Project Management Plan for Broadband Services: ICTPM610
VerifiedAdded on 2023/02/03
|28
|1616
|27
Report
AI Summary
This report details a project management plan for establishing broadband services, focusing on a case study of My Telecom's expansion into Melbourne, Australia. The project is structured in three phases: planning, execution, and completion. The report includes client overviews, outlining My Telecom's services and target markets (business and home). It defines the project scope, objectives, and deliverables, including project assessment reports with findings, recommendations, and potential OHS concerns. The project analysis and design sections cover estimated duration, target audience, and mock-up designs, alongside budget specifics and copyright/legal issues. The report concludes by emphasizing the importance of effective administration designs for project success, referencing cloud technology, optical fiber, and radio technology, and citing relevant academic sources. The project aims to provide high-speed internet services to various geographical locations in Melbourne.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.

ictpmg610
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Table of Content
Introduction
Client Overviews
Scope
Project Assessment Report
Project Analysis and Design
Project Management
Introduction
Client Overviews
Scope
Project Assessment Report
Project Analysis and Design
Project Management

Introduction
This simply been said that broadband creates affordable access to
the genuine download speeds of minimum of 100 Mbps and real upload
speeds of minimum 50 Mbps by 2020 over a fixed network for the
consumers and small organization, convenient accessible access to a
gigabit synchronous for “anchor investors”, and convenient access
to4G wireless broadband network. However, this can be rightly said
that the 4G wireless networks. In practical implication, although,
“broadband is moving target, that is routinely being redefined by the
market situations and enhanced tools.
This simply been said that broadband creates affordable access to
the genuine download speeds of minimum of 100 Mbps and real upload
speeds of minimum 50 Mbps by 2020 over a fixed network for the
consumers and small organization, convenient accessible access to a
gigabit synchronous for “anchor investors”, and convenient access
to4G wireless broadband network. However, this can be rightly said
that the 4G wireless networks. In practical implication, although,
“broadband is moving target, that is routinely being redefined by the
market situations and enhanced tools.

Project Management Plan for establishment of the
Broadband services will be completed in three phases
Project Management Plan Estimated time frame
Phase 1
Planning of the PMP: -
Incorporation of the Broadband Plan
Making of budgetary Plan
Incorporating of transmission path
3 WEEKS
3 WEEKS
9 WEEKS
Phase 2
Execution
Incorporation of Transmission Path
Getting of various regulatory approvals
Quality audits
Capital requirement related plan
28 WEEKS
3 WEEKS
12 WEEKS
2 WEEKS
Phase 3
Completion of the entire project
2 WEEKS
Broadband services will be completed in three phases
Project Management Plan Estimated time frame
Phase 1
Planning of the PMP: -
Incorporation of the Broadband Plan
Making of budgetary Plan
Incorporating of transmission path
3 WEEKS
3 WEEKS
9 WEEKS
Phase 2
Execution
Incorporation of Transmission Path
Getting of various regulatory approvals
Quality audits
Capital requirement related plan
28 WEEKS
3 WEEKS
12 WEEKS
2 WEEKS
Phase 3
Completion of the entire project
2 WEEKS
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Client Overviews
As per the mentioned case scenarios, it has been found that My telecom
is one of the reliable MNC which is related with providers of major
internet and broad band facilities to the people across the nations.
Client have plenty of option to select their own telecom which would
operate in the market to get effective and efficient opportunity to make
use of various facilities through using faster network.
My Telecom is considered as one of the leading company in the nation.
As per the mentioned case scenarios, it has been found that My telecom
is one of the reliable MNC which is related with providers of major
internet and broad band facilities to the people across the nations.
Client have plenty of option to select their own telecom which would
operate in the market to get effective and efficient opportunity to make
use of various facilities through using faster network.
My Telecom is considered as one of the leading company in the nation.

Services provided by Mytelecom
In respect to marketing point of view, there is no any dissimilarity
among products and services, because plenty of them are considered
mainly for identical through billing and marketing process. It has been
observed that My telecom is planning to make modification in
producing specific products like Broadband Services, Mobile network,
wireless and VOIP.
In respect to marketing point of view, there is no any dissimilarity
among products and services, because plenty of them are considered
mainly for identical through billing and marketing process. It has been
observed that My telecom is planning to make modification in
producing specific products like Broadband Services, Mobile network,
wireless and VOIP.

Product selling
A product is said to be related with logical entity which would be
sold out to closed customers used to purchase the operators. A product
can have their monthly rental that would be considered as more parodic
cost. They are generating item or non-usage products specification. All
the packages need to allow an effective product which is to be offered
to various client at minimum cost.
A product is said to be related with logical entity which would be
sold out to closed customers used to purchase the operators. A product
can have their monthly rental that would be considered as more parodic
cost. They are generating item or non-usage products specification. All
the packages need to allow an effective product which is to be offered
to various client at minimum cost.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Choice of customers:
The company is going to provided their telecommunication services to
two segments. Such as:
Business
Home
The company is going to provided their telecommunication services to
two segments. Such as:
Business
Home

Types of market where they used to operate
There are presently operating in various parts of the nations. It
working around 60 countries throughout the world. Now, it is planning
to enter into broadband and VOIP services in Melbourne Australia.
There are presently operating in various parts of the nations. It
working around 60 countries throughout the world. Now, it is planning
to enter into broadband and VOIP services in Melbourne Australia.

