This document presents a comprehensive set of project planning templates designed for a business development project, specifically tailored for the BSBPMG522A unit. The assignment begins with a project brief outlining the purpose, rationale, and strategic context of the project, which aims to develop a system for Max Lionel Reality to provide employees with policy information and a complaint mechanism. The document then progresses through project initiation and scope, including a project scope document, stakeholder analysis, and communication plan. Subsequent sections detail project planning, featuring a work breakdown structure, project plan, Gantt chart, budget, and risk register. The implementation phase is addressed with change requests and an issues log, while monitoring is covered through status update reports. Finally, the document concludes with finalization and review, including budget variation reports, post-project review meetings, and handover reports. These templates provide a structured approach to project management, covering all essential aspects from initiation to completion, and include detailed information on roles, responsibilities, and project approvals. The project focuses on developing a support system for employees, enhancing transparency, and ensuring a safe and healthy work environment.

Project Planning Templates
BSBPMG522 Undertake project work
Part of a suite of support materials for the
BSB07 Business Services Training
Package
BSBPMG522 Undertake project work
Part of a suite of support materials for the
BSB07 Business Services Training
Package
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Table of Contents
1.1 – Initiation and scope..........................................................................................1
Project brief.....................................................................................................1
Project scope document...................................................................................2
Stakeholder analysis........................................................................................3
Communication plan (example)......................................................................4
Roles and responsibilities................................................................................5
Project snapshot...............................................................................................6
1.2 – Planning...........................................................................................................7
Work breakdown structure..............................................................................7
Project plan......................................................................................................8
Gantt chart.....................................................................................................12
Activities schedule.........................................................................................13
Budget............................................................................................................14
Risk register...................................................................................................15
Risk assessment form....................................................................................16
1.3 – Implementation..............................................................................................17
Change requests.............................................................................................17
Issues log.......................................................................................................18
1.4 – Monitoring.....................................................................................................19
Status update report.......................................................................................19
1.5 – Finalising and review.....................................................................................20
Budget variation report..................................................................................20
Post-project review meeting..........................................................................21
Handover report.............................................................................................22
Post-project review report..............................................................................23
1.1 – Initiation and scope..........................................................................................1
Project brief.....................................................................................................1
Project scope document...................................................................................2
Stakeholder analysis........................................................................................3
Communication plan (example)......................................................................4
Roles and responsibilities................................................................................5
Project snapshot...............................................................................................6
1.2 – Planning...........................................................................................................7
Work breakdown structure..............................................................................7
Project plan......................................................................................................8
Gantt chart.....................................................................................................12
Activities schedule.........................................................................................13
Budget............................................................................................................14
Risk register...................................................................................................15
Risk assessment form....................................................................................16
1.3 – Implementation..............................................................................................17
Change requests.............................................................................................17
Issues log.......................................................................................................18
1.4 – Monitoring.....................................................................................................19
Status update report.......................................................................................19
1.5 – Finalising and review.....................................................................................20
Budget variation report..................................................................................20
Post-project review meeting..........................................................................21
Handover report.............................................................................................22
Post-project review report..............................................................................23

BSBPMG522A Undertake project work Project Planning Templates
© 2013 Innovation and Business Industry Skills Council Ltd 1st edition version: 1
Page 1 of 24
© 2013 Innovation and Business Industry Skills Council Ltd 1st edition version: 1
Page 1 of 24
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

