception of BIM, after altogether experiencing the writing, a few sorts of research, and the
examination could decide various downsides that influence BIM usage. The above gives a
perfect reflection of the organizations demand to overcome the opposition for the
implementation of the BIM compared to the ventures.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

References
Fisher, L. M., Martinez, A. S., Richmond, F. J., Krieger, M. D., Wilkinson, E. P., & Eisenberg,
L. S. (2018). Assessing the Benefit-Risk Profile for Pediatric Implantable Auditory
Prostheses. Therapeutic innovation & regulatory science, 52(5), 669-679.
Geraldi, J., & Söderlund, J. (2018). Project studies: What it is, where it is going. International
Journal of Project Management, 36(1), 55-70.
Kong, D., Liu, S., & Wang, Y. (2018). Learning from outsiders: Do managers benefit from
communication with market participants? Finance Research Letters, 26, 192-197.
Martinez-Aires, M. D., Lopez-Alonso, M., & Martinez-Rojas, M. (2018). Building information
modeling and safety management: A systematic review. Safety science, 101, 11-18.
Neves, J., Sampaio, Z., & Vilela, M. (2019). A Case Study of BIM Implementation in Rail Track
Rehabilitation. Infrastructures, 4(1), 8.
Olawumi, T. O., & Chan, D. W. (2019). Development of a benchmarking model for BIM
implementation in developing countries. Benchmarking: An International Journal.
Saieg, P., Sotelino, E. D., Nascimento, D., & Caiado, R. G. G. (2018). Interactions of building
information modeling, lean and sustainability on the architectural, engineering and
construction industry: a systematic review. Journal of Cleaner Production, 174, 788-806.
Tonchia, S., Tonchia, & Mahagaonkar. (2018). Industrial project management. Springer.
Fisher, L. M., Martinez, A. S., Richmond, F. J., Krieger, M. D., Wilkinson, E. P., & Eisenberg,
L. S. (2018). Assessing the Benefit-Risk Profile for Pediatric Implantable Auditory
Prostheses. Therapeutic innovation & regulatory science, 52(5), 669-679.
Geraldi, J., & Söderlund, J. (2018). Project studies: What it is, where it is going. International
Journal of Project Management, 36(1), 55-70.
Kong, D., Liu, S., & Wang, Y. (2018). Learning from outsiders: Do managers benefit from
communication with market participants? Finance Research Letters, 26, 192-197.
Martinez-Aires, M. D., Lopez-Alonso, M., & Martinez-Rojas, M. (2018). Building information
modeling and safety management: A systematic review. Safety science, 101, 11-18.
Neves, J., Sampaio, Z., & Vilela, M. (2019). A Case Study of BIM Implementation in Rail Track
Rehabilitation. Infrastructures, 4(1), 8.
Olawumi, T. O., & Chan, D. W. (2019). Development of a benchmarking model for BIM
implementation in developing countries. Benchmarking: An International Journal.
Saieg, P., Sotelino, E. D., Nascimento, D., & Caiado, R. G. G. (2018). Interactions of building
information modeling, lean and sustainability on the architectural, engineering and
construction industry: a systematic review. Journal of Cleaner Production, 174, 788-806.
Tonchia, S., Tonchia, & Mahagaonkar. (2018). Industrial project management. Springer.
1 out of 5

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.