Project Management Plan: Camden Sickle Cell Music Event Analysis
VerifiedAdded on  2023/01/05
|13
|1949
|31
Project
AI Summary
This project management plan outlines the key elements for organizing a music event, focusing on the Camden Sickle Cell and Thalassaemia Service Group. The plan begins with a network diagram detailing tasks, durations, and dependencies, highlighting the critical path for timely completion. A stakeholder analysis identifies key influencers and their impact, followed by a work breakdown structure and organizational chart. The plan also includes a comprehensive risk analysis of potential threats, quality expectations, acceptance criteria, and control measures. Finally, the assignment justifies the use of the waterfall methodology for its structured approach to project management, emphasizing its suitability for gathering requirements and ensuring project success. The plan concludes with a discussion of project management methodologies and provides recommendations for the success of the musical event.

Project management plan
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

TABLE OF CONTENTS
INTRODUCTION...........................................................................................................................1
TASK 1............................................................................................................................................1
Developing a network diagram...................................................................................................1
TASK 2............................................................................................................................................4
Undertaking a stakeholder analysis for this project....................................................................4
TASK 3............................................................................................................................................6
Work Breakdown Structure (WBS) alongside an organizational structure for this music event.
.....................................................................................................................................................6
TASK 4............................................................................................................................................7
Risk Analysis for 20 different risks that could affect your project.............................................7
TASK 5............................................................................................................................................8
Determining what the quality expectation, acceptance criteria, quality specification, and what
measures would be put in place to control the event..................................................................8
TASK 6............................................................................................................................................9
Providing a critical analysis of methodology would be appropriate for this project with proper
justification..................................................................................................................................9
CONCLUSION................................................................................................................................9
REFERENCES..............................................................................................................................11
INTRODUCTION...........................................................................................................................1
TASK 1............................................................................................................................................1
Developing a network diagram...................................................................................................1
TASK 2............................................................................................................................................4
Undertaking a stakeholder analysis for this project....................................................................4
TASK 3............................................................................................................................................6
Work Breakdown Structure (WBS) alongside an organizational structure for this music event.
.....................................................................................................................................................6
TASK 4............................................................................................................................................7
Risk Analysis for 20 different risks that could affect your project.............................................7
TASK 5............................................................................................................................................8
Determining what the quality expectation, acceptance criteria, quality specification, and what
measures would be put in place to control the event..................................................................8
TASK 6............................................................................................................................................9
Providing a critical analysis of methodology would be appropriate for this project with proper
justification..................................................................................................................................9
CONCLUSION................................................................................................................................9
REFERENCES..............................................................................................................................11