BSBPMG522A Undertake project work Project Planning Templates
1.1 – INITIATION AND SCOPE
Project brief
Project purpose and rationale
Max Lionel Reality is a property developing company in which approximately 100
people are working. Max Lionel is the company which remains indulged in the
practices of providing a better and effective set of support to the people working with
the company so as to ensure that these people working in the workplace could remain
happy and feels secure while working company wants to develop a fair policy plan.
To develop a fair policy plan company is planning to initiate a project which will help
in designing software (JIE, 2017). This software will ensure that the employees
working with the company should have proper information about all the aspects
related to the policies of the company. In case of any breach, employees will be
provided the access to make a complaint about the software on behalf of which strict
actions will be taken by the company if the person will be found guilty. Hence, to
provide an appropriate and relevant set of information related to the project initiated
by the company a report is developed in which all the aspects related to the project
will be bifurcated and information related to the same will be availed in the report
(Wasson, 2015).
Project title
System Development Project for Max Lionel Reality
Project purpose
Purpose of the system development project for Max Lionel Reality is to ensure that
the employee working in the organization could get the access to gain a proper set of
information related to the workplace policies. The project initiated will provide a set
direction with the help of which Max Lionel Reality will be able to provide an
appropriate set of information to the employees working over there (Anthony, &
Garner, 2016). The project will also provide access to the employees working at the
© 2013 Innovation and Business Industry Skills Council Ltd 1st edition version: 1
Page 2 of 24
1.1 – INITIATION AND SCOPE
Project brief
Project purpose and rationale
Max Lionel Reality is a property developing company in which approximately 100
people are working. Max Lionel is the company which remains indulged in the
practices of providing a better and effective set of support to the people working with
the company so as to ensure that these people working in the workplace could remain
happy and feels secure while working company wants to develop a fair policy plan.
To develop a fair policy plan company is planning to initiate a project which will help
in designing software (JIE, 2017). This software will ensure that the employees
working with the company should have proper information about all the aspects
related to the policies of the company. In case of any breach, employees will be
provided the access to make a complaint about the software on behalf of which strict
actions will be taken by the company if the person will be found guilty. Hence, to
provide an appropriate and relevant set of information related to the project initiated
by the company a report is developed in which all the aspects related to the project
will be bifurcated and information related to the same will be availed in the report
(Wasson, 2015).
Project title
System Development Project for Max Lionel Reality
Project purpose
Purpose of the system development project for Max Lionel Reality is to ensure that
the employee working in the organization could get the access to gain a proper set of
information related to the workplace policies. The project initiated will provide a set
direction with the help of which Max Lionel Reality will be able to provide an
appropriate set of information to the employees working over there (Anthony, &
Garner, 2016). The project will also provide access to the employees working at the
© 2013 Innovation and Business Industry Skills Council Ltd 1st edition version: 1
Page 2 of 24
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

BSBPMG522A Undertake project work Project Planning Templates
workplace to file a complaint and remaining informed related with any kind of new
plan or policy.
Background and strategic context
Max Lionel Reality is a company which is known for providing property development
solution. The company has many of the satisfied customers for whom it works
(Castellanos, Cigarrán, & García-Serrano, 2017). Max Lionel Reality is the company
of which there are 100 employees. These 100 employees work together to ensure that
the quality could be provided in the project. To manage the quality all the set of
aspects is being used by the company. In this situation, it becomes important for Max
Lionel Reality to take care of the employees working for it and to help them in
managing their professional life in an appropriate way. Therefore, to provide a healthy
and happy working environment Max Lionel Reality prefer to apply Work Health and
Safety Policy and Anti-Discrimination Policy at the workplace. These policies provide
an appropriate set of solution to the employees working in the workplace and help
them in feeling safe for the workplace they are working (Mavridis, Gross-Amblard,
and Miklós, 2016).
Max Lionel Reality is the company which works for the purpose of maintaining
transparency at the workplace. In this situation, the company is willing to work on a
project which could help in developing software for the employee help support. The
support system will work for providing an appropriate set of information to the
employees working in the workplace and will help them in filing any complaint or
issue. This support system will enhance the transparency of the workplace and will
help the employees in remaining informed (Mainga, 2017). Hence, to provide in-depth
information related to various aspects of the project this report is developed which
will include information related to the process and practices required by the company
to be followed so as to manage the IT project. The report will help all the company in
making the decision of whether the project initiated by it will be fruitful or not and
whether it will provide a helping hand to the company of will affect the goodwill in
the market.
Priority
Max Lionel Reality is a company which is working towards to provide an effective
support system to the employees working over there. In present time managing
© 2013 Innovation and Business Industry Skills Council Ltd 1st edition version: 1
Page 3 of 24
workplace to file a complaint and remaining informed related with any kind of new
plan or policy.
Background and strategic context
Max Lionel Reality is a company which is known for providing property development
solution. The company has many of the satisfied customers for whom it works
(Castellanos, Cigarrán, & García-Serrano, 2017). Max Lionel Reality is the company
of which there are 100 employees. These 100 employees work together to ensure that
the quality could be provided in the project. To manage the quality all the set of
aspects is being used by the company. In this situation, it becomes important for Max
Lionel Reality to take care of the employees working for it and to help them in
managing their professional life in an appropriate way. Therefore, to provide a healthy
and happy working environment Max Lionel Reality prefer to apply Work Health and
Safety Policy and Anti-Discrimination Policy at the workplace. These policies provide
an appropriate set of solution to the employees working in the workplace and help
them in feeling safe for the workplace they are working (Mavridis, Gross-Amblard,
and Miklós, 2016).
Max Lionel Reality is the company which works for the purpose of maintaining
transparency at the workplace. In this situation, the company is willing to work on a
project which could help in developing software for the employee help support. The
support system will work for providing an appropriate set of information to the
employees working in the workplace and will help them in filing any complaint or
issue. This support system will enhance the transparency of the workplace and will
help the employees in remaining informed (Mainga, 2017). Hence, to provide in-depth
information related to various aspects of the project this report is developed which
will include information related to the process and practices required by the company
to be followed so as to manage the IT project. The report will help all the company in
making the decision of whether the project initiated by it will be fruitful or not and
whether it will provide a helping hand to the company of will affect the goodwill in
the market.
Priority
Max Lionel Reality is a company which is working towards to provide an effective
support system to the employees working over there. In present time managing
© 2013 Innovation and Business Industry Skills Council Ltd 1st edition version: 1
Page 3 of 24

