This case study analysis examines a training project, providing a comprehensive overview of project management principles and practices. The analysis covers various aspects of project management including project scope, resource allocation, time management, quality control, and risk assessment. The study explores the different phases of a project, from initiation and planning to implementation and closing, highlighting key considerations at each stage. The report includes an evaluation of the project's performance against its objectives, schedule, budget, and quality standards, along with recommendations for future projects. The analysis also provides insights into critical path activities, cash flow management, and the importance of experienced project managers. Additionally, the case study offers a review of project management methodologies, stakeholder involvement, and the effectiveness of documentation used throughout the project lifecycle, and concludes with recommendations for improvements in future projects.

Running head: CASE STUDY ANALYSIS OF TRAINING PROJECT
Case Study Analysis of Training Project
Name of the Student
Student Number
Unit Number
Assessment Number
Case Study Analysis of Training Project
Name of the Student
Student Number
Unit Number
Assessment Number
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

1CASE STUDY ANALYSIS OF TRAINING PROJECT
Table of Contents
Task 1...............................................................................................................................................2
Question 1....................................................................................................................................2
Question 2....................................................................................................................................2
Question 3....................................................................................................................................3
Question 4....................................................................................................................................3
Task 2...............................................................................................................................................5
Question 1....................................................................................................................................5
Question 2....................................................................................................................................5
Bibliography....................................................................................................................................7
Table of Contents
Task 1...............................................................................................................................................2
Question 1....................................................................................................................................2
Question 2....................................................................................................................................2
Question 3....................................................................................................................................3
Question 4....................................................................................................................................3
Task 2...............................................................................................................................................5
Question 1....................................................................................................................................5
Question 2....................................................................................................................................5
Bibliography....................................................................................................................................7

2CASE STUDY ANALYSIS OF TRAINING PROJECT
Task 1
Question 1
A project could be defined as an activity that has to be performed for the creation of a
unique service or products. A project is also defined as a series of tasks in order to reach up to a
specific outcome. There are certain set of inputs and outputs that would be required for achieving
a certain goal.
The features of a project are:
Scope – It would define the objectives and the topics that would be covered within the
project.
Resource – These could be used for meeting the scope.
Time – This would define the tasks that are to be undertaken.
Quality – It defines the deviation or spread that are allowed during a desired standard.
Risk – It defines the future happening during the definition of project plan and the steps
needed to recover from such situation.
Question 2
Planning and controlling are considered as integral parts within an organization. Both of
these functionalities reinforce with each other. Each of them drive towards the proper kind of
functioning of the organization. The scope of different activities overlap with each other.
Without a proper form of planning, the controlling activities would stand baseless.
There are different tools and techniques that guide the project managers based on
planning and control over the organization. Some planning tools and techniques used within
project management include PERT, CPM, KANBAN, Gantt Chart and many others. The use of
Task 1
Question 1
A project could be defined as an activity that has to be performed for the creation of a
unique service or products. A project is also defined as a series of tasks in order to reach up to a
specific outcome. There are certain set of inputs and outputs that would be required for achieving
a certain goal.
The features of a project are:
Scope – It would define the objectives and the topics that would be covered within the
project.
Resource – These could be used for meeting the scope.
Time – This would define the tasks that are to be undertaken.
Quality – It defines the deviation or spread that are allowed during a desired standard.
Risk – It defines the future happening during the definition of project plan and the steps
needed to recover from such situation.
Question 2
Planning and controlling are considered as integral parts within an organization. Both of
these functionalities reinforce with each other. Each of them drive towards the proper kind of
functioning of the organization. The scope of different activities overlap with each other.
Without a proper form of planning, the controlling activities would stand baseless.
There are different tools and techniques that guide the project managers based on
planning and control over the organization. Some planning tools and techniques used within
project management include PERT, CPM, KANBAN, Gantt Chart and many others. The use of
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