INTRODUCTION
Project management plan is considered to be a formal document which helps in defining how the
project has been carried out (Kerzner, 2018). This is useful in outlining the scope, goals, budget,
timelines and key deliverables associated with the budget. Camden Sickle Cell and Thalassaemia
Service Group tends to focus on developing a musical event. This study focuses on developing
network diagram. Stakeholder analysis and risk analysis will be carried out. Also, work
breakdown structure, quality expectation, and methodology used will be examined.
TASK 1
Developing a network diagram.
Task Mode Task Name Duration Start Finish Predecessors
Auto
Scheduled Budget Approval 1 day Mon 9/28/20 Mon 9/28/20
Auto
Scheduled Hire Publicity Director 4 days Tue 9/29/20 Fri 10/2/20 1
Auto
Scheduled Hire Set Designer 5 days Tue 9/29/20 Mon 10/5/20 1
Auto
Scheduled Hire Place For Auditions 7 days Mon 10/5/20 Tue 10/13/20 2
Auto
Scheduled
Advertising To Hire Crew
and Cast 7 days Mon 10/5/20 Tue 10/13/20 2
Auto
Scheduled
Hire Production &
Publicity Crew 3 days Wed 10/14/20 Fri 10/16/20 4,5
Auto
Scheduled Set Designed and Built 5 days Mon 10/19/20 Fri 10/23/20 3,6
Auto
Scheduled Train Production Crew 5 days Mon 10/19/20 Fri 10/23/20 3,6
Auto
Scheduled Auditions To Hire Cast 2 days Wed 10/14/20 Thu 10/15/20 4,5
Auto
Scheduled Cast Rehearsal 10 days Fri 10/16/20 Thu 10/29/20 9
Auto
Scheduled Hire Orchestra 7 days Tue 9/29/20 Wed 10/7/20 1
Auto
Scheduled Music 7 days Thu 10/8/20 Fri 10/16/20 11
Auto
Scheduled
Photograph Cast And
Crew & Collect
Biographies
3 days Mon 10/19/20 Wed 10/21/20 6,9,11
Auto Enter Information Into 1 day Thu 10/22/20 Thu 10/22/20 13
1
Project management plan is considered to be a formal document which helps in defining how the
project has been carried out (Kerzner, 2018). This is useful in outlining the scope, goals, budget,
timelines and key deliverables associated with the budget. Camden Sickle Cell and Thalassaemia
Service Group tends to focus on developing a musical event. This study focuses on developing
network diagram. Stakeholder analysis and risk analysis will be carried out. Also, work
breakdown structure, quality expectation, and methodology used will be examined.
TASK 1
Developing a network diagram.
Task Mode Task Name Duration Start Finish Predecessors
Auto
Scheduled Budget Approval 1 day Mon 9/28/20 Mon 9/28/20
Auto
Scheduled Hire Publicity Director 4 days Tue 9/29/20 Fri 10/2/20 1
Auto
Scheduled Hire Set Designer 5 days Tue 9/29/20 Mon 10/5/20 1
Auto
Scheduled Hire Place For Auditions 7 days Mon 10/5/20 Tue 10/13/20 2
Auto
Scheduled
Advertising To Hire Crew
and Cast 7 days Mon 10/5/20 Tue 10/13/20 2
Auto
Scheduled
Hire Production &
Publicity Crew 3 days Wed 10/14/20 Fri 10/16/20 4,5
Auto
Scheduled Set Designed and Built 5 days Mon 10/19/20 Fri 10/23/20 3,6
Auto
Scheduled Train Production Crew 5 days Mon 10/19/20 Fri 10/23/20 3,6
Auto
Scheduled Auditions To Hire Cast 2 days Wed 10/14/20 Thu 10/15/20 4,5
Auto
Scheduled Cast Rehearsal 10 days Fri 10/16/20 Thu 10/29/20 9
Auto
Scheduled Hire Orchestra 7 days Tue 9/29/20 Wed 10/7/20 1
Auto
Scheduled Music 7 days Thu 10/8/20 Fri 10/16/20 11
Auto
Scheduled
Photograph Cast And
Crew & Collect
Biographies
3 days Mon 10/19/20 Wed 10/21/20 6,9,11
Auto Enter Information Into 1 day Thu 10/22/20 Thu 10/22/20 13
1
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Scheduled Computer
Auto
Scheduled Printing 5 days Fri 10/23/20 Thu 10/29/20 14
Auto
Scheduled
Develop an Advertising
Plan 3 days Mon 10/19/20 Wed 10/21/20 6
Auto
Scheduled Advertising Media 5 days Thu 10/22/20 Wed 10/28/20 16
Auto
Scheduled Orchestra rehearsal 4 days Mon 10/19/20 Thu 10/22/20 12
Auto
Scheduled Order Costumes 2 days Fri 10/16/20 Mon 10/19/20 9
Auto
Scheduled
Costume Parade And
Alterations 3 days Mon 10/26/20 Wed 10/28/20 7,19
Auto
Scheduled Dress Rehearsal 1 day Fri 10/30/20 Fri 10/30/20 8,10,18,20
Auto
Scheduled Performance 8 days Mon 11/2/20 Wed 11/11/20 15,17,21
2
Auto
Scheduled Printing 5 days Fri 10/23/20 Thu 10/29/20 14
Auto
Scheduled
Develop an Advertising
Plan 3 days Mon 10/19/20 Wed 10/21/20 6
Auto
Scheduled Advertising Media 5 days Thu 10/22/20 Wed 10/28/20 16
Auto
Scheduled Orchestra rehearsal 4 days Mon 10/19/20 Thu 10/22/20 12
Auto
Scheduled Order Costumes 2 days Fri 10/16/20 Mon 10/19/20 9
Auto
Scheduled
Costume Parade And
Alterations 3 days Mon 10/26/20 Wed 10/28/20 7,19
Auto
Scheduled Dress Rehearsal 1 day Fri 10/30/20 Fri 10/30/20 8,10,18,20
Auto
Scheduled Performance 8 days Mon 11/2/20 Wed 11/11/20 15,17,21
2
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