BSBPMG522A Undertake project work Project Planning Templates
internal decorum of the company has become because it helps in reducing staff
turnover ratio and increasing quality to the work (Wasson, 2015). It is being observed
that happy workplace environment helps in keeping the employees happy and provide
an opportunity for growth to the organization. In this case, it becomes necessary that
Max Lionel Reality should develop a proper support system for the employees who
could help them in managing the work and ensure their safety and security at the
workplace (Furnham, & Gunter, 2015).
Related projects
Many of the projects were undertaken by the project manager who is working on the
project of Max Lionel Reality. The project manager has worked with the Management
Information System of other companies and managed many other technical projects.
In this case, it won’t be much hard for the project manager to develop a project
management plan for Max Lionel Reality.
Project client/owner
A project of developing a support system for the company will be undertaken by the
project manager. All the roles and responsibilities will be performed in an appropriate
by him and team building activities will also be taken into consideration. The project
manager will ensure that all the deadlines should meet in an appropriate way and all
the loops and gaps should be filled within so that quality could be maintained
(Anthony, & Garner, 2016).
Project sponsor
A project of developing an information system requires a huge amount of funds in this
situation it becomes necessary that the company should find the sponsor who could
fund the project. ABC Bank is a financial institution which provides funding for such
type of project. This bank will sponsor the project and will help in managing the same
in an appropriate way (Castellanos, Cigarrán, & García-Serrano, 2017).
Project manager
John is a project manager who will keep eye on every single activity of the project.
John has an effective set of experience in the field of project management. In this
project, John will work on the plan developed in the report and will help in processing
the project in a smooth and subtle way.
© 2013 Innovation and Business Industry Skills Council Ltd 1st edition version: 1
Page 4 of 24
internal decorum of the company has become because it helps in reducing staff
turnover ratio and increasing quality to the work (Wasson, 2015). It is being observed
that happy workplace environment helps in keeping the employees happy and provide
an opportunity for growth to the organization. In this case, it becomes necessary that
Max Lionel Reality should develop a proper support system for the employees who
could help them in managing the work and ensure their safety and security at the
workplace (Furnham, & Gunter, 2015).
Related projects
Many of the projects were undertaken by the project manager who is working on the
project of Max Lionel Reality. The project manager has worked with the Management
Information System of other companies and managed many other technical projects.
In this case, it won’t be much hard for the project manager to develop a project
management plan for Max Lionel Reality.
Project client/owner
A project of developing a support system for the company will be undertaken by the
project manager. All the roles and responsibilities will be performed in an appropriate
by him and team building activities will also be taken into consideration. The project
manager will ensure that all the deadlines should meet in an appropriate way and all
the loops and gaps should be filled within so that quality could be maintained
(Anthony, & Garner, 2016).
Project sponsor
A project of developing an information system requires a huge amount of funds in this
situation it becomes necessary that the company should find the sponsor who could
fund the project. ABC Bank is a financial institution which provides funding for such
type of project. This bank will sponsor the project and will help in managing the same
in an appropriate way (Castellanos, Cigarrán, & García-Serrano, 2017).
Project manager
John is a project manager who will keep eye on every single activity of the project.
John has an effective set of experience in the field of project management. In this
project, John will work on the plan developed in the report and will help in processing
the project in a smooth and subtle way.
© 2013 Innovation and Business Industry Skills Council Ltd 1st edition version: 1
Page 4 of 24
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

