Casino Network Design Project: Implementing a Network for a Casino

Verified

Added on  2020/02/19

|11
|1126
|63
Project
AI Summary
This project provides a detailed overview of a casino network design, encompassing various aspects of network infrastructure. It outlines the project scope, including the development of an effective information processing system for casino operations. The project details hardware requirements, such as Cisco switches, firewalls, servers, PCs, and routers. The network design is visualized using Netsim, with figures illustrating the configuration across multiple floors. Detailed switch and router configurations are provided, showcasing the setup for each floor. The conclusion emphasizes the importance of a well-designed network for enhancing casino operations and communication. The project includes a bibliography of relevant sources, providing a comprehensive understanding of the networking concepts and technologies involved.
Document Page
Running head: OVERVIEW OF INTERNETWORKING
Student ID: Student Surname: Given Name:
Course: School:
Unit Code: Unit Title:
Due Date: Date Submitted: Campus:
Lecturer: Tutor:
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1OVERVIEW OF INTERNETWORKING
Student Declaration
I/We declare that:
the work contained in this assignment is my/our own work/group work, except where
acknowledgement of sources is made;
certify that this assessment has not been submitted previously for academic credit in this or any
other course;
I/we have read the MIT’s Plagiarism and Academic Misconduct Policy Procedure, and I/we
understand the consequences of engaging in plagiarism;
a copy of the original assignment is retained by me/us and that I/we may be required to submit the
original assignment to the Lecturer and/or Unit Co-ordinator upon request;
I/we have not plagiarised the work of others or participated in unauthorised collaboration when preparing
this assignment.
Student Signature: Date:
Student Name:
Document Page
2OVERVIEW OF INTERNETWORKING
Table of Contents
Project Scope............................................................................................................................. 3
Project hardware requirements.................................................................................................3
Network Design in Netsim......................................................................................................... 6
Switch configuration..................................................................................................................7
Router Configuration................................................................................................................. 9
Conclusion............................................................................................................................... 10
Bibliography............................................................................................................................. 11
Document Page
3OVERVIEW OF INTERNETWORKING
Project Scope
The scope of the project includes the development of the network design in the casino
and it would involve the development of the effective information processing for the
operations of the organization. The development of the network servers are implied for
forming the development of the two servers in the casino and it would form the
implementation of the High Speed Internet Connection for the Casino.
Project hardware requirements
Device: Switch
Quantity: 5
Manufacturer’s Name: Cisco
Series: 6500
Model: 6509E
Features: MTBF: 348,935 hours (Maximum forwarding performance (IPv4): 510 Mbps)
Ports: 16
Device: Firewall
Quantity: NA
Manufacturer’s Name: Cisco
Series: ASA 5500
Model: 5550
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4OVERVIEW OF INTERNETWORKING
Features: Security Context – Up to 50, Throughput: Up to 1.2 Gbps, VPN Throughput: Up to
425 Mbps VPN Throughput: Up to 425 Mbps
Ports: -
Device: Server
Quantity: 5
Manufacturer’s Name: Cisco
Series: ACS
Model: -
Features: Authentication and Authorization protocols
Ports: -
Device: PC
Quantity: 40
Manufacturer’s Name: HP, Dell
Series: -
Model: -
Features: Operating System – Windows and Linux
Document Page
5OVERVIEW OF INTERNETWORKING
Ports: -
Device: Router
Quantity: 1
Manufacturer’s Name: Cisco
Series: 7200
Model: 7206
Features: Ethernet (10BASE-FL) Ports – 30 and Ethernet (10BASE-FL) Ports - 48
Ports: 30 and 48
Document Page
6OVERVIEW OF INTERNETWORKING
Network Design in Netsim
Figure 1: Network design for casino
(Source: Created by Author)
The figure had depicted the use of the 5 CISCO 6509E Switches for the development of
the network configuration for the Casino. The WiSM stands for Wireless Controller in the
network connection of the Casino that has been acting throughout the 300 access points. The
single IP configuration in the shared network had been helpful for the solution of the
congestion in the network developed for the Casino.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7OVERVIEW OF INTERNETWORKING
Switch configuration
Figure 2: Showing Ground floor switch configuration
(Source: Created by author)
Figure 3: Showing 1st floor switch configuration
Document Page
8OVERVIEW OF INTERNETWORKING
(Source: Created by author)
Figure 4: Showing 2nd floor switch configuration
(Source: Created by author)
Figure 5: Showing 3rd floor switch configuration
Document Page
9OVERVIEW OF INTERNETWORKING
(Source: Created by author)
Figure 6: Showing 4th floor switch configuration
(Source: Created by author)
Router Configuration
Figure 6: Showing router configuration
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10OVERVIEW OF INTERNETWORKING
(Source: Created by author)
Conclusion
The Casino had focused on the deployment of the technical and practical knowledge of
networking for improving their operations. The development of the network system in the
casino would form the development of the effective and smart network infrastructure
development of the organization. The implementation of the network server would tend to
form the high class network configuration for the 5 floors of Casino and each floor having 40
rooms along with the lobby. The 25 total staffs would carry on the use of the effective and high
speed network connection for deploying the improved services in the organization. The
network point in each of the floor would be developed for installing a guest PC in the Casino.
The network connection would be helpful for forming the effective communication in the
Casino.