Underlying values and motivation
A personal value of society and various people of that particular
nation is related with Online shopping. It is social affiliation used to
acts as examine belief in increasing the moral of customers to get
utilitarian advantage. The current evaluation is based on first to make
proper investigation of individual values those are related with various
sources connected with the online mode of applications.
A personal value of society and various people of that particular
nation is related with Online shopping. It is social affiliation used to
acts as examine belief in increasing the moral of customers to get
utilitarian advantage. The current evaluation is based on first to make
proper investigation of individual values those are related with various
sources connected with the online mode of applications.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Scope
It is considered as one of the crucial aspect of project planning
which will be associated with determining an effective list of specific
project aims, feature, activities, deadlines and other costs those are
started by My telecom company. In other words, it has been related
with the aim of attaining overall establishment aims that must be
providing better response to the company and other individual. All
activities those are lies as internal areas of project need to be accounted
for with proper schedule and sufficient amount budgets.
It is considered as one of the crucial aspect of project planning
which will be associated with determining an effective list of specific
project aims, feature, activities, deadlines and other costs those are
started by My telecom company. In other words, it has been related
with the aim of attaining overall establishment aims that must be
providing better response to the company and other individual. All
activities those are lies as internal areas of project need to be accounted
for with proper schedule and sufficient amount budgets.

About project accomplishment:
According to the mentioned information about various project
planning those are related with establishing broadband and VOIP. It
must be considered as one of the effective project which would assist
the people as well as large companies to connect with each other. The
planning used to deliver best services to businesses at different
geographical location in Melbourne that take away from city location.
According to the mentioned information about various project
planning those are related with establishing broadband and VOIP. It
must be considered as one of the effective project which would assist
the people as well as large companies to connect with each other. The
planning used to deliver best services to businesses at different
geographical location in Melbourne that take away from city location.

Outcomes generated after completion of project
All the objectives are set as per the process of deliverables
outcomes which is often to make require all concrete things those
are considered while planning the broadband services.
The results are more effective or profitable for the company as
well as the economy at the same point of time.
All the objectives are set as per the process of deliverables
outcomes which is often to make require all concrete things those
are considered while planning the broadband services.
The results are more effective or profitable for the company as
well as the economy at the same point of time.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Project Assessment Report:
Introduction
In this modern era the major purpose of each small as well as large
business enterprises is to expand their business operations and
functions at large scale in respect to attaining higher growth and
success at market place.
Project Findings
Project Recommendation
Possible OHS Concerns
Introduction
In this modern era the major purpose of each small as well as large
business enterprises is to expand their business operations and
functions at large scale in respect to attaining higher growth and
success at market place.
Project Findings
Project Recommendation
Possible OHS Concerns

Project Findings
Different elements are required as to briefly complete the work in which
some are associated as below:
Time:
Cost:
Resources:
Quality:
Risk:
Different elements are required as to briefly complete the work in which
some are associated as below:
Time:
Cost:
Resources:
Quality:
Risk:

Project Recommendation
As to setting up new broadband services company needs to maintain
proper hardware and software specifications, server configuration,
network protocol etc.
Proper hardware facilities likewise computer networks, system needs,
transmission paths(cables, Optical Fibres, radio and microwave).
It is also essential for organisation to maintain appropriate software
which are essential for implementing broadband facilities.
As to setting up new broadband services company needs to maintain
proper hardware and software specifications, server configuration,
network protocol etc.
Proper hardware facilities likewise computer networks, system needs,
transmission paths(cables, Optical Fibres, radio and microwave).
It is also essential for organisation to maintain appropriate software
which are essential for implementing broadband facilities.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Possible OHS Concerns
Occupational safety and health is considered as a multidisciplinary field
which is concerned with the safety, health and welfare of the
people at work place. In this kind of projects various issues are
occurs and has a direct influence on project management plan.
Health security of workers
Security of resources
Occupational safety and health is considered as a multidisciplinary field
which is concerned with the safety, health and welfare of the
people at work place. In this kind of projects various issues are
occurs and has a direct influence on project management plan.
Health security of workers
Security of resources

Project Analysis and Design
Project estimated Duration
Target Audience
Mock-up Design
Project estimated Duration
Target Audience
Mock-up Design

Project estimated Duration
For this particular project the specified time is 12 month, as in this it is
required for investigator to design an effective time frame in which
all the activities and operations are completed within the time
duration of 12 month.
For this particular project the specified time is 12 month, as in this it is
required for investigator to design an effective time frame in which
all the activities and operations are completed within the time
duration of 12 month.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Target Audience
In the particular research work other business organisations and home
are the targetted people. The major focused area of firm is to
providing effective services to their significant customers in respect
to satisfying their needs and wants at market place. The company
Mytelecom planned to provide their services to business and homes
which are situated at different geographical location in Melbourne
away from the city too.
In the particular research work other business organisations and home
are the targetted people. The major focused area of firm is to
providing effective services to their significant customers in respect
to satisfying their needs and wants at market place. The company
Mytelecom planned to provide their services to business and homes
which are situated at different geographical location in Melbourne
away from the city too.