BSBPMG522A Undertake project work Project Planning Templates
Project status
The project will be based on forecasting in which predictions of every single aspect
will be done and evaluation of every single activity will be done in a proper way. The
project will be based on the scheduled who is being prepared by the project manager
on the basis of forecasting and predictions (Liu, 2012). Cost of the project will remain
fixed which is agreed in advance by the project management company and Max
Lionel Reality. Future fluctuations in the government policies and the economy will
not have any impact on the project.
Special provisions
The project will ensure to undertake all the ethical aspects in which assurance will be
made that all the employees working in the workplace will get benefited. The project
will also help in the growth aspects of the society and will provide them the support
required (Mainga, 2017).
Project Approvals
Project Manager Project Sponsor
Project Client/Owner Other
Project Title: Project Client: Date:
Version:
Project Sponsor: Project
Manager:
File Name: Page x of
y
© 2013 Innovation and Business Industry Skills Council Ltd 1st edition version: 1
Page 5 of 24
Project status
The project will be based on forecasting in which predictions of every single aspect
will be done and evaluation of every single activity will be done in a proper way. The
project will be based on the scheduled who is being prepared by the project manager
on the basis of forecasting and predictions (Liu, 2012). Cost of the project will remain
fixed which is agreed in advance by the project management company and Max
Lionel Reality. Future fluctuations in the government policies and the economy will
not have any impact on the project.
Special provisions
The project will ensure to undertake all the ethical aspects in which assurance will be
made that all the employees working in the workplace will get benefited. The project
will also help in the growth aspects of the society and will provide them the support
required (Mainga, 2017).
Project Approvals
Project Manager Project Sponsor
Project Client/Owner Other
Project Title: Project Client: Date:
Version:
Project Sponsor: Project
Manager:
File Name: Page x of
y
© 2013 Innovation and Business Industry Skills Council Ltd 1st edition version: 1
Page 5 of 24
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

