Construction Company Management: ADCO Bridge Project Report

Verified

Added on  2023/06/04

|13
|3450
|306
Report
AI Summary
Document Page
Running Head: Construction Company Management
Construction Company Management
Name
Institutional Affiliate
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
CONSTRUCTION COMPANY MANAGEMENT 2
Executive Summary
Winning a large infrastructure tender can carve out new opportunities for this construction
company and what better way to start off a new business venture into the public sector than the
construction of a public structure; a bridge. The company has expanded over the years and
therefore has the ability to carry out this project if the factors necessary to know whether it is
worth it are met. Project team members will ensure the project’s progress meets set timelines and
control measures are implemented where needed. The team members will be selected carefully
because they are a key aspect of good quality work.
Introduction
ADCO Constructions is located in North Sydney on 7-9 West Street, was established in the year
1972, and plays an important role in the construction industry composition. Bridges are an
important part of all infrastructures around the world. The construction company is getting
involved with a bridge construction project. The bridge will be a beam bridge that will
encompass quality in its construction. The company aims to be involved in construction,
checking on its progress, ensuring maximum safety by monitoring the quality of resources used
and applying controls throughout the construction. The quality of resources to be used will be
optimum in all aspects as this will translate to the best construction. The environment, being a
global concern, is our concern too. The project is aimed at being environmentally friendly, in
accordance with environmental laws. The project will be tailored to create a good working
environment where stakeholders and teams on the site are able to have an interaction as it goes
on.
2
Document Page
CONSTRUCTION COMPANY MANAGEMENT 3
Information on the project
The project will encompass the use of various professionals in its building. A civil engineer and
structural engineer will be needed as much as an electrical engineer and mechanical engineers
will be required. Other professions required in the project are material engineers and design
engineers. These different disciplines will be in charge of designing a structure that focuses on
safety, ensuring electricity powered resources are correctly designed, installed, maintained and
adjusted to fit their need where necessary. Machines used in construction will have to be
maintained and used safely which is another job that encompasses a mechanical engineer's work
in the project. Blueprints of the structure will also be created in cohesion by the engineers to be
able to produce the best structure that fits all the requirements. These individuals with diverse
knowledge that is necessary must be able to work together harmoniously to ensure quality
work(American Association of State Highway and Transportation Officials, 2017). A project
manager will be selected to ensure the project runs its course on schedule, ensure control
measures and adjustments are made on time.
Optimal quality will be a major characteristic of the bridge that will be observed. This is an
important aspect because good quality will guarantee fewer repair requirements thus reducing
future costs and it also guarantees durability. Environmental issues will be observed so that the
construction is regarded as environmentally friendly. An efficient construction system that is
relevant to a bridge construction is an important feature that will be observed. Such a system will
increase the rate of construction of the structure. The construction company will also aim at the
attractiveness of the bridge. A deep foundation is paramount to support the weight. Support
3
Document Page
CONSTRUCTION COMPANY MANAGEMENT 4
beams will then be assembled on the site as it is cost effective. The mega structure will then be
joined together and launched. Concrete will then be poured then finishing touches will be done.
The beam bridge will be used for transport on a short distance.
Selection of project team members
Such a large project will require a huge number of individuals to ensure the project objectives are
efficiently met and within the stated timelines. The staff required for this project is diverse and
some will be needed for a short period to provide skills required at a particular point while others
are required to be present on a day to day basis. With regard to this, it is realized that the
individual expertise involved in the project will keep changing. Clients, managers of the project
and consultants are some individuals who will remain constant in the project. In light of this
project team that is required. This team will see the construction of the bridge from its inception
to its completion. The team members will have to work closely together frequently and hence the
need to select the right members for the project team.
The project team must be properly planned as it is the basis of the achievement of a successful
project. As the expertise required for the project changes, so does the project team as the
construction goes on. The team will include a project manager, a lead consultant, other
consultants who will report to the lead consultant, a lead designer who will have a design team
reporting to them. A contractor, sub-contractor and suppliers will also be involved. The design
team will include an architect. The project manager will look out for the interests of the client
and the staff working on site.
To be able to select the proper project team, the ability to effectively communicate is paramount.
Effective communication will encompass the ability to communicate different kinds of messages
4
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
CONSTRUCTION COMPANY MANAGEMENT 5
to different audiences. This skill is important because they will be required to interact and work
with different people hence they have to pass on information in a way that will make people
want to do as they are told. The knowledge on regulations required in project management is
another characteristic that will be considered in selecting team members. This will ensure they
have the basics down hence it will be easier for them to work together. A high degree of the
organization will be considered. This is to ensure that they are able to know what is going on
with different sectors of the project to avoid chaos. The organization also ensures that the
individuals are able to work under pressure and are able to utilize the available resources
efficiently.
Project team members should have people skills. It involves the ability to make people look
forward to working on the project and being charismatic with the ability to influence multitudes
making them motivated to do quality work on the project and also influence the client to look
forward to quality work. Team members, especially the project manager should have skills of
estimation that are unparalleled. This is important for the efficient management of resources and
time. Activities should not be delayed because delay can cause a ripple effect that eventually
negatively affects the completion of the project on the set timeline. The team members should be
assertive. They should be able to stand up for their decisions however difficult for others to
follow.
