This assignment is a comprehensive case study analysis of the Blue Spider Project, focusing on the critical aspects of change control within project management. The analysis delves into various challenges encountered during the project, including inadequate project kickoff, unethical proposal practices, and behavioral issues within the management team. The core of the analysis centers on identifying failures in cost, scope, time, and quality management. The case study underscores the importance of adopting formal project management methodologies, involving experienced project managers and teams, aligning projects with company strategies, and fostering regular communication with stakeholders, such as Lord’s Industries. The assignment also includes a change request form to propose solutions to the identified problems, highlighting how these changes can improve project outcomes and ensure better quality, time management, and cost control.
Document Page
Running head: CHANGE CONTROL
CHANGE CONTROL
Enter the name of the Student:
Enter the name of the University:
Author note:
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1CHANGE CONTROL
Table of Contents
1. Introduction............................................................................................................................2
2. Discussion..............................................................................................................................2
3. Conclusion..............................................................................................................................8
4. References..............................................................................................................................9
Document Page
2CHANGE CONTROL
1. Introduction
Parks Corporation is an enterprise which dedicated mostly on the R&D business,
undertaking the projects for the Defence Department. It is altered their attention over many
years from for most part of the business of R&D to the facility of low-cost production
(Badewi, 2016). The downturn caused in this company reducing the number of staffs and the
staff commendation going from the number of 6700 to the number of 2200. In the year 1975,
the business strategy altered yet again with the improvement of the DoD spending. This
company then created to upgrade their engineering staff of the R&D.
2. Discussion
In the year 1978 from the month of January, the Parks Corporation took the decision
to deal for the Phase I on this Blue Spider Project with the Lord Industries for instance major
contractor for this Spartan Program of Army (Butt, Naaranoja & Savolainen, 2016). This
project was to improve mechanical abilities also age life of this small series tactical missile
that was showing fatigue disaster afterward 6 years in this arena. This conditions for
subcontractor was not any low suggestion only, but also the technical proficiency and the
performance of management. This Parks Corporation manipulated that they had the different
benefit over the maximum challengers, such as they had functioned on additional effective
projects for the Lord Industries.
From starting of this project, there are many difficulties noticed which are a s follows:
i) The project kick off which was happened casually also deprived of exact guidelines.
ii) Proposal of this project was won unethically by not revealing the truth (Donovan, 2018).
iii) The management of this company is considered for having the behavioural problems.
iv) The process of the operation required to improve.
Document Page
3CHANGE CONTROL
v) The architecture or the relations of this organization required to be clearly described also
monitored.
vi) The knowledge of the project management is not used such as Cost Management, Scope
Management, Quality Management and Time Management.
For these problem, there are many changes are required to achieve success in this
Blue Spider Project which are as follows:
i) Need to follow the formal methodology of project management.
ii) A knowledgeable project manager need to be involved in this project with the programme
manager also the functional management needs to follow each step of this manner (Gaber,
Mazen & Hassanein, 2016).
iii) A experienced team of this project with sufficient resources needs to add in this project.
iv) The project needs to align to the strategy of the company with the proper priority al over
this project.
v) The customer that is the Lord’s Industries are required to involve on a regular basis and
consulted with the company.
vi) The communication all over the project, measurement, feedback, appropriate monitoring
and take the review of the deliverables need to apply.
From the case study of this Blue Spider Project, it is noticed that there are another
many problems situated which needs to be changed. These problems and the required change
are discussed below:
i) Cost of the project
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4CHANGE CONTROL
In this project, selected project manager did not manage the cost for this project. By not
following the appropriate process of project management, it was affect the cost of this
project.
The utmost significant parts of a project manager is to achieve the cost of project that
is known as the cost management. There are some process of this cost management that are
estimating the cost, the budgeting of cost and control of this cost. The consistent response to
the sponsor of this project also project office would be suitable to determine where this
project is with respect to planned totals against real cost amounts (Heagney, 2016). Owing to
the communication also controlling the project also the wasted work, the cost had to escalate
pointlessly. The project manager of this project had predicted the profit whenever there was a
big loss.
ii) Scope of project
The project manager of this project did not follow this scope management for this project of
Blue Spider (Klakegg, 2016). The manager change the scope of the work to prepare the trade-
off analysis to watch the things that can delete downstream to control the budget.
To gain the success, this project needs an appropriate definition of the project
requirement that consists of the project scope (Perrotta et al., 2017). Also project manager
needs to do the verification of the scope also control the scope after appropriate testing. The
plan of scope management consists the scope planning, execution and control. This scope
management is made as the part of Define plan process of the Project Management and is not
involved as the distinct process of the scope management (Pheng, 2018). This company
should have the templates, forms, or the standards for scope management. These situations
are critical for any type of project. The plan of scope management may have the topics which
can standardize for this organization, so each scope management plan is exclusive (Pollack,
Document Page
5CHANGE CONTROL
2016). The project manager practices the plan of scope management as the baseline to guide
also measure this project up to closing of this project.
