Business Project Management: Bosideng Company Expansion into Japan
VerifiedAdded on 2025/04/30
|22
|1273
|184
AI Summary
Desklib provides past papers and solved assignments for students. This report analyzes Bosideng's expansion into Japan.

Managing a Successful Business Project
1
1
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Executive Summary
In the given report, the impact of the Bosideng Company in China has been analysed.
The aim, scope, and objectives of the projects have been discussed. The study further
discusses the ways in which the risks in managing this project will be mitigated in order
to meet the set aims and objectives.
2
In the given report, the impact of the Bosideng Company in China has been analysed.
The aim, scope, and objectives of the projects have been discussed. The study further
discusses the ways in which the risks in managing this project will be mitigated in order
to meet the set aims and objectives.
2

Table of Contents
Introduction...................................................................................................................... 4
LO1.................................................................................................................................. 5
Reference List................................................................................................................ 12
Appendix........................................................................................................................ 13
3
Introduction...................................................................................................................... 4
LO1.................................................................................................................................. 5
Reference List................................................................................................................ 12
Appendix........................................................................................................................ 13
3
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Introduction
In the given study, research has been conducted of the Bosideng Company, China.
The objective and aim of the company have been discussed. A project management
plan has been produced that covers the aspect of time, scope, cost, risk,
communication, resources, and quality. The impact of the company on the host
company, Japan has been discussed. A Gantt chart and work breakdown structure
have been produced to provide stages and timeframe of completion of the project.
Bosideng Company is a publicly traded company that falls in the retailing sector. The
company was founded in the year 1975. It trades clothing in the “People’s Republic of
China”. Mr Gao Dekang is the chairperson of the company. It has a headquartered in
Shanghai. The core brands of the company are “Snow Flying”, “Bosideng’, “Kangbo”,
“Shuangyu”, “Shangyu”, and “Bengen’.
The host country for the expansion of this company is Japan. The GDP per capital of
the country is higher than China. Japan is also called the “Land of the Rising Sun”.
Tokyo is the capital of the country.
4
In the given study, research has been conducted of the Bosideng Company, China.
The objective and aim of the company have been discussed. A project management
plan has been produced that covers the aspect of time, scope, cost, risk,
communication, resources, and quality. The impact of the company on the host
company, Japan has been discussed. A Gantt chart and work breakdown structure
have been produced to provide stages and timeframe of completion of the project.
Bosideng Company is a publicly traded company that falls in the retailing sector. The
company was founded in the year 1975. It trades clothing in the “People’s Republic of
China”. Mr Gao Dekang is the chairperson of the company. It has a headquartered in
Shanghai. The core brands of the company are “Snow Flying”, “Bosideng’, “Kangbo”,
“Shuangyu”, “Shangyu”, and “Bengen’.
The host country for the expansion of this company is Japan. The GDP per capital of
the country is higher than China. Japan is also called the “Land of the Rising Sun”.
Tokyo is the capital of the country.
4
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

LO1
Introduction
In this part of the project, a management plan shall be produced in addition to a Gantt
chart and work breakdown structure. A project is a collaborative or an individual
enterprise, which is planned to attain a specific goal. Project management is the
exercise of planning, initiating, controlling, executing, and completing the project to
attain particular objectives and get success at a particular time (Kerzner and Kerzner,
2017). In this project, the impact of the company on the host country would be
discussed.
Devise project aims and objectives for a chosen scenario.
Title: The impact of Bosideng Company upon the environment, society and economy
of Japan
Aim
To identify and analyse the impact of Bosideng Company upon the environment,
society and economy of Japan
Objectives
To identify the impact of Bosideng Company on the environment of Japan
To assess the effect of Bosideng Company on the economy of the country
To evaluate the influence of Bosideng Company on the social factors of the
country
To propose an appropriate suggestion and recommendation for future
improvement of the business in the host country
Produce a project management plan that covers aspects of cost, scope, time,
quality, communication, risk and resources.
Scope: A planning of the project that comprises the functions, deliverables, features,
and such things are called the scope of the project. The report would inform the
5
Introduction
In this part of the project, a management plan shall be produced in addition to a Gantt
chart and work breakdown structure. A project is a collaborative or an individual
enterprise, which is planned to attain a specific goal. Project management is the
exercise of planning, initiating, controlling, executing, and completing the project to
attain particular objectives and get success at a particular time (Kerzner and Kerzner,
2017). In this project, the impact of the company on the host country would be
discussed.
Devise project aims and objectives for a chosen scenario.
Title: The impact of Bosideng Company upon the environment, society and economy
of Japan
Aim
To identify and analyse the impact of Bosideng Company upon the environment,
society and economy of Japan
Objectives
To identify the impact of Bosideng Company on the environment of Japan
To assess the effect of Bosideng Company on the economy of the country
To evaluate the influence of Bosideng Company on the social factors of the
country
To propose an appropriate suggestion and recommendation for future
improvement of the business in the host country
Produce a project management plan that covers aspects of cost, scope, time,
quality, communication, risk and resources.
Scope: A planning of the project that comprises the functions, deliverables, features,
and such things are called the scope of the project. The report would inform the
5

