CPCCBC4004A Diploma: Cost Estimation for King House Building Project
VerifiedAdded on 2023/06/09
|10
|1666
|125
Project
AI Summary
This project showcases a student's cost estimation for the construction of a garage and workshop for the King House, adhering to the CPCCBC4004A unit of the Diploma of Building and Construction. The assignment begins with interpreting the site plan, answering questions about the property's features. The core of the project involves developing a detailed cost estimate, using specifications for the construction elements. This includes calculating labour costs, identifying material requirements and their costs, and estimating project costs, including WorkCover, EPA, and waste management fees, as well as overheads and margins. The student provides calculations for excavation, concrete, reinforcement, timber framing, roofing, windows, doors, and plasterboard, culminating in a total project cost, including GST. The assessment demonstrates the student's ability to apply the Cordell Student Building Cost Guide and interpret building plans to produce a comprehensive cost estimate for a construction project.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
1 out of 10