The budget approval and hiring public director are considered to be the key activity as per the
critical path. Hiring place for the audition is considered to be as the major reason for the success
of the musical event. The critical path of the study is 1, 2, 4, 5, 9, 10, 21 and 22. This helps in
completing the concert in the shortest possible time.
3
critical path. Hiring place for the audition is considered to be as the major reason for the success
of the musical event. The critical path of the study is 1, 2, 4, 5, 9, 10, 21 and 22. This helps in
completing the concert in the shortest possible time.
3

The budget approval and hiring public director are considered to be the key activity as per the
critical path. Hiring place for the audition is considered to be as the major reason for the success
of the musical event. The critical path of the study is 1, 2, 4, 5, 9, 10, 21 and 22. This helps in
completing the concert in the shortest possible time. The project will be completed within 101
days.
TASK 2
Undertaking a stakeholder analysis for this project.
Stakeholder analysis
Stakeholder Impact Influence
Employees They are highly necessary for
improving the musical
concert. They have medium
degree of impact on the
musical concert.
They largely influence the
musical concert because it the
success of the concert depends
on the task completed on
behalf of employees.
Suppliers They have high degree of
impact on the musical concert.
They influence the musical
concert because the material
and supply is dependent in
them and delay in that largely
4
critical path. Hiring place for the audition is considered to be as the major reason for the success
of the musical event. The critical path of the study is 1, 2, 4, 5, 9, 10, 21 and 22. This helps in
completing the concert in the shortest possible time. The project will be completed within 101
days.
TASK 2
Undertaking a stakeholder analysis for this project.
Stakeholder analysis
Stakeholder Impact Influence
Employees They are highly necessary for
improving the musical
concert. They have medium
degree of impact on the
musical concert.
They largely influence the
musical concert because it the
success of the concert depends
on the task completed on
behalf of employees.
Suppliers They have high degree of
impact on the musical concert.
They influence the musical
concert because the material
and supply is dependent in
them and delay in that largely
4
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

affects the business
performance (Heldman, 2018).
Volunteers They have medium degree of
impact on the musical concert.
They highly influence the
musical concert because they
ensure that all the activities
are carried out in significant
manner.
Attendees They have high degree of
impact on the musical concert.
They largely influence the
musical concert because the
presence and the success of
the concert is dependent on
attendees.
Participants They have high degree of
impact on the musical concert.
They influence the musical
concert because they are the
ones who perform art and sing
and the musical event.
Organiser They have high degree of
impact on the musical concert.
They highly influence the
musical concert because the
funds and success of the
concert is dependent on
organizer.
Project communication plan
Communication Methods Frequency Goal Owner
Project status
report
Calls,
messages and
Emails
Weekly To effectively
review the
project status
and helps in
discussing the
delays and
potential
Project
manager
5
performance (Heldman, 2018).
Volunteers They have medium degree of
impact on the musical concert.
They highly influence the
musical concert because they
ensure that all the activities
are carried out in significant
manner.
Attendees They have high degree of
impact on the musical concert.
They largely influence the
musical concert because the
presence and the success of
the concert is dependent on
attendees.
Participants They have high degree of
impact on the musical concert.
They influence the musical
concert because they are the
ones who perform art and sing
and the musical event.
Organiser They have high degree of
impact on the musical concert.
They highly influence the
musical concert because the
funds and success of the
concert is dependent on
organizer.
Project communication plan
Communication Methods Frequency Goal Owner
Project status
report
Calls,
messages and
Emails
Weekly To effectively
review the
project status
and helps in
discussing the
delays and
potential
Project
manager
5
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

