This report examines the role of Building Information Modeling (BIM) in addressing key challenges within the construction industry, focusing on improving project schedules and cost certainty, enhancing construction site safety and logistics, and promoting sustainability through waste reduction. It highlights how BIM facilitates better planning, collaboration, and visualization, leading to more efficient and cost-effective project management. The report discusses the integration of BIM with various construction processes, such as scheduling, budgeting, and logistics management, emphasizing the importance of early involvement of construction professionals and project synchronization among participants. Furthermore, it underscores the benefits of using BIM to improve site safety, enhance understanding of logistical information, and reduce waste, ultimately contributing to more sustainable and environmentally responsible construction practices. The analysis also points out the need for increased BIM software training for construction workers to fully leverage its capabilities and meet governmental goals for the construction sector. Desklib provides a platform to access this and other solved assignments for students.
Document Page
Individual Written
Report Component B
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
EXECUTIVE SUMMARY
Document Page
Document Page
Contents
EXECUTIVE SUMMARY.................................................................................................................................2
INTRODUCTION...........................................................................................................................................4
MAIN BODY.................................................................................................................................................4
Improving project schedules and cost certainty......................................................................................4
Enhance construction site including safety logistic.................................................................................5
Sustainability in construction and reduction of waste.............................................................................8
CONCLUSION.............................................................................................................................................10
REFERENCES..............................................................................................................................................11
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
INTRODUCTION
A comprehensive, integrated, information-rich architectural model may boost the efficiency of
current building projects while also introducing new contribute to success and manufacturing
processes. BIM systems are gradually influencing and, to some level, revolutionising all aspects
of building works, from more dependable and reactive layouts to bidding and budgeting, and also
assessing project outcomes. The BIM working with people may be defined as the characteristics
of several construction stages for a specific project. Additional aspect of this concept is an
awareness of the way of collaboration knowledge / analysis between building phases. In this
report examine BIM enable solutions to identify the challenges in construction industry and
exploring innovation approaches. In this project report selected three topics which are related to
construction stages these are, Improving project schedules and cost certainty, sustainability in
construction and the reduction of waste and enhance construction site including safety logistics.
MAIN BODY
Improving project schedules and cost certainty
The practice of identifying tasks, events and objectives with a predetermined beginning
and completion date is known as programming in building projects. The significance of planning
in building projects cannot be overstated, since it is critical to the project's success. A excellent
project schedule demonstrates how the project is progressing in relation to the original concept.
The key work flows and essential route, as well as intermediate objectives for monitoring
performance, should all be included. As a result, facts are the bedrock of a successful report card.
There is a building timeline for every building. The timetable not only defines how soon the task
will be completed, but also how it will be completed. One specific goal is to reduce project
length, i.e., to create a timetable that results in the lowest total project expense. The production
time curved (or smashing curve), consisting includes of focus on minimizing construction cost
values throughout the range of feasible project durations, is one part of this Endeavour. Due to
pricey software, several systems, and an inadequate training, the building companies have
historically been hesitant to use technology. The business has been obliged to embrace services
and innovation that enable operations to survive regardless new rules as the epidemic has
accelerated efficiency and innovation and distant labor. Construction managers may now
Document Page
cooperate from remote places thanks to services varying from planning to plant monitoring
programmers.
BIM is becoming more prevalent in the minds of construction professionals. BIM is
described as a more connected design of the project that produces higher-quality buildings at
cheaper costs and shorter project timelines. It was suggested that the following basic definition
be used: BIM is a design and construction enabler. The relevance of modeling in building
projects was discussed. To generate great project planning and achieve superior site
management, various models were applied. An integrated system that allows for the rapid
development of project schedules and budgets in connection to layout would result in a high
degree of technology in building design and control. It was discovered that BIM saves money by
reducing demands for documentation and modification orders, resulting in a higher rate of return
and revenue. A visualised time-control model is the use of a time-cost unified timetable for
building projects under BIM restrictions. A broad definition may be added to that model by
including an unit cost of production. According to the researchers, BIM alone would not
sufficient to improve building projects; early participation of a building professional and project
synchronization among participants will guarantee that the project's financial and scheduling
requirements are achieved when construction begins. Furthermore, the techniques indicated
above are primarily employed for producing modelling techniques as during designing phase.