Team performance appraisals will be used to ensure the project team efficiently carries out its
duties. Team members will be required to be accountable for each other so that they motivate
each other to efficiently work so they are able to have a good team appraisal. How they solve
problems will also be a way to measure their performance. The bridge will meet the political
5
Document Page
CONSTRUCTION COMPANY MANAGEMENT 6
requirements of the state to ensure it is not decommissioned when it is underway or even worse
when it is done.
Information on the company
The company offers construction services to its clients. The company focuses on providing
quality services. Apart from renovation, design and construction management services, the
company also involves itself in mega projects such as bridge building since its recent expansion.
The company has seen the completion of up to more than 3500 projects since it was founded. It
generates revenue in excess of one billion thus the conclusion that it is financially stable.
The company has been in business for a couple of years summing up to 46 years to date. Over
the years we have improved on various processes because of the experience gained as we have
worked on the projects that have come our way over the years. The company is a private
company that is among the largest due to the huge amounts of revenue generated on an annual
basis accompanied by a large turnover. We have more than five hundred and eighty employees
who are direct employees. The employee pool is diverse in the disciplines they major in and the
new ideas they bring to the company. The different kinds of work that we engage in include
housing both in the private and public sectors, the building of factories, medical facilities,
schools and infrastructure projects that are one of the larger ones. The basis of a successful
business is its strong foundation. This foundation includes employees. We invest in our staff so
that they are able to grow in the long run. This supports our aim of quality work and enables
development of the organization making us get a sizeable market share. This investment in the
staff eventually results in low rates of staff turnover. We are able to retain a lot of customers due
6
Document Page
CONSTRUCTION COMPANY MANAGEMENT 7
to this since the already present relationship between the customer and the staff goes on thriving
when the staff is retained.
We engage in welfare projects and an example of this is when we raised funds to aid farmers
who were affected by drought. We are also involved in the development of universities in all
aspects. We consider the environment as we work on any project so that the work we do is
environmentally friendly. We ensure to comply with set building standards. Safety for on-site
workers is guaranteed by the fact that we comply to set safety standards and procedures. We
ensure to ensure all our staff including the site workers so that they are guaranteed safety. One of
the major projects we have undertaken is the construction of an airport. The objective of the
project was to provide facilities that will be in use even in the future and provide a safe and
highly reliable structure. We also ensured the minimization of adverse environmental effects. We
ensured flexibility of the structure in case of future technological enhancements.
The company uses a divisional structure kind of management structure. Leadership is divided
according to the various projects that are being carried out. Managers of the different division are
selected by their skills(Cass, 2017). These skills include competence in understanding processes
in terms of technical skills and the ability to control projects. These are just skills that are
considered among others. The company focuses on strengthening itself to be able to withstand
any economic downturns. To do this we maintain a stable customer base by ensuring their
satisfaction. Having market strategies that are effective is another way to ensure organizational
strength. Proper staff management, encouraging innovation and consulting a professional
business consultant are other ways we have been able to live through economic downturns.
7
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
CONSTRUCTION COMPANY MANAGEMENT 8
The decision on whethertosubmit the tender
The decision to bid or not to bid is a decision that has to be made soundly to ensure that the right
choice is selected. To ensure this happens, there are considerations to be made. An analysis of
the strengths and advantages that will be enjoyed if the tender is won has to be made to realize
whether to submit a tender or not. These strengths and advantages have to be in conjunction with
the company's long-term goals. In case we win the tender to the project it will attract more clients
because we will be widely recognized once the project is underway and even more when it is
completed. We will also have a long-term source of revenue if we win the tender because any
future adjustments to the bridge or repairs will be catered for by this firm. This will also ensure
stability in the long run.
The presence or absence of profitability is a consideration that will be made. The project must be
able to generate a sizeable profit for the firm for it to be worthwhile (Wells & Kloppenborg,
2015). Analysis of the resources required to see the project through to its completion will be
done and measured against the price the client will pay. If it proves positive, the tender will be
applied but if the reverse is we will not apply for the tender. The analysis to measure profitability
will include calculation of the cost of labor that will include insurance costs and any additional
training costs. Cost of machines and tools and the cost of benefits provided to the laborers will
also be calculated. The summation of all this should be less than the expected revenue.
Once the presence of profits has been confirmed we will need to analyze and see whether the
organization has the ability to complete the task. To do this we will first consider the other
8
Document Page
CONSTRUCTION COMPANY MANAGEMENT 9
projects that are underway and what resources in terms of labour, equipment and funds have
been dedicated to them. By doing this we are able to tell if we have enough of the mentioned
resources for the upcoming large infrastructure project. These resources should be enough to
comfortably see the project through on time and high quality. If this condition is satisfied, the
bidding will be given a go ahead.