issues
Team stand up Meeting Daily To discuss the
roles and
responsibilities
of the team
members
Project
manager
Project review Meeting Weekly Present project
deliverables
Project
manager
Musical concert
meeting
Meeting Daily Evaluating
what works for
the musical
concert and
what does not.
Project
manager
Task progress
updates
Calls,
messages and
Emails
Daily To share the
progress of the
project on
daily basis
(Fleming, and
Koppelman,
2016,
December).
Project
manager
TASK 3
Work Breakdown Structure (WBS) alongside an organizational structure for this music event.
6
Team stand up Meeting Daily To discuss the
roles and
responsibilities
of the team
members
Project
manager
Project review Meeting Weekly Present project
deliverables
Project
manager
Musical concert
meeting
Meeting Daily Evaluating
what works for
the musical
concert and
what does not.
Project
manager
Task progress
updates
Calls,
messages and
Emails
Daily To share the
progress of the
project on
daily basis
(Fleming, and
Koppelman,
2016,
December).
Project
manager
TASK 3
Work Breakdown Structure (WBS) alongside an organizational structure for this music event.
6

TASK 4
Risk Analysis for 20 different risks that could affect your project.
Risk Likelihood Consequence
1. Personal theft Likely Moderate risk
2. Food poisoning Possible High risk
3. Slip and fall injuries Unlikely Low risk
7
Work breakdown
structure for musical
concert
Risk Analysis for 20 different risks that could affect your project.
Risk Likelihood Consequence
1. Personal theft Likely Moderate risk
2. Food poisoning Possible High risk
3. Slip and fall injuries Unlikely Low risk
7
Work breakdown
structure for musical
concert
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

4. Illicit drug use Likely High risk
5. Violence and fight Possible Moderate risk
6. Fire risk Unlikely Low risk
7. Market risk Rare High risk
8. Supplier risk Unlikely Moderate risk
9. Delay of
performance risk
Unlikely Moderate risk
10. Hazardous risk Rare Moderate risk
11. Market risk Unlikely High risk
12. Government risk Unlikely Moderate risk
13. Property damage Unlikely High risk
14. Financial risk unlikely High risk
15. Mismanagement
risk
Likely Moderate risk
16. Heat exhaustion
risk
Possible High risk
17. Hearing damage Rare High risk
18. Loss for investors unlikely High risk
19. Credit risk Likely Moderate risk
20. Business risk Possible High risk
TASK 5
Determining what the quality expectation, acceptance criteria, quality specification, and what
measures would be put in place to control the event.
Quality expectation: Camden Sickle Cell and Thalassaemia Service Group mainly focuses on
providing the best possible musical concert by hiring top performers. This eventually leads to
greater success to the musical event.
Acceptance criteria: It is liked with the defined and specific set of conditions which is usually
met the key needs of the musical concert. This eventually leads to project deliverables and is
accepted by the attendees (Papke-Shields and Boyer-Wright, 2017). Customer satisfaction
8
5. Violence and fight Possible Moderate risk
6. Fire risk Unlikely Low risk
7. Market risk Rare High risk
8. Supplier risk Unlikely Moderate risk
9. Delay of
performance risk
Unlikely Moderate risk
10. Hazardous risk Rare Moderate risk
11. Market risk Unlikely High risk
12. Government risk Unlikely Moderate risk
13. Property damage Unlikely High risk
14. Financial risk unlikely High risk
15. Mismanagement
risk
Likely Moderate risk
16. Heat exhaustion
risk
Possible High risk
17. Hearing damage Rare High risk
18. Loss for investors unlikely High risk
19. Credit risk Likely Moderate risk
20. Business risk Possible High risk
TASK 5
Determining what the quality expectation, acceptance criteria, quality specification, and what
measures would be put in place to control the event.
Quality expectation: Camden Sickle Cell and Thalassaemia Service Group mainly focuses on
providing the best possible musical concert by hiring top performers. This eventually leads to
greater success to the musical event.
Acceptance criteria: It is liked with the defined and specific set of conditions which is usually
met the key needs of the musical concert. This eventually leads to project deliverables and is
accepted by the attendees (Papke-Shields and Boyer-Wright, 2017). Customer satisfaction
8
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