BSBPMG522A Undertake project work Project Planning Templates
Project scope document
In Scope Out of scope
(exclusions)
Assumptions Constraints
Inclusion
related with the
project initiated
by Max Lionel
Reality which
will help the
employees
working at the
workplace in
remaining
informed
related with all
the plans and
policies of the
company and
will help in
reducing all the
internal clashes
(Sheehan,
2008).
The project initiated
by the project
management
company will help in
evaluating the skills
and abilities related
to the work.
Project management
is a typical task
which will help in
managing the things
and will provide a set
direction to the
company in
evaluating all the
aspects related to
team management
and will provide a set
path for managing
the work process.
Time management
aspects will be taken
into consideration
which will help the
project management
team in maintaining
the coordination
among each other.
The assumption
could be made that
the project initiated
will require 4 people
to manage the
coding-related to the
software. 4 up to
date, upgraded
systems will be
required to perform
the task.
Time will be
forecasted for every
single activity and
work will be
managed on the
basis of the
predictions
(Furnham, &
Gunter, 2015).
There are six
constraints which
are attached to the
project initiated
by the company.
These project
constraints are
evaluating a
proper scope for
the end project.
Proper time
management
techniques will be
used by the
project manager
to complete the
project within the
deadlines.
Cost is another
aspect which will
be focused upon
by the project
management
team.
Quality of the
project will also
be taken into
consideration
which will help in
© 2013 Innovation and Business Industry Skills Council Ltd 1st edition version: 1
Page 6 of 24
Project scope document
In Scope Out of scope
(exclusions)
Assumptions Constraints
Inclusion
related with the
project initiated
by Max Lionel
Reality which
will help the
employees
working at the
workplace in
remaining
informed
related with all
the plans and
policies of the
company and
will help in
reducing all the
internal clashes
(Sheehan,
2008).
The project initiated
by the project
management
company will help in
evaluating the skills
and abilities related
to the work.
Project management
is a typical task
which will help in
managing the things
and will provide a set
direction to the
company in
evaluating all the
aspects related to
team management
and will provide a set
path for managing
the work process.
Time management
aspects will be taken
into consideration
which will help the
project management
team in maintaining
the coordination
among each other.
The assumption
could be made that
the project initiated
will require 4 people
to manage the
coding-related to the
software. 4 up to
date, upgraded
systems will be
required to perform
the task.
Time will be
forecasted for every
single activity and
work will be
managed on the
basis of the
predictions
(Furnham, &
Gunter, 2015).
There are six
constraints which
are attached to the
project initiated
by the company.
These project
constraints are
evaluating a
proper scope for
the end project.
Proper time
management
techniques will be
used by the
project manager
to complete the
project within the
deadlines.
Cost is another
aspect which will
be focused upon
by the project
management
team.
Quality of the
project will also
be taken into
consideration
which will help in
© 2013 Innovation and Business Industry Skills Council Ltd 1st edition version: 1
Page 6 of 24

BSBPMG522A Undertake project work Project Planning Templates
fulfilling
requirements of
the company.
Proper estimation
of the resources
should be done
which will help in
managing the
information
technology
project.
Risk analysis is
another constraint
which will be
taken into
consideration by
the project
manager.
Project Title: Project Client: Date:
Version:
Project Sponsor: Project
Manager:
File Name: Page x of
y
© 2013 Innovation and Business Industry Skills Council Ltd 1st edition version: 1
Page 7 of 24
fulfilling
requirements of
the company.
Proper estimation
of the resources
should be done
which will help in
managing the
information
technology
project.
Risk analysis is
another constraint
which will be
taken into
consideration by
the project
manager.
Project Title: Project Client: Date:
Version:
Project Sponsor: Project
Manager:
File Name: Page x of
y
© 2013 Innovation and Business Industry Skills Council Ltd 1st edition version: 1
Page 7 of 24
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

BSBPMG522A Undertake project work Project Planning Templates
Stakeholder analysis
Name Work area Stakeholder type
(client, end-user)
Impact on/by project,
requirements, success
criteria
Owner of Max
Lionel Reality
Managing the
company for
which the project
is initiated.
Internal Help in project
completion aspects
Project
Manager
Project Manager
works on the
projects initiated
by the companies
External Help in managing the
project and fulfilling
requirements
IT Team
Members
Manage all the IT
related works,
remain indulged
in the practices of
developing
coding for the
information
system.
External Will help in managing
technical aspects related
to project
Employees Employees are the
people working
on Max Lionel
Reality company
for whom the
project is being
developed.
Internal Will use the end results
of the project and
provide feedback (Iland,
2013).
Sponsor Sponsors will
provide funding
for the project and
will help in
External Will help in providing
funds for the project.
© 2013 Innovation and Business Industry Skills Council Ltd 1st edition version: 1
Page 8 of 24
Stakeholder analysis
Name Work area Stakeholder type
(client, end-user)
Impact on/by project,
requirements, success
criteria
Owner of Max
Lionel Reality
Managing the
company for
which the project
is initiated.
Internal Help in project
completion aspects
Project
Manager
Project Manager
works on the
projects initiated
by the companies
External Help in managing the
project and fulfilling
requirements
IT Team
Members
Manage all the IT
related works,
remain indulged
in the practices of
developing
coding for the
information
system.
External Will help in managing
technical aspects related
to project
Employees Employees are the
people working
on Max Lionel
Reality company
for whom the
project is being
developed.
Internal Will use the end results
of the project and
provide feedback (Iland,
2013).
Sponsor Sponsors will
provide funding
for the project and
will help in
External Will help in providing
funds for the project.
© 2013 Innovation and Business Industry Skills Council Ltd 1st edition version: 1
Page 8 of 24
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