research that is going to be made for the expansion of the company. The project is
necessary to depict the impacts of the business expansion of Bosideng Company in the
host country, Japan. The time that is required to finish the project is around one year.
Included Scope: The data that is gathered concerning the positive, as well as the
negative impact of the expansion of business through direct or primary methods, are
included in this project. In this project, the aim is to gain knowledge of the impact of the
company on the host country.
Excluded Scope: The information that is gathered from the secondary or indirect
methods will be excluded from this project.
Organisational Structure: The functional structure is appropriate for this project. This
organisational structure would allow the team members to work on various projects at
the same time. The technical proficiency is sustained in the area of function (Channon
and Jalland, 2016). The specialised experts of functional area generate synergistic
elucidations to the technical problems of the project.
Cost:
Activity Expenditures £
Researching through a survey of the
people
80
Analysis and data collection 120
Workforce 170
Use of technology 70
Other expenses 160
Total=£ 600
Table1: Consideration of cost
(Source: Created by the learner)
Resource: The project requires workforce, appropriate materials, and equipment,
information of the host country where the expansion is going to be made. The project
would need finance for the implementation of the project.
6
necessary to depict the impacts of the business expansion of Bosideng Company in the
host country, Japan. The time that is required to finish the project is around one year.
Included Scope: The data that is gathered concerning the positive, as well as the
negative impact of the expansion of business through direct or primary methods, are
included in this project. In this project, the aim is to gain knowledge of the impact of the
company on the host country.
Excluded Scope: The information that is gathered from the secondary or indirect
methods will be excluded from this project.
Organisational Structure: The functional structure is appropriate for this project. This
organisational structure would allow the team members to work on various projects at
the same time. The technical proficiency is sustained in the area of function (Channon
and Jalland, 2016). The specialised experts of functional area generate synergistic
elucidations to the technical problems of the project.
Cost:
Activity Expenditures £
Researching through a survey of the
people
80
Analysis and data collection 120
Workforce 170
Use of technology 70
Other expenses 160
Total=£ 600
Table1: Consideration of cost
(Source: Created by the learner)
Resource: The project requires workforce, appropriate materials, and equipment,
information of the host country where the expansion is going to be made. The project
would need finance for the implementation of the project.
6
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Quality: A high quality will be maintained in the process of implementing the project.
Legislations would be considered as well as a strategical procedure would be applied
for the success of the project.
Communication Matrix:
What Who Why How When
Aims and
Objectives
Owner of the
Bosideng
Company
For the
development of
the goals of the
project
Through
conducting
research
During the
development of
the plan of the
project
Analysis and
Gathering of
data
The project’s
members
For attaining
practicable
information and
assessing them
Through
surveying the
primary data
During the
implementation
of the survey
Selecting
appropriate
methods
Members of the
project
For conducting
research
Through
communicating
with team
members
Before
conducting the
research
Proper and
reasonable
solutions
Owner of the
Bosideng
Company
For mitigating
the negative
impact of the
expansion
Through
discussing the
negative factors
and develop
ideas to solve
the problems
After surveying
the impacts of
expansion in
the host
country
Table 2: Communication matrix
(Source: Created by the learner)
Risk Register and Control Techniques
Number Different
risks
Occurrence
prediction
Level of
impact
Results Control
techniques
1 Incidents of Medium High If the The team
7
Legislations would be considered as well as a strategical procedure would be applied
for the success of the project.
Communication Matrix:
What Who Why How When
Aims and
Objectives
Owner of the
Bosideng
Company
For the
development of
the goals of the
project
Through
conducting
research
During the
development of
the plan of the
project
Analysis and
Gathering of
data
The project’s
members
For attaining
practicable
information and
assessing them
Through
surveying the
primary data
During the
implementation
of the survey
Selecting
appropriate
methods
Members of the
project
For conducting
research
Through
communicating
with team
members
Before
conducting the
research
Proper and
reasonable
solutions
Owner of the
Bosideng
Company
For mitigating
the negative
impact of the
expansion
Through
discussing the
negative factors
and develop
ideas to solve
the problems
After surveying
the impacts of
expansion in
the host
country
Table 2: Communication matrix
(Source: Created by the learner)
Risk Register and Control Techniques
Number Different
risks
Occurrence
prediction
Level of
impact
Results Control
techniques
1 Incidents of Medium High If the The team
7
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