associated with the event and taking timely feedback is considered to be as the specific
acceptance criteria.
Quality specification: Camden Sickle Cell and Thalassaemia Service Group focuses on
providing the best possible quality services with best quality speaker, protection of the audience
and performers, ensuring quality food and services. This way it helps in gaining the best possible
services related with the musical concert.
Measures to put in place in order to control event: Ensuring that the event is scheduled with
proper tasks on the timely manner. All the necessary measures to control the risk is useful in
controlling the event and leads to greater success of the event.
TASK 6
Providing a critical analysis of methodology would be appropriate for this project with proper
justification.
Waterfall methodology: this methodology will be used for the musical concert because it is an
iterative approach where they focus on effectively delivering the projects throughout the specific
life cycle (Harding, Nelson, and Glover, 2016). This approach is used because it helps in
providing a linear set of project management approach where the need of the customers as well
as the key stakeholders within the musical event is usually gathered at the beginning of the
project. This helps in providing a sequential set of the project using Gantt chart and critical path
to carry out the business with greater accuracy and relevance. This methodology is considered to
be useful because it helps in providing clear set of structure to carry out the music concert in a
successful manner (Heagney, 2016). It is also relevant in determining the goal in a clear manner
and transfer the information in a key relevant manner. It leads to greater success of the musical
concert by Camden Sickle Cell and Thalassaemia Service Group. This is considered to be as one
of the most structured methodology where it helps in planning out the key requirements and
improve the success of the project concert. It also helps in mapping down the key tasks as well as
the sub tasks in order to improve the project life cycle. The key phases of the waterfall model is
requirements, design, implementation, verifying and maintenance.
CONCLUSION
From the conducted study it has been summarized that, employees largely influence the musical
concert because it the success of the concert depends on the task completed on behalf of
9
acceptance criteria.
Quality specification: Camden Sickle Cell and Thalassaemia Service Group focuses on
providing the best possible quality services with best quality speaker, protection of the audience
and performers, ensuring quality food and services. This way it helps in gaining the best possible
services related with the musical concert.
Measures to put in place in order to control event: Ensuring that the event is scheduled with
proper tasks on the timely manner. All the necessary measures to control the risk is useful in
controlling the event and leads to greater success of the event.
TASK 6
Providing a critical analysis of methodology would be appropriate for this project with proper
justification.
Waterfall methodology: this methodology will be used for the musical concert because it is an
iterative approach where they focus on effectively delivering the projects throughout the specific
life cycle (Harding, Nelson, and Glover, 2016). This approach is used because it helps in
providing a linear set of project management approach where the need of the customers as well
as the key stakeholders within the musical event is usually gathered at the beginning of the
project. This helps in providing a sequential set of the project using Gantt chart and critical path
to carry out the business with greater accuracy and relevance. This methodology is considered to
be useful because it helps in providing clear set of structure to carry out the music concert in a
successful manner (Heagney, 2016). It is also relevant in determining the goal in a clear manner
and transfer the information in a key relevant manner. It leads to greater success of the musical
concert by Camden Sickle Cell and Thalassaemia Service Group. This is considered to be as one
of the most structured methodology where it helps in planning out the key requirements and
improve the success of the project concert. It also helps in mapping down the key tasks as well as
the sub tasks in order to improve the project life cycle. The key phases of the waterfall model is
requirements, design, implementation, verifying and maintenance.
CONCLUSION
From the conducted study it has been summarized that, employees largely influence the musical
concert because it the success of the concert depends on the task completed on behalf of
9

employees. They highly influence the musical concert because the funds and success of the
concert is dependent on organizer. Project status report effectively review the project status and
helps in discussing the delays and potential issues. Waterfall methodology providing a linear set
of project management approach where the need of the customers as well as the key stakeholders
within the musical event is usually gathered at the beginning of the project.
10
concert is dependent on organizer. Project status report effectively review the project status and
helps in discussing the delays and potential issues. Waterfall methodology providing a linear set
of project management approach where the need of the customers as well as the key stakeholders
within the musical event is usually gathered at the beginning of the project.
10
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 13
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.