BSBPMG522A Undertake project work Project Planning Templates
completing the
project.
Governance Governance will
help in managing
the work with
quality and will
help in
developing fair
policies for all the
people.
External Will help in managing
all the fair activities and
will help in dealing with
the market requirements
Risk Analyst Risk analyst will
evaluate all the
risk factors which
could affect the
project progress
in near future.
External Will help in evaluating
all the future risks
attached to the project
and processing the work
in a smooth way.
End Users End users are the
people who will
use the project
and will get
benefited with its
activities (Lock,
2013).
Project Title: Project Client: Date:
Version:
Project Sponsor: Project
Manager:
File Name: Page x of
y
© 2013 Innovation and Business Industry Skills Council Ltd 1st edition version: 1
Page 9 of 24
completing the
project.
Governance Governance will
help in managing
the work with
quality and will
help in
developing fair
policies for all the
people.
External Will help in managing
all the fair activities and
will help in dealing with
the market requirements
Risk Analyst Risk analyst will
evaluate all the
risk factors which
could affect the
project progress
in near future.
External Will help in evaluating
all the future risks
attached to the project
and processing the work
in a smooth way.
End Users End users are the
people who will
use the project
and will get
benefited with its
activities (Lock,
2013).
Project Title: Project Client: Date:
Version:
Project Sponsor: Project
Manager:
File Name: Page x of
y
© 2013 Innovation and Business Industry Skills Council Ltd 1st edition version: 1
Page 9 of 24

BSBPMG522A Undertake project work Project Planning Templates
Communication plan (example)
What Who Purpose When/frequency Type/methods
Initiation
meeting
Project
manager and
Owner of the
company
Purpose is to
gather all the
team members
and indulge in
brainstorming
process
Before Initiating
the project
Meeting
Distribut
e project
initiation
plan
Project
Manager
The project
plan will be
shared with all
the team
members and
the owner of
the company.
At the initial
phase of working
on the main
project.
Meeting and
with the help
of emails and
circulars
Project
kick-off
Project
Manager
Kickoff
meetings will
be scheduled
with all the
stakeholders
attached with
the company.
Every day while
working on the
project
(Mavridis, Gross-
Amblard, and
Miklós, 2016).
Daily Meeting
Status
reports
Project team
members and
IT team
Update
stakeholders on
the progress of
the project.
Status reports
will be shared
weekly by every
single team
member working
on the project.
Reports will be
shared with the
help excel
sheets
© 2013 Innovation and Business Industry Skills Council Ltd 1st edition version: 1
Page 10 of 24
Communication plan (example)
What Who Purpose When/frequency Type/methods
Initiation
meeting
Project
manager and
Owner of the
company
Purpose is to
gather all the
team members
and indulge in
brainstorming
process
Before Initiating
the project
Meeting
Distribut
e project
initiation
plan
Project
Manager
The project
plan will be
shared with all
the team
members and
the owner of
the company.
At the initial
phase of working
on the main
project.
Meeting and
with the help
of emails and
circulars
Project
kick-off
Project
Manager
Kickoff
meetings will
be scheduled
with all the
stakeholders
attached with
the company.
Every day while
working on the
project
(Mavridis, Gross-
Amblard, and
Miklós, 2016).
Daily Meeting
Status
reports
Project team
members and
IT team
Update
stakeholders on
the progress of
the project.
Status reports
will be shared
weekly by every
single team
member working
on the project.
Reports will be
shared with the
help excel
sheets
© 2013 Innovation and Business Industry Skills Council Ltd 1st edition version: 1
Page 10 of 24
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 44
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.