Historical data will be analyzed. We will look at the bids we have won in the past and the ones
we did not win and consider the causes. Once we do this we will be able to realize what the
chances of winning the bid are and factors to change to be able to increase our winning chances.
The project should be in line with the long-term organizational goals. We will have to clearly
identify the organizational goals, in the long run, to be able to decide whether the project aligns
with it or not. Our goal is expanding into the public market and since the project is aligned with
this it will be a great decision to tender for the project. A risk assessment will be conducted as a
way to decide whether to bid. A large project such as this one has a lot of potential risks such as
incomprehensive documents, lack enough knowledge on the construction grounds, unreasonable
timelines and inadequate safety. Adequate resources should be available for efficient
management of risks and even their elimination. High unmanageable risks will see the
organization not apply for the tender.
9
Document Page
CONSTRUCTION COMPANY MANAGEMENT 10
Conclusion
The organization is looking to expand into the public market and winning this tender will be a
major boost in the achievement of this goal. To be able to carry out this project a project team
will have to be formed. Their role will be to manage the construction in all aspect. The most
efficient team members will have to be selected for the realization of this goal. The company
also has to have enough resources to complete the project I all aspects. The criteria to realize
whether the tender is worth applying for have to be met. This report encompasses information on
all the above.
10
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
CONSTRUCTION COMPANY MANAGEMENT 11
References
Arslan, G. and Kivrak, S., 2008. Critical factors to company success in the construction industry.
World Academy of Science, Engineering and Technology, 45(1), pp.43-46.
Arslan, G., Kivrak, S., Birgonul, M.T. and Dikmen, I., 2008. Improving sub-contractor selection
process in construction projects: Web-based sub-contractor evaluation system (WEBSES).
Automation in Construction, 17(4), pp.480-488.
Brook, M., 2016. Estimating and tendering for construction work. Routledge.
Cheng, M.Y., Hsiang, C.C., Tsai, H.C. and Do, H.L., 2011. Bidding decision making for
construction company using a multi-criteria prospect model. Journal of Civil Engineering and
Management, 17(3), pp.424-436.
Clough, R.H., Sears, G.A., Sears, S.K., Segner, R.O. and Rounds, J.L., 2015. Construction
contracting: A practical guide to company management. John Wiley & Sons.
Crookshanks, R.J., Crookshanks Rex J, 2006. Building construction bid and contract
management system, internet-based method and computer program therefor. U.S. Patent
7,089,203.
Dave, B. and Koskela, L., 2009. Collaborative knowledge management—A construction case
study. Automation in construction, 18(7), pp.894-902.
11
Document Page
CONSTRUCTION COMPANY MANAGEMENT 12
Eriksson, P.E. and Westerberg, M., 2011. Effects of cooperative procurement procedures on
construction project performance: A conceptual framework. International journal of project
management, 29(2), pp.197-208.
Halpin, D.W., 2010. Construction management. John Wiley & Sons.
Hughes, W., Hillebrandt, P.M., Greenwood, D. and Kwawu, W., 2006. Procurement in the
construction industry: the impact and cost of alternative market and supply processes. Routledge.
Kärnä, S., 2004. Analysing customer satisfaction and quality in construction–the case of public
and private customers. Nordic journal of surveying and real estate research, 2.
Leśniak, A. and Plebankiewicz, E., 2013. Modeling the decision-making process concerning
participation in construction bidding. Journal of Management in Engineering, 31(2),
p.04014032.
Lou, E.C.W. and Alshawi, M., 2009. Critical success factors for e-tendering implementation in
construction collaborative environments: people and process issues. Journal of Information
Technology in Construction, 14, pp.98-109.
Maqsood, T., Finegan, A. and Walker, D., 2006. Applying project histories and project learning
through knowledge management in an Australian construction company. The Learning
Organization, 13(1), pp.80-95.
Mohemad, R., Hamdan, A.R., Othman, Z.A. and Noor, N.M.M., 2010. Decision support systems
(dss) in construction tendering processes. arXiv preprint arXiv:1004.3260.
Porwal, A. and Hewage, K.N., 2013. Building Information Modeling (BIM) partnering
framework for public construction projects. Automation in Construction, 31, pp.204-214.
12
Document Page
CONSTRUCTION COMPANY MANAGEMENT 13
Ryd, N., 2004. The design brief as carrier of client information during the construction process.
Design Studies, 25(3), pp.231-249.
Scherer, R.J. and Schapke, S.E., 2011. A distributed multi-model-based management information
system for simulation and decision-making on construction projects. Advanced Engineering
Informatics, 25(4), pp.582-599.
Sears, S.K., Sears, G.A., Clough, R.H., Rounds, J.L. and Segner, R.O., 2015. Construction
project management. John Wiley & Sons.
Smith, A.J., 2017. Estimating, Tendering and Bidding for Construction Work. Macmillan
International Higher Education.
Zavadskas, E.K., Turskis, Z. and Tamošaitiene, J., 2008. Contractor selection of construction in a
competitive environment. Journal of Business Economics and Management, 9(3), pp.181-187.
13
chevron_up_icon
1 out of 13
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]