BIM models would benefit infrastructure projects if they were employed throughout the building
project as well. The ITCMS is thought to be advantageous to construction companies; the
usefulness and dependability of the established model have been demonstrated through the use of
a real-world case study. If used correctly, its budgeting and schedule development framework, in
combination with BIM approaches and methodologies, will increase construction labor
productivity, buildability, and overall quality.
Enhance construction site including safety logistic
Effective construction project management from concept to implementation in a reasonable
timeframe while taking into account the project's multiple constraints necessitates the skillful
incorporation of several building elements. Logistics management is another one of those factors
that is critical to the effective execution of a building project. The administration of the
movement of information, labor, and technology (and any connected object) first from point of
Document Page
disposal to the site of use or deployment" is what construction logistics management is all about.
As a result, pulling together again and integrating the administration of this necessary part
among the project's major participants would significantly boost efficiency. This element must
be appropriately controlled while on the building site in ensuring the success of a development.
Building logistics management on building sites grows increasingly complicated as project
demand rises, making it incredibly expensive in underdeveloped nations despite technology
advances. For the seamless operation of a construction area, particularly in terms of the
movement or flow of materials and components, attention must be given to cope with spatial and
temporal constraints among material storage and transport and building's energy activities. The
length of the vehicles for transporting and resource circulation pathways required for the
structure's growth must be considered during the design and assembly of continuous construction
elements. Throughout each stage of the project, this must be integrated with account of the
placement, form, and scale of permanent and transient infrastructure.
BIM software may be used to gaining significant logistics in a range of methods. Complex
logistical methods may now be expressed swiftly and effectively using 3D tools. With the
introduction of temporal information as a series of 4D BIM, it is now possible to efficiently
control the management and control of both open area for item storage and transmission, as well
as the organization of equipment assembly and disassembly. The following paragraphs provide
an overview of certain uses. There are significant advantages to using BIM systems for building
logistics management, as mentioned in the previous step. Such advantages are as chooses to
follow:
Improvement of site safety: An increased comprehension of logistical information enhances
health and safety on the building site. The use of a 3D model for supply chain planning improves
knowledge of planned logistical procedures, permitting hazardous situations that may be hard to
discover using 2D information to be promptly identified. Additionally, site operations may be
informed rapidly with very well and understandable material. This lowers the frequency of
aspects of the logistics system that are vulnerable to understanding, lowering the risks involved
with extreme interpretation.
Improved understanding of logistic information: The display of logistical information on a tri
processing stages accuracy which is not possible with only two-dimensional data. This has the
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
advantage of better understanding of facility layout information, permitting complicated logistics
procedures to be more simply comprehended by those who do not have a building or logistical
experience. Improving the simplicity with which suggested logistical strategies may be read
minimizes the work required to discover both concerns and possibilities connected with
infrastructure plans.
Increasing BIM usage will bring the UK construction sector nearer to meeting governmental
specific goals; although, much more might be done to speed this progress. Advancement of this
development may be accomplished by increased usage of construction project management
styles bolstered by BIM-based technologies and employment methods. It can be accomplished in
effect by instituting a strategy of BIM software instruction for location construction project
workers. Growing competency with BIM software applications will inspire more maintaining
regular use of the 4D models which have already been generated for several infrastructure
projects; one such improvement of site command and collaboration will then nourish into more
efficacious, productive, and secure logistics activities.
For the seamless operation of a construction area, particularly in terms of the mobility or
flow of materials and components, attention must be given to cope with spatial and temporal
constraints among material transportation and storage and building's energy activities. The length
of the vehicles for transporting and resource circulation pathways required for the structure's
growth must be considered during the design and assembly of continuous construction elements.
