Brightwell Vineyard Project Report: Development, Ethics, and Planning

Verified

Added on  2023/06/14

|21
|3743
|81
Report
AI Summary
This report provides a comprehensive overview of the Brightwell Vineyard project, an under-development building intended for vine production. It covers various aspects including site analysis, design team composition, stakeholder identification, regulatory and policy considerations, ethical and moral considerations, and financial aspects such as fees and costs. The report also delves into organizational structure, contractual and procurement strategies, health and safety considerations, and key professional practice issues. A personal development plan is included, outlining areas for improvement. The project emphasizes adhering to regulations related to building stability, insulation, ventilation, fire protection, and ethical practices, ensuring a safe and commercially viable building. The report concludes with strategies for effective project implementation and continuous improvement.
Document Page
E2 PROJECT
REPORT
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Table of Contents
INTRODUCTION...........................................................................................................................3
MAIN BODY..................................................................................................................................4
Site and brief................................................................................................................................4
Design team and stakeholders.....................................................................................................7
Regulations and policy considerations........................................................................................7
Moral and ethical consideration.................................................................................................8
Fees and cost...............................................................................................................................8
Organisational.............................................................................................................................9
Contractual and procurement strategies.......................................................................................9
Health and safety consideration.................................................................................................10
key issues of professional practice............................................................................................10
Conclusion.................................................................................................................................10
Personal development plan........................................................................................................11
REFERENCES..............................................................................................................................14
Appendix SUMMARY..................................................................................................................15
ESSAY...........................................................................................................................................16
CONCLUSION..............................................................................................................................18
REFERENCES..............................................................................................................................19
Document Page
INTRODUCTION
Brightwell Vineyard is an underdevelopment project related to designing a whole
building. The building will contain multiple departments . It will be a manufacturing unit.
Henceforth, the report will emphasis over the various elements related to the construction site.
Team will be designed and stakeholders also identify which may contribute in the development
of the landmark. Morale and ethical consideration will also take into consideration under this
project. Fees and cost related details are also provide associated with designing and constructing
the whole project. The project is also discussing the organisation's aspect related to management
and programming area of the project. Furthermore, procurement strategies are also discussed in
this project. Health and safety related considerations will also take into consideration while
designing and developing the whole building. Personal development plan has also been included
under this project which can derive complete details about overall individual development.
Document Page
MAIN BODY
Site and brief
Brightwell Vineyard is an under construction building that will manufacture vine. The
premises will be involved in producing vine. The design of the builder will cater the
manufacturer to produce the great quality of products along with facilitating other resources as
well in the building. Testing area of building will assess the quality of the production. This
project is discussing all aspects of the development of the landmark and building and will
consider all the relevant and necessary aspect of the building.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Document Page
Document Page
Design team and stakeholders
Designing Team is a process or a practice followed to design the whole team contain
different professionals handle certain team responsibility. The project manager will design and
formulate team comprises with bunch of employees and human resources that can offer expertise
to handle all operational and functional area of building. Professional will categories into
multiple departments such as human resources, marketing, production, designing team, resource
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
team, supply chain management, finance team and many more. All these departments will hire
employees to entertain certain functional responsibilities and areas (Frelin and Grannäs, 2021).
All these teams will include bunch of designated positions that may support and, motivate to the
organisation for addressing various roles and responsibilities at the organisation. Team will
include employee from different designated areas and professional which can further motivate to
the employees hold different skill set and abilities. Teams are already formulated and designed
and the roles and operational responsibilities are also segregated into different human resources
so that proper management can be sustained to handle the entire project.
Stakeholders are the one that is directly associated with the project. In this project
different stakeholder will also become a part of the project which include suppliers, human
resources, employees, management, procurement team, designers, financers, investors an many
more stakeholders. Internal stakeholder will involve project manager, project team, company and
funder. The external stakeholder group will involve customer government and suppliers. All
these stakeholder group contain certain role in the organisation and hold certain specific feature
of the venture (Balali and Valipour, 2021). Stakeholders involve with certain specific role in the
venture. Some of the stakeholders will have a direct involvement in the project and some will
Document Page
hold the indirect involvement in the project. All these stakeholders will play a crucial role in
implementing the entire project in such a way that investors can generate profits out of the
project.
Regulations and policy considerations
There are certain regulations which require to consider while designing the whole
building. These regulations involve features like stability of building, insulations, ventilation,
heating, fire protection and fire escape type of solutions which require to implement in the
building. All these are the essential in designing the whole building. Regulations consider the
