This project management assignment presents a comprehensive plan for the installation of Botts Dots to enhance car safety during fog season. The project begins with a project selection phase, defining the project title, description, scope, and life cycle plan. It progresses to detailed project planning, including a statement of work (SOW) outlining objectives, deliverables, technical requirements, and customer reviews. The assignment then covers project organization, work breakdown structure (WBS), organization breakdown structure (OBS), responsibility matrix, and a communication plan. Cost estimates and risk management strategies are also included. The project further delves into scheduling using MS Project, creating Gantt charts and AON diagrams. Resource allocation and leveling are addressed, followed by a project report submission plan, project closing plan, and the final project report. The project plan includes detailed cost estimates, a communication plan, and a risk management strategy, all visualized through MS Project, Gantt charts, and AON diagrams. The project also provides a project schedule, resource allocation, and a final project report. The project concludes with a focus on project closure and report submission.
Document Page
Running head: PROJECT MANAGEMENT
Project management
Name of the Student
Name of the University
Author’s Note
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1
PROJECT MANAGEMENT
Table of Contents
Part 1- Project Selection.............................................................................................................2
1.1 Project Title.................................................................................................................2
1.2 Project Description......................................................................................................2
1.3 Scope...........................................................................................................................2
1.4 Project life cycle plan..................................................................................................2
Part 2- Project planning..............................................................................................................3
2.1 Project Statement of Work (SOW)..................................................................................3
2.1.1 Project Objectives.........................................................................................................3
2.1.2 Deliverables...................................................................................................................3
2.1.3 Technical requirements.................................................................................................4
2.1.4 Limits and Exclusions...................................................................................................4
2.1.5 Customer Review..........................................................................................................4
2.2 Project organization.........................................................................................................5
2.3 Work breakdown Structure..............................................................................................5
2.4 Organization breakdown Structure..................................................................................6
2.5 Responsibility Matrix.......................................................................................................6
2.6 Communication Plan........................................................................................................9
2.7 Cost estimates.................................................................................................................10
2.8 Managing risks/Risk mitigation.....................................................................................14
Part 3- Project Scheduling........................................................................................................16
3.1 Project planning and scheduling using MS project........................................................16
Document Page
2
PROJECT MANAGEMENT
3.2 Gantt chart......................................................................................................................20
3.3 AON diagram.................................................................................................................21
Part 4- Resource allocations and levelling...............................................................................21
4.1 Resource allocations and levelling using MS project....................................................21
4.2 Gantt Chart.....................................................................................................................22
Part 5- Project Report Submission...........................................................................................23
5.1 Project performance report plan.....................................................................................23
5.2 Project closing plan........................................................................................................23
5.3 Final report.....................................................................................................................25
Bibliography.............................................................................................................................27
Document Page
3
PROJECT MANAGEMENT
Part 1- Project Selection
1.1 Project Title
The title of the project is “Installation of Botts Dots for Car in fog season”.
1.2 Project Description
The project mainly focusses on the installation of Botts Dotts for fog season in order
to ensure the safety of the cars that generally pass through the roads during the fog season. It
is identified that the fog would generally helpful in reducing the visibility of the car from
distance and helps in creating some issues during driving and thus Botts Dotts would be quite
helpful in decreasing the probability of the occurrence and assists in forming effective flow of
traffic.
1.3 Scope
The in-scope of the project include:
Developing effective design outline
Undertaking design analysis
Developing proper interface
Coding sensor programming
Installing sensor
Connecting the solar batteries
1.4 Project life cycle plan
The project life cycle plan mainly includes four phases initiation, planning, execution as
well as closure. Each phase of the project life cycle has some tasks that needs to be completed
in order to achieve the goals and objectives of the project. It is identified that each of the step
plays a crucial role in finishing the entire project successfully.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4
PROJECT MANAGEMENT
Part 2- Project planning
2.1 Project Statement of Work (SOW)
The project statement of work generally helps in elaborating the scope of the work
that is generally involved for a vendor and assists in clarifying the entire deliverables, costs as
well as timelines. It is generally required in situations where a project generally involves both
vendors as well as proper external contributors in addition to the entire team of the project.
2.1.1 Project Objectives
The objectives of the project are as follows:
To install Botts Dotts for Car in fog season
To ensure the safety of the cars passing through the roads
To decrease the probability of the occurrence of the issue and helps in forming
effective flow of traffic
2.1.2 Deliverables
The deliverables of the project include:
Creating proper design outline
Analyzing design
Approval of the design
Gathering components
Coding sponsor programming
Development of interface
Integration of system with interface
Making effective lamp post for showing the light
Botts and Dotts source are installed at the top
Connection of solar batteries
Document Page
5
PROJECT MANAGEMENT
2.1.3 Technical requirements
The technical requirements of the project include:
Sensor
Light Post
LED lights
Light post
Boost converter
Filter
Battery
2.1.4 Limits and Exclusions
The limits and exclusions of the project are elaborated below:
Proper maintenance will not be provided
Project needs to be finished within the expected budget and time.
2.1.5 Customer Review
The customer reviews are as follows:
1st User: The Botts Dots are very much inexpensive and thus easily affordable.
2nd User: It is quite necessary to utilize as it helps in keeping the drivers in an
appropriate travel lane on curves under low condition visibility.
Document Page
6
PROJECT MANAGEMENT
2.2 Project organization
Figure 1: Project organization
(Source: Created by Author)
2.3 Work breakdown Structure
Figure 2: WBS
(Source: Created by Author)
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7
PROJECT MANAGEMENT
2.4 Organization breakdown Structure
Figure 3: Organization Breakdown Structure
(Source: Created by Author)
2.5 Responsibility Matrix
Responsibility assignment matrix is also known as the RACI matrix or linear
responsibility chart that generally assists in illustrating the participation by different roles in
order to complete tasks or deliverables. RACI acronym stands for four key responsibilities
that are Responsible, Accountable, Consulted, Informed.
Activities Projec
t
manag
er
Plann
er
Documen
ter
Analy
st
Design
er
IT
engine
er
Worke
rs
Test
er
Analyzi A, R C
Document Page
8
PROJECT MANAGEMENT
ng the
requirement
of the
project
Creatin
g project
initiation
documents
C A, R
Project
charter
documents
I A, R
Submiss
ion of
documents
I C A, R
Project
sign off
I A, R C
Plannin
g outline
I A, R C
Reviewi
ng the
project plan
I A, R C
Formati
on of
proper plan
A, R C I
Approv A, R C I
Document Page
9
PROJECT MANAGEMENT
al of the
plan
Creati
ng proper
design
outline
C A, R I
Analy
zing design
C A, R I
Comp
letion of the
entire
design
C A, R I
Appro
val of the
design
A, R C I
Gathe
ring
components
C I A, R
Codin
g sponsor
programmi
ng
I C A, R
Devel
opment of
interface
I C A, R
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10
PROJECT MANAGEMENT
Integr
ation of
system with
interface
I C A, R
Maki
ng effective
lamp post
for showing
the light
I C A, R
Senso
r is installed
I C A, R
Botts
and Dotts
source are
installed at
the top
I C A, R
Conne
ction of
solar
batteries
I C A, R
Testing
of sensor
auto
activation
I C A, R
Testing I C A, R
Document Page
11
PROJECT MANAGEMENT
the lights
that are
changed
Workin
g fog
prototyped
I C A, R
UX is
tested
I C A, R
Develop
ment of the
final
documents
C A, R I
Reviewi
ng the
documents
C A, R I
Signing
of the final
documents
C A, R I
Post
project
review
C A, R I
Stakeho
lder sign off
A, R C
Project
documentat
I C A, R