3CASE STUDY ANALYSIS OF TRAINING PROJECT
project management tools would precisely help in the management of projects in an easy and
effective manner.
Question 3
The different stages undergone during the design of a project of commerce are:
Initiation Phase – This is the first stage of the project. Based on this stage, the project
would be initiated and the major deliverables would be set.
Planning Phase – In this stage, the project solution would be developed further. The
necessary steps for meeting the project objectives would be planned.
Implementation Phase – The plan of the project would be put in motion and the
construction of the project would be performed. In this phase, the progress of the project
would be continuously monitored.
Closing Phase – During the completion phase, the emphasis would be made on release of
deliverables to the clients.
Question 4
The top five reasons for choosing an experienced project manager are:
Proper Planning of Project Resources – An experienced project manager would be able
to better plan resources and develop efficient strategy for achieving project goals and
objectives.
Efficient Time Management – The efficient project management would also be stick to
deadlines and deliver the project within the mentioned time-period.
High Quality and Satisfaction – They would also be responsible delivering higher
quality and satisfaction to the clients.
project management tools would precisely help in the management of projects in an easy and
effective manner.
Question 3
The different stages undergone during the design of a project of commerce are:
Initiation Phase – This is the first stage of the project. Based on this stage, the project
would be initiated and the major deliverables would be set.
Planning Phase – In this stage, the project solution would be developed further. The
necessary steps for meeting the project objectives would be planned.
Implementation Phase – The plan of the project would be put in motion and the
construction of the project would be performed. In this phase, the progress of the project
would be continuously monitored.
Closing Phase – During the completion phase, the emphasis would be made on release of
deliverables to the clients.
Question 4
The top five reasons for choosing an experienced project manager are:
Proper Planning of Project Resources – An experienced project manager would be able
to better plan resources and develop efficient strategy for achieving project goals and
objectives.
Efficient Time Management – The efficient project management would also be stick to
deadlines and deliver the project within the mentioned time-period.
High Quality and Satisfaction – They would also be responsible delivering higher
quality and satisfaction to the clients.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

4CASE STUDY ANALYSIS OF TRAINING PROJECT
Efficient Management of Risk and Issues – They would also be responsible for
managing several risks and issues and thus resolve them efficiently. This would help in
proper management of projects.
Efficient Monitoring of Progress – An experienced project manager would be able to
monitor the progress of project in an efficient manner and compare metrics with the plan
created.
Efficient Management of Risk and Issues – They would also be responsible for
managing several risks and issues and thus resolve them efficiently. This would help in
proper management of projects.
Efficient Monitoring of Progress – An experienced project manager would be able to
monitor the progress of project in an efficient manner and compare metrics with the plan
created.

5CASE STUDY ANALYSIS OF TRAINING PROJECT
Task 2
Question 1
a) The activities of the critical path are – A, B, D, F, H and I.
b) The duration of the critical path is 400 days.
Question 2
Cash Flow needed for the completion of the project
1 2 3 4 1 2 3
$0.00
$10.00
$20.00
$30.00
$40.00
$50.00
$60.00
$70.00
$80.00
$90.00
$0.00
$50.00
$100.00
$150.00
$200.00
$250.00
$300.00
$350.00
$400.00
Cost Cumulative Cost
(Fig 1: Diagram 1 for Cash Flow)
(Source: Created by author)
Task 2
Question 1
a) The activities of the critical path are – A, B, D, F, H and I.
b) The duration of the critical path is 400 days.
Question 2
Cash Flow needed for the completion of the project
1 2 3 4 1 2 3
$0.00
$10.00
$20.00
$30.00
$40.00
$50.00
$60.00
$70.00
$80.00
$90.00
$0.00
$50.00
$100.00
$150.00
$200.00
$250.00
$300.00
$350.00
$400.00
Cost Cumulative Cost
(Fig 1: Diagram 1 for Cash Flow)
(Source: Created by author)
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

6CASE STUDY ANALYSIS OF TRAINING PROJECT
(Fig 2: Diagram 1 for Cash Flow)
(Source: Created by author)
(Fig 2: Diagram 1 for Cash Flow)
(Source: Created by author)
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7CASE STUDY ANALYSIS OF TRAINING PROJECT
Bibliography
Fleming, Q.W. and Koppelman, J.M., 2016, December. Earned value project management.
Project Management Institute.
Martinelli, R.J. and Milosevic, D.Z., 2016. Project management toolbox: tools and techniques
for the practicing project manager. John Wiley & Sons.
Nicholas, J.M. and Steyn, H., 2017. Project management for engineering, business and
technology. Routledge.
Walker, A., 2015. Project management in construction. John Wiley & Sons.
Bibliography
Fleming, Q.W. and Koppelman, J.M., 2016, December. Earned value project management.
Project Management Institute.
Martinelli, R.J. and Milosevic, D.Z., 2016. Project management toolbox: tools and techniques
for the practicing project manager. John Wiley & Sons.
Nicholas, J.M. and Steyn, H., 2017. Project management for engineering, business and
technology. Routledge.
Walker, A., 2015. Project management in construction. John Wiley & Sons.
1 out of 8
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.