This project management assignment outlines the development of a commercial office building at 10 Kumutoto, Wellington. It begins with an introduction to the project, detailing the site location, building specifications (5 floors, 300 sq meters, sea-side location, parking, and amenities). The purpose is to guide the client and establish a contractual relationship. The assignment includes a site investigation, project risk assessment (legal and political), and estimated costs. The project is broken down into five phases: planning and initiation, design, construction, testing and evaluation, and implementation, with corresponding cost breakdowns. Ethical implications are addressed, focusing on worker well-being, public and legal obligations, and client interests. An engagement letter is provided, summarizing the project, outlining services, costs, and ethical considerations. The document covers various aspects of project management, from site analysis and cost estimation to ethical considerations and client communication, providing a comprehensive overview of the construction project.