This report presents a detailed analysis of project preliminaries and trade breakups within a civil engineering context. The assignment focuses on the initial stages of a construction project, specifically addressing groundwork. It emphasizes the importance of site visits and accurate cost estimation in tendering, providing guidelines for contractors. The report includes a trade breakup report, detailing items such as site clearing, excavation, filling, and anti-termite treatment, with corresponding unit costs and quantities. Rate breakups for specific items are also provided, explaining the methodology for determining costs based on complexity, work size, and volume. The document incorporates figures illustrating topography and section cuts to aid in calculating cut and fill areas, crucial for site leveling. The report also includes a bibliography of relevant resources, covering topics such as tendering processes, building quantities, and estimating techniques. The report provides a comprehensive overview of the key considerations and methodologies involved in preparing a building estimate.