safety, security, ethical aspect, social elements, designing and all such factors and aspects while
designing the whole building. Regulations are all legal as well social that can allow to the
stakeholder to entertain the facilities involve in building the best way possible. Policy
consideration of the developers and investor is to provide a building that can deal with the
commercial aspect of the building along with the ethical and social requirements of the people.
Every premises should be supportive enough with both ethical aspects as well commercial
requirements of project as well (Currie, 2021). The policy considerations of designing a building
include physical requirements of the project. The material that has used in the building should be
functional enough in context to intended use of the building. User experience is also mandatory
in case of any commercial space created. This is important that the building and premises must
be suitable enough to meet up the need and requirements of the target customer in the market.
Time and money are the two-core element that is essential in case of designing and developing
the whole building. The building needs to construct in the stipulated time frame and the finances
available to develop the whole building. The stakeholders will try to meet up the commercial
aspect along with the organisation need from the project.
Moral and ethical consideration
The building should be sufficient enough to entertain all different needs and requirements
of the project. The ethical value of the project t is such that the building must be suitable enough
to entertain the safety and security related need of the people will work on the building along
with the commercial need of the business. There will not be any illegal practice involve in the
project that may offer or challenge to the need and requirements of the project. The building will
come up with health-related aspects of the employee will work in the building. There will be
Document Page
sufficient space for all the types of need and requirements of the organisation. The informed
consent is a principle that will be addressed in this project. Voluntary participation will also be
supported in the project (Garland, 2021). Do not harm is another valid ethical consideration that
will address in this project. Confidentiality will also be supported in the project. All relevant and
necessary information associated with the business and building will be kept confidential in this
project. This information will not disclose in front of any individual if it is not necessary to
disclose the same. Ethical values will be highly supportive in the project.
Fees and cost
Fees Cost
Material 1000000
Labour 500000
Landscaping 200000
Hiring 200000
Equipment 800000
Contract fees 150000
Legal fees 250000
Machines 900000
Supply chain cost 200000
Architect fees 100000
Other cost 700000
Total cost 5000000
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Organisational
This project will also involve management and programming related task as well. The
managers will overlook all different aspects of the project and the programming will be done by
the professional hired over the respective position role over the project. The Brightwell Vineyard
will hire suitable human resources that will be appointed over the position role of manager and
programmer (Jankovic and Carta, 2021). In current time for every building programming involve
the complete set of structure related to operations that will channel at the time of operations. The
human resource team will hire suitable resources over all different designated role to meet the
all-different need and requirements of venture. The information technology systems will also
install to deliver and execute the programming over the project. Technician and information
technology [professional will also hire that will look all the matter related to programming over
the project. In the modern time programming and latest system of information technology play a
vital role for the companies to achieve success in the market. These systems will also allow to
the venture to take on the competitive advantage in the market.
Contractual and procurement strategies
In order to make valid results, it has been identified that there are many contracts
finalised with the sponsor that helps to meet the requirement. For the chosen site, only fixed
price contracts has been used in which cost of the product will be fixed and get certainty around
the scope of a work within a fixed tenure. This in turn help Brightwell Vineyard to complete on
the time and meet the defined aim as well (Santos and Gallardo, 2021). Under this contractual
strategy, the new building signed an agreement with two parties in which one of them will
provide and establish the price the other party will pay. The rationale for opting this strategy is
such that they come with a pricing guarantee and as long as the contract run, there will be no
change in the prices. That is why, it is consider as a safest way to finalise the contract in order to
meet the defined aim and implement vineyard in a better manner.
Health and safety consideration
It is essential for the sponsor to meet all the health and safety consideration and comply
with the act as well. For that Health and safety act will be used in which a safe working
environment will be provided and all the essential and safe equipment need to be provided.
Ensure that all the human resources should be trained enough that helps to meet the defined aim
Document Page
within an effective tenure (Ramulu and Abdullah, 2021). Apart from this, employees working in
the building should be provided with proper facility and employers should ensure to carry out
risk assessment so that risk can be pre-identified. This in turn causes positive impact over the
project and protect the public from health and safety risk as well. That is why, all the risk can be
minimised and they can implement the work accordingly.
key issues of professional practice
In the context of present study, there are many key issues faced by the sponsor with
regard to the professional practice and this include, due to changing working environment, most
of the team member’s faces issue to comply with the same (Liu, 2021). This in turn causes
negative impact over the business performance. Apart from this, a pressure from the peers
always affect the working performance and causes adverse impact upon result. It is so because it
is not easy to implement the change under pressure and this in turn delay the project deadline as
well. Further, not complying with ethical aspect within a project is also considered as a key
professional issue within a business area. Such that all the ethical consideration need to be
complied because assist to complete the project within a defined manner (de Lucas Ancillo del
Val Núñez and Gavrila, 2021). In addition to this, another issue considered under professional
practice involve changes in the price of a product and as a result, the set budget affected that
causes negative impact and might delay the timeline as well. Thus, these issues might affected
the overall performance of a project in negative manner.
Conclusion
From the above report, it has been concluded that by complying with all the stages, the
Brightwell Vineyard can be easily implemented within a business. Also, there is a need to
comply with all the policies which assist to complete the project in a defined manner. Further, it
has been concluded that with the support from team, the selected project can be easily
implemented and this in turn help to improve the overall performance. This in turn causes
positive impact over the business because by making effective decision and involving with all
stakeholders, sponsor can easily implement the project and meet the set target as well. Also, by
using fixed price contract, the sponsor can supply the goods and fulfil the need of the clients.