This report presents a system analysis and design for the ChemExec case study. It covers the implementation and project management aspects, including deployment strategies such as phased conversion and a risk management analysis. The risk assessment identifies potential issues related to recorded orders, new order entries, and sensitive patient information, proposing countermeasures like VPNs and encryption. The report also references the assignment brief, which requested a design class diagram for specific use cases ('Enter New Order,' 'Create Case Manifest,' and 'Record Order Fulfillment'), though the diagram itself is not included in this excerpt. The report is based on the provided ChemExec case study, analyzing the business's needs and suggesting appropriate technical and procedural solutions. The report also includes a bibliography of relevant sources.
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Running head: SYSTEM ANALYSIS AND DESIGN
System Analysis and Design: ChemExec case study
Name of the Student:
Name of the University:
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1SYSTEM ANALYSIS AND DESIGN
5. Implementation and project management
a. Deployment strategy
The ChemExec operates in many small health care delivery organizations and in the in
house pharmacy as well. The company is willing to improve the operational and functional
activities, while implementation these facilities the foe the healthcare and patient care. Different
deployment strategies are available and based on the type and feature of the project, executives
should choose the most suitable deployment strategy.
The process of system conversion is referred to as a changing process uses to make
conversion of an old system to a new one. Four different conversion methods such as parallel
conversion, direct conversion, phased conversion and pilot system are there, used to convert the
system from an older to new.
Parallel conversion: This approach allows the users to learn about new system. Under
this approach the users continuously operates the older system in an accustomed manner
however the new system is also being used by the users. This approach is very safe and error free
as well.
Phased conversion: the phased conversion method is a process where new system is
gradually introduced by the business organization. Whenever installations of new system become
difficult all at a time this approach is applicable. The reasons for these issues include late arrival,
lack of training among the users, overrunning cost etc.
Document Page
2SYSTEM ANALYSIS AND DESIGN
Direct conversion: The process of direct conversion is direct change over method which
can successfully convert older system to a new system. Even if no fall back method is available
those times also this method forces the uses to develop the new system.
After analyzing ChemExec case scenario it can be said that in order to implement the
new system the deployment strategy that the company should follow is Phased conversion. It
includes split of new information system into small modules. Though, it needs lots of time for
the implementation of a full system.
Figure 1: Phased conversion
(Source: Elmhedwi et al. 2015, pp-5)
b. Risk management analysis
In order to gain commercial revenue and competitive advantages project management
application and prcatices are very essential. ChemExec, a privately owned pharmacy business
has trading 40 years ago in Melbourne. The risk management plan identifies the impact,
likelihood and overall priority of the risks. Based on the priority and impact the project manager
of ChemExec should implement accurate asset management program at the project initiation and
Document Page
3SYSTEM ANALYSIS AND DESIGN
progress period. The risk management plans developed for this case scenario are elaborated in
the below section:
Asset Risk Impact Control/countermeasures Likelihood
Recorded
orders
If proper security
measures are not
adopted by the company,
then recorded orders
may not be properly
managed.
High The network engineer of the
company should use VPN to
restrict unwanted information
flow
Possible
Entry of
new order
The system operators are
allowed to manage new
entry of information
therefore, the new orders
are needed to be well
managed by the project
managers to avoid
information hacking
High Encryption mechanism is
needed to be installed by the
project managers to keep data
secured from the unwanted
external users.
Rare
Nurse’s
records
and
medical
records
The financial and
personnel details of the
nurses and other services
offered by the pharmacy
are needed to be secured.
If proper security
Medium The project executive is needed
to install proper security
mechanism to make sure that no
data are being hacked or
hijacked by the external users.
Unlikely
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
4SYSTEM ANALYSIS AND DESIGN
mechanism are not
measured by the project
managers and project
team members then
information would be
hacked by the unwanted
users. Theses
information can also be
misused.
Document Page
5SYSTEM ANALYSIS AND DESIGN
Bibliography
Duggan, J.M., Eichelberger, B.A., Ma, S., Lawler, J.J. and Ziv, G., 2015. Informing management
of rare species with an approach combining scenario modeling and spatially explicit risk
assessment. Ecosystem Health and Sustainability, 1(6), pp.1-18.
Elmhedwi, T.R., Elmabrouk, S.K. and Sherif, M.A., 2015, March. Practical risk management
plan of Wi-Fi network deployment; case study. In 2015 International Conference on Industrial
Engineering and Operations Management (IEOM)(pp. 1-10). IEEE.
Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Larson, E.W. and Gray, C.F., 2017. Project management: The managerial process. McGraw-Hill
Education.
Milosevic, D.Z. and Martinelli, R.J., 2016. Project management toolbox: tools and techniques
for the practicing project manager. John Wiley & Sons.
chevron_up_icon
1 out of 6
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]