iii) Time of the Project
It have been seen that there have been absence of project management. Hence the tasks
which are to be executed by the project managers are not performed. One of the main job
prospect of a project manager is to perform time scheduling. The project manager takes into
consideration the knowledge of a project planner in order to start the operational process
(Pollack, 2017). This section ensures that a dual effort that is provided by the project manager
also this project planner helps in proper development of the time that will be required by each
of the activity sets. Hence by estimating the activities that are to be performed in the project
will be performed. After the project manager is included in the project, the issue of time
management will be getting eliminated (Sanghera, 2019). This elimination will be ensuring
that the time management issue will be getting eliminated. Another aspect that is to be
considered is that the deadline of the tasks are considered to be one of the major aspect that
details the achievement of this project. In the event the deadline of the project is not met, the
failure of the project is obvious. Hence with recruiting a project manager time related issues
might be getting eliminated.
iv) Quality of the project
Quality of the product is also one of the major aspect that is to be considered. It can be
realized that the separate project management section is present that ensures that the quality
of the product is maintained. In case the quality of the product is not maintained, the main
issue that is to be considered in the process is that the entire acceptance of the product or
services will be getting lower (Sellami et al., 2018). With recruiting a project managing team,
a separate stakeholder will be present who will be taking care of the quality of the product or
Document Page
6CHANGE CONTROL
the services. It is seen that the deliverables that have been provided in the initial stage will be
considered and hence wise comparison will be made. After the quality manager checks the
quality test it is again rechecked by the project manager. Hence double quality check is
performed. Hence quality of the product and service can be managed.
Change Request Form:
This Change Request Form is one of the leading tool of project management that is
used for wishing any alterations to the exact project also are one part of the process of change
management (Trad & Kalpić, 2019). All the project managers need to accomplish the change
cautiously also execute a detailed change control procedure to confirm remaining of the
project deprived of their accepted constraints. Some of the projects have numerous
stakeholders with changeable levels of attention in this project also change is the unavoidable
part of the lifecycle of any project.
Change Request
Project: Blue Spider Project Date:
Change Requestor: Change No: 1
Change Category (Check all that apply):
Schedule Cost Scope Requirements/Deliverables
Testing/Quality Resources
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7CHANGE CONTROL
Does this Change Affect (Check all that apply):
Corrective Action Preventative Action Defect Repair Updates
Other
Define the Change Being Requested:
Recruiting project manager will be the change
Define the Reason for the Change:
Improper time scheduling and objective definition
Define all Alternatives Considered:
Alternatives: usage of online project management tools
Define any Technical Changes Required to Execute this Change:
Usage of online tools will be made which will be bettering the working process and increase its
efficiency
Describe Risks to be Considered for this Change:
Excess cost
Extra time might be required as project to get completed due to improper planning
Describe the Implications to Quality:
Bettering of the product quality and increased efficiency in completion of the project due to better
quality management and time management
Document Page
8CHANGE CONTROL
Disposition:
Approve Reject Defer
Justification of Approval, Rejection, or Deferral:
Project manager will be bringing in a structure in the project completion process. Efficiency in the
working process will increase along with better time management.
3. Conclusion
From the above project, it can be concluded that the Blue Spider project is faced the
failure. For this reason some changes are need to do in this project to achieve the success. So
the change form is filled up and make a change in this project.
Document Page
9CHANGE CONTROL
4. References
Badewi, A. (2016). The impact of project management (PM) and benefits management (BM)
practices on project success: Towards developing a project benefits governance
framework. International Journal of Project Management, 34(4), 761-778.
Butt, A., Naaranoja, M., & Savolainen, J. (2016). Project change stakeholder
communication. International Journal of Project Management, 34(8), 1579-1595.
Donovan, G. O. (2018). Creating a culture of partnership between Project Management and
Change Management. Project Management World Journal, 7(1), 1-11.
Gaber, A. M., Mazen, S., & Hassanein, E. E. (2016). Comparative Study for Software Project
Management Approaches and Change Management in the Project Monitoring &
Controlling. International Journal of Advanced Computer Science and
Applications, 7, 259-264.
Heagney, J. (2016). Fundamentals of project management. Amacom.
Klakegg, O. J. (2016). Project risk management: Challenge established practice.
Perrotta, D., Faria, J., Araájo, M., Tereso, A., & Fernandes, G. (2017, December). Project
change request: A proposal for managing change in industrialization projects. In 2017
IEEE International Conference on Industrial Engineering and Engineering
Management (IEEM) (pp. 1525-1529). IEEE.
Pheng, L. S. (2018). Project Integration Management. In Project Management for the Built
Environment (pp. 47-61). Springer, Singapore.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10CHANGE CONTROL
Pollack, J. (2016, December). The need for integration between organizational project
management and change management. In 2016 IEEE International Conference on
Industrial Engineering and Engineering Management (IEEM) (pp. 1245-1249). IEEE.
Pollack, J. (2017). Change Management as an Organizational and Project
Capability. Cambridge Handbook οf Organizational Project Management,
Cambridge University Press, Cambridge, 236-249.
Sanghera, P. (2019). Project Communication Management. In CAPM® in Depth (pp. 343-
377). Apress, Berkeley, CA.
Sellami, A., Haoues, M., Borchani, N., & Bouassida, N. (2018, July). Guiding the Functional
Change Decisions in Agile Project: An Empirical Evaluation. In International
Conference on Software Technologies (pp. 327-348). Springer, Cham.
Trad, A., & Kalpić, D. (2019). The Business Transformation Framework, Agile Project and
Change Management. In Advanced Methodologies and Technologies in Business
Operations and Management (pp. 212-229). IGI Global.