Mock-up Design

Project Management
Preliminary evaluation of technologies
Cloud technology
XaaS
Optical fibre
Radio technology
Microwave transmissions
Preliminary evaluation of technologies
Cloud technology
XaaS
Optical fibre
Radio technology
Microwave transmissions
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Project Timeline
Process TOTAL: 12
MONTHS
Computer network equipment: The company firstly will be required to
purchase the necessary equipments that will be necessary for the projects
to be completed.
Time required: 1
Month
Site Evaluation: The managers of the My telecom company has to make
on evaluation of the area and site where the Broadband lines will be
distributed and the net services will be provided. This is the most crucial
process which involves a proper evaluation of the area.
Time required : 4
months
Infrastructure requirements: In this step the company have to develop a
certain infrastructure which will be necessary for the undertaking the
project. The infrastructure includes providing facilities to workers and
engineers who will be operating on site.
5 months
System needs: In this the managers have to evaluate the systems that will
be required in the company for undertaking the broadband lines. The high
tech systems will be required for this project as the high speed net lines are
provided.
2 months
Process TOTAL: 12
MONTHS
Computer network equipment: The company firstly will be required to
purchase the necessary equipments that will be necessary for the projects
to be completed.
Time required: 1
Month
Site Evaluation: The managers of the My telecom company has to make
on evaluation of the area and site where the Broadband lines will be
distributed and the net services will be provided. This is the most crucial
process which involves a proper evaluation of the area.
Time required : 4
months
Infrastructure requirements: In this step the company have to develop a
certain infrastructure which will be necessary for the undertaking the
project. The infrastructure includes providing facilities to workers and
engineers who will be operating on site.
5 months
System needs: In this the managers have to evaluate the systems that will
be required in the company for undertaking the broadband lines. The high
tech systems will be required for this project as the high speed net lines are
provided.
2 months

Budget
Particualrs Amount in GBP
Research 15,850,000,000
Image Editing 3,850,000,000
Development 24,256,500,000
Testing 8,958,784,000
Total 52,915,284,000
Particualrs Amount in GBP
Research 15,850,000,000
Image Editing 3,850,000,000
Development 24,256,500,000
Testing 8,958,784,000
Total 52,915,284,000

Copyright and Legal Issue
Nowadays, this can be rightly said that the Intellectual Protections
Rights related issues are to be known as the business objectives in
an effective manner. Here are certain points which must be related
to the business IPRs related issues. There is a strict need to get
registered the company as per the IPR Act so that no one could
infringe the IPRs.
Copyright
Legal Issue
Nowadays, this can be rightly said that the Intellectual Protections
Rights related issues are to be known as the business objectives in
an effective manner. Here are certain points which must be related
to the business IPRs related issues. There is a strict need to get
registered the company as per the IPR Act so that no one could
infringe the IPRs.
Copyright
Legal Issue
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Conclusion
From the above given report it has been concluded that in this modern
and competitive era the major purpose of each small as well as large
business enterprises is to attaining high growth and success at
market place through expanding their business operations at large
scale. Administration designs are those which are most vital for
getting prevail of the venture.
From the above given report it has been concluded that in this modern
and competitive era the major purpose of each small as well as large
business enterprises is to attaining high growth and success at
market place through expanding their business operations at large
scale. Administration designs are those which are most vital for
getting prevail of the venture.

References
Fantacci, R., and et. al., 2016. Public safety networks evolution toward
broadband: Sharing infrastructures and spectrum with commercial
systems. IEEE Communications Magazine. 54(4). pp.24-30.
Kotecha, L. R. and Aguirre, S., Verizon Patent and Licensing Inc,
2015. Split customer premises equipment architecture for
provisioning fixed wireless broadband services. U.S. Patent
9,077,649.
Chow, A. T., and et. al., 2012. Computer readable medium with
embedded instructions for providing communication services
between a broadband network and an enterprise wireless
communication platform within a residential or business
environment. U.S. Patent 8,155,155.
Fantacci, R., and et. al., 2016. Public safety networks evolution toward
broadband: Sharing infrastructures and spectrum with commercial
systems. IEEE Communications Magazine. 54(4). pp.24-30.
Kotecha, L. R. and Aguirre, S., Verizon Patent and Licensing Inc,
2015. Split customer premises equipment architecture for
provisioning fixed wireless broadband services. U.S. Patent
9,077,649.
Chow, A. T., and et. al., 2012. Computer readable medium with
embedded instructions for providing communication services
between a broadband network and an enterprise wireless
communication platform within a residential or business
environment. U.S. Patent 8,155,155.

THANK YOU
1 out of 28
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.