This project management assignment details the "Installation of Computerized E-Ticketing System for RALS." The project outlines the development of an electronic ticketing system for the Riverina Agriculture and Lifestyle Show, including team roles, responsibilities, and a comprehensive project charter. The report covers project phases, including planning, initialization, system development, and testing. It also includes a communication plan, learning cycles, and a reflection on the project's application of project management concepts, and the importance of communication. The assignment provides a detailed breakdown of each stage, from initial documentation to the final project conclusion, demonstrating the integration of various project management tools and techniques to ensure the successful implementation of the e-ticketing system. The document also includes references to support the project's methodology and findings.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.

Running head: PROJECT MANAGEMNT
Project Management
Name of the Student:
Student ID:
Name of the University:
Author’s note:
Project Management
Name of the Student:
Student ID:
Name of the University:
Author’s note:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

1PROJECT MANAGEMNT
Table of Contents
1. Part One.......................................................................................................................................2
1.1 Project Name/Team/Description...........................................................................................2
1.2 Team Charter.........................................................................................................................4
2. Part Two.......................................................................................................................................7
2.1 Learning Cycles.....................................................................................................................7
3. Part Three.....................................................................................................................................8
3.1 Communication Plan.............................................................................................................8
Part Four..........................................................................................................................................8
4.1 Reflection...............................................................................................................................8
References......................................................................................................................................10
Table of Contents
1. Part One.......................................................................................................................................2
1.1 Project Name/Team/Description...........................................................................................2
1.2 Team Charter.........................................................................................................................4
2. Part Two.......................................................................................................................................7
2.1 Learning Cycles.....................................................................................................................7
3. Part Three.....................................................................................................................................8
3.1 Communication Plan.............................................................................................................8
Part Four..........................................................................................................................................8
4.1 Reflection...............................................................................................................................8
References......................................................................................................................................10

2PROJECT MANAGEMNT
1. Part One
1.1 Project Name/Team/Description
The name of the undertaking project is “Installation of Computerized E-Ticketing System
for RALS" and the advancement of the project would tend to shape the viable framework
suggestion in the association of the operations. The electronic framework for versatile ticketing
would help the association of Riverina Agriculture and Lifestyle Show. The portable ticketing
would help in framing the successful control of operations for the advancement of the operations.
The project team consists of the following team members,
Name of the Person Team Responsibilities
John Lauren Documenter ï‚· Submission of the documents
ï‚· Making initial documents
ï‚· Making final reports
ï‚· Creating Project Charter
ï‚· Submission of the reports
Jenny Fishnet Project Manager ï‚· Design approval
ï‚· Initialization Meetings
ï‚· Reviewing the plan developed
ï‚· Signing off the documents
ï‚· Signing off the reports
ï‚· Plan approval
Carmella Augustine Planner ï‚· Completing the plan
ï‚· Making plan outline
ï‚· Selecting planning methodology
1. Part One
1.1 Project Name/Team/Description
The name of the undertaking project is “Installation of Computerized E-Ticketing System
for RALS" and the advancement of the project would tend to shape the viable framework
suggestion in the association of the operations. The electronic framework for versatile ticketing
would help the association of Riverina Agriculture and Lifestyle Show. The portable ticketing
would help in framing the successful control of operations for the advancement of the operations.
The project team consists of the following team members,
Name of the Person Team Responsibilities
John Lauren Documenter ï‚· Submission of the documents
ï‚· Making initial documents
ï‚· Making final reports
ï‚· Creating Project Charter
ï‚· Submission of the reports
Jenny Fishnet Project Manager ï‚· Design approval
ï‚· Initialization Meetings
ï‚· Reviewing the plan developed
ï‚· Signing off the documents
ï‚· Signing off the reports
ï‚· Plan approval
Carmella Augustine Planner ï‚· Completing the plan
ï‚· Making plan outline
ï‚· Selecting planning methodology

3PROJECT MANAGEMNT
Alfred John Designer ï‚· Selecting design platform
ï‚· Making design outline
ï‚· Completing the design made
Andrew Richards IT Engineer ï‚· Security Testing
ï‚· Design approval
ï‚· Functionality Testing
ï‚· System is developed
ï‚· Reviewing the design developed
Jessica Lauren System Developer ï‚· Making and Testing the interface
Robert Lewis Network Analyst ï‚· Network Connection
Sam Smith Database Administrator ï‚· Building the Database
Anthony Marsh Programmer ï‚· Programming the Applications
Jack Smith Coder ï‚· Coding the Functions
Table 1: Project Team Members and their Responsibilities
Description of the Project: The name of the undertaking project is “Installation of
Computerized E-Ticketing System for RALS " and the advancement of the project would tend to
shape the viable framework suggestion in the association of the operations. The electronic
framework for versatile ticketing would help the association of Riverina Agriculture and
Lifestyle Show. The portable ticketing would help in framing the successful control of operations
for the advancement of the operations. The project instatement comprises of making beginning
archives, making project sanction, introduction gatherings, accommodation of the reports, and
closing down the records. The project arranging comprises of the choosing arranging strategy,
Alfred John Designer ï‚· Selecting design platform
ï‚· Making design outline
ï‚· Completing the design made
Andrew Richards IT Engineer ï‚· Security Testing
ï‚· Design approval
ï‚· Functionality Testing
ï‚· System is developed
ï‚· Reviewing the design developed
Jessica Lauren System Developer ï‚· Making and Testing the interface
Robert Lewis Network Analyst ï‚· Network Connection
Sam Smith Database Administrator ï‚· Building the Database
Anthony Marsh Programmer ï‚· Programming the Applications
Jack Smith Coder ï‚· Coding the Functions
Table 1: Project Team Members and their Responsibilities
Description of the Project: The name of the undertaking project is “Installation of
Computerized E-Ticketing System for RALS " and the advancement of the project would tend to
shape the viable framework suggestion in the association of the operations. The