Throughout each stage of the project, this must be integrated with account of the placement,
form, and scale of permanent and transient infrastructure. A well-planned calendar of project
phases, as well as a complete inventory of supplies and tools necessary, is an important aspect of
logistics activities. Because of the application's sophistication and the interplay of several supply
streams, specialist modeling techniques can be used to simulate, evaluate, evaluate, and enhance
logistical.
Despite keeping the building timetable on track, other benefits of effective logistics
administration encompass:
1. Discounts and deprive as production increases.
Document Page
2. On-site logistics planning allows items to be kept appropriately, increasing productivity
and lowering the risk of harm.
3. Websites may be maintained secure, tidy and easy navigation.
4. Items may be collected and processed quickly.
Sustainability in construction and reduction of waste
Construction may be a time-consuming and inefficient operation. Building information
modelling (BIM) addresses this by developing a strong, approachable modeling and providing
access to anybody who requires it. Effective waste management seeks to maintain resources used
for as long as feasible while reducing the volume of solid waste disposing of in landfills or
incinerated. Nowadays, waste is a serious challenge in the building and engineering industries,
with cemeteries practically flowing worldwide. It's favorite pastime to priorities recovery
options, recovering or reusing items, pollution prevention, and trash removal. Sustainable
construction entails employing recycling and regenerative resources in infrastructure projects
while reducing energy and trash creation. The main aim of sustainable building projects is to
reduce its environmental footprint. In reality, constructing sustainably entails existing in
accordance with the environment ecosystem, taking into account the social, ecological, and
economic consequences of actions, and lowering our carbon footprint by adopting a less power,
resource, and materials heavy living. Effective waste management seeks to maintain resources
that are used for as long as feasible while reducing the amount of solid wastes disposing of in
landfills or incinerated.
Notwithstanding, waste needs to begin well before items are produced in our current
planned economy, and a more comprehensive objective of sustainable waste disposal must
concentrate on the a whole lifecycle of products to aid reduce the harmful, cultural, and customs
revenue of 21st-century usage. Sustainable construction should not cease when the structure is
finished; the structure actually must have a lower environmental effect during its lifetime. This
indicates that the structure of the hotel should include components that have a long-term positive
effect on the structure's ecological consequences. Such can also include appropriate protection to
avoid heat transfer, solar energy to minimize energy usage, and long-lasting construction
materials.
Document Page
When it comes to new constructions, sustainable construction implies employing
biodegradable and sustainable resources while also lowering energy usage and trash. The main
purpose of green architecture is to lessen the company's environmental effect.
Sustainable construction should not cease whenever the building is finished; the structure must
have a lower environmental effect during its lifetime. This means that features in the
construction project should have a long-term positive effect on the structure's ecological
consequences. Interior temperatures to avoid heat transfer, solar panels to massively reduce use,
and long-lasting building supplies are just a few examples.
The need of using Building Information Modeling (BIM) to reduce Waste materials (CDW)
is widely acknowledged, however most CDW control methods currently available lack BIM
capabilities. BIM is an emerging technology that is widely utilised to improve design, building,
and service efficiencies across the whole lifetime. BIM is not commonly used for demolition or
destruction, because BIM models do not take into account structural equipments. BIM is built on
this double designs or ideas, which may or may not be correctly translated into three-dimensional
BIM models. Furthermore, earlier studies have mostly devoted to the development of building
trash. There are just a few research on demolition waste disposal that concentrate on destruction.
To close this gap, the goal of this article is to establish a platform that combines a based on a 3d
model with BIM in order to increase BIM correctness and, as a result, produce a demolition
waste collection system for improving destruction productivity, efficient recovery, and cost
reductions. The produced as-built BIM will be analyzed to recognize and quantify waste for
recycling, and to also design a recycling process model.