accidents accidents
occur to any
members of
the team,
there would
be a delay of
the project
as well as
there could
be chances
of clashes in
the
organisation.
members
should be
careful while
surveying in
a different
nation.
2 Improper
management
of the
monetary
resources
High High The
improper
managemen
t of
resources
would lead
to delaying
in the
continuation
of the
research as
well as the
survey
would not be
effective.
Financial
consideration
should be
one of the
priorities of
the manager
of the
company to
avoid
excessive
expenditures
during the
survey.
3 Impracticable
or unrealistic
information
High High The false
information
would hinder
The survey
should be
conducted
8
occur to any
members of
the team,
there would
be a delay of
the project
as well as
there could
be chances
of clashes in
the
organisation.
members
should be
careful while
surveying in
a different
nation.
2 Improper
management
of the
monetary
resources
High High The
improper
managemen
t of
resources
would lead
to delaying
in the
continuation
of the
research as
well as the
survey
would not be
effective.
Financial
consideration
should be
one of the
priorities of
the manager
of the
company to
avoid
excessive
expenditures
during the
survey.
3 Impracticable
or unrealistic
information
High High The false
information
would hinder
The survey
should be
conducted
8

the project.
Solutions
would not be
made
without
proper
knowledge
of problem
areas.
thoroughly
by
segmenting
the targeted
people and
areas of the
survey.
4 Incorrect
assessment
of the
information
Low Medium The
improper
assessment
would be
harmful to
the
development
of the
business in
the
expansion
area.
Proper
assessment
is necessary
for handling
the problems
through
appropriate
solutions.
Table 3: Risk register and control techniques
(Source: Created by the learner)
Produce a work breakdown structure and a Gantt chart to provide timeframes and
stages for completion.
9
Solutions
would not be
made
without
proper
knowledge
of problem
areas.
thoroughly
by
segmenting
the targeted
people and
areas of the
survey.
4 Incorrect
assessment
of the
information
Low Medium The
improper
assessment
would be
harmful to
the
development
of the
business in
the
expansion
area.
Proper
assessment
is necessary
for handling
the problems
through
appropriate
solutions.
Table 3: Risk register and control techniques
(Source: Created by the learner)
Produce a work breakdown structure and a Gantt chart to provide timeframes and
stages for completion.
9
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Work Breakdown Structure
Activities
Start
Date
Duratio
n
End
Date
Determining the project topic 5/1/2019 3 5/4/2019
Designing appropriate aim and objectives 5/4/2019 2 5/6/2019
Review of Literature 5/6/2019 8
5/14/201
9
Choosing appropriate methodology
5/14/201
9 2
5/16/201
9
Carrying out survey
5/16/201
9 15
5/31/201
9
Analysing the collected data
5/31/201
9 5 6/5/2019
Concluding the results and summarising
recommendations 6/5/2019 1 6/6/2019
Documentation and Submission 6/6/2019 1 6/7/2019
Table 4: Work breakdown Structure
(Source: Created by the learner)
Gantt Chart
Determining the project topic
Designing appropriate aim and objectives
Review of Literature
Choosing appropriate methododlogy
Carrying out survey
Analysisng the collected data
Concluding the results and summerising
reccomendations
Documentation and Submission
5/1 5/6 5/11 5/16 5/21 5/26 5/31 6/5 6/10
Figure 1: Gantt Chart
(Source: Created by the learner)
10
Activities
Start
Date
Duratio
n
End
Date
Determining the project topic 5/1/2019 3 5/4/2019
Designing appropriate aim and objectives 5/4/2019 2 5/6/2019
Review of Literature 5/6/2019 8
5/14/201
9
Choosing appropriate methodology
5/14/201
9 2
5/16/201
9
Carrying out survey
5/16/201
9 15
5/31/201
9
Analysing the collected data
5/31/201
9 5 6/5/2019
Concluding the results and summarising
recommendations 6/5/2019 1 6/6/2019
Documentation and Submission 6/6/2019 1 6/7/2019
Table 4: Work breakdown Structure
(Source: Created by the learner)
Gantt Chart
Determining the project topic
Designing appropriate aim and objectives
Review of Literature
Choosing appropriate methododlogy
Carrying out survey
Analysisng the collected data
Concluding the results and summerising
reccomendations
Documentation and Submission
5/1 5/6 5/11 5/16 5/21 5/26 5/31 6/5 6/10
Figure 1: Gantt Chart
(Source: Created by the learner)
10
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Conclusion
It can be concluded that the functional organisational structure is best for this project.
The risk of failure of the project can be mitigated by proper strategies. The work break
down structure and Gantt chart has been provided to inform the time frame and stages
for completion of the project.
11
It can be concluded that the functional organisational structure is best for this project.
The risk of failure of the project can be mitigated by proper strategies. The work break
down structure and Gantt chart has been provided to inform the time frame and stages
for completion of the project.
11

Reference List
Channon, D.F. and Jalland, M., 2016. Multinational strategic planning. Springer.
Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to
planning, scheduling, and controlling. John Wiley & Sons.
12
Channon, D.F. and Jalland, M., 2016. Multinational strategic planning. Springer.
Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to
planning, scheduling, and controlling. John Wiley & Sons.
12
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 22
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.