BIM is a method for combining and organizing all data related to a project's life cycle,
which involves assessment, designing, construction, administration, and demolition. BIM not
only offers a collection of interconnected and bridge data, but it also generates a 3 dimensional
experience from a 2d representation and combines time as 4D and prices as 5D data to aid
management choices for diverse participants and demands. BIM has been shown to help with
budgeting, timing, efficiency, project length decrease, and wast of time expenses and resources
in construction works. It is argued that waste might be reduced by utilising BIM tools to design-
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
out waste. The usage of a rebuilt 3D model and BIM is the way for constructing demolition
waste disposal. The Reconstructed model is used to create a comprehensive 3D simulation is the
process structures based only on data acquired by instruments like camera photos. The goal of
incorporating a rebuilt 3D model into the administration program is to enhance BIM correctness
and presentation of data. That is, the rebuilt 3D model can depict the types of building
components and their positions, as well as the relationships between the building supplies.
Current building demolition entails a number of steps. Authentic building delivery blueprints of
older structures are sometimes destroyed, making demolition activities challenging.
CONCLUSION
BIM technology enables this control from start to finish, allowing for automated amount
reporting and evaluation anywhere at stage of the construction process. It also enables a more
exact cost estimation for building operations, that can be examined and controlled in genuine 3D.
During the building phase, the BIM model may be utilised as an association encourages and to
automating the building project in a growing number of scenarios, including when ground
moving trucks are independently "directed" by technology to attain the needed elevations.
Building Information Modeling (BIM) is an acronym for Building Information. The fundamental
benefit of BIM is the manner it organises material from many relevant stakeholders,
encompassing geometry, surroundings, location, elements, spatial linkages, costs, and so on. This
technique improves the efficiency of projects and infrastructure planning, planning, architecture,
and management, and has become a major idea in the building company's technological age, as
well as having a significant influence on sustainability.
Document Page
REFERENCES
Books and Journal
Matějka, P. and Tomek, A., 2017. Ontology of BIM in a construction project life cycle. Procedia
engineering. 196. pp.1080-1087.
Axel, E., 2020. Distributing resources in a construction project: Conflictual co-operation about a
common cause and its theoretical implications. Theory & Psychology. 30(3). pp.329-348.
Arnholtz, J. and Refslund, B., 2019. Active enactment and virtuous circles of employment
relations: how Danish unions organised the transnationalised Copenhagen Metro
construction project. Work, Employment and Society. 33(4). pp.682-699.
Wang, D., Li, K. and Fang, S., 2018. Analyzing the factors influencing trust in a construction
project: evidence from a Sino-German eco-park in China. Journal of Civil Engineering
and Management. 24(4). pp.331-343.
Sparkling, A. E., Mollaoglu, S. and Kirca, A., 2017. Research synthesis connecting trends in
architecture, engineering, and construction project partnering. Journal of Management in
Engineering. 33(1). p.04016033.
Samaraweera, A., Senaratne, S. and Sandanayake, Y. G., 2018. Nature of construction project
cultures in the public sector: case studies in Sri Lanka. Built Environment Project and
Asset Management.
Lee, J. W., 2021. A thin line between a sport mega-event and a mega-construction project: The
2018 Winter Olympic Games in PyeongChang and its event-led development. Managing
Sport and Leisure. 26(5). pp.395-412.
Suwal, S. and Singh, V., 2018. Assessing students’ sentiments towards the use of a Building
Information Modelling (BIM) learning platform in a construction project management
course. European Journal of Engineering Education. 43(4). pp.492-506.
Guo, S. J., Chen, J. H. and Chiu, C. H., 2017. Fuzzy duration forecast model for wind turbine
construction project subject to the impact of wind uncertainty. Automation in
Construction. 81. pp.401-410.
Innocent, M., Wasek, J. S. and Franz, A., 2018. Predicting military construction project time
outcomes using data analytics. Engineering Management Journal. 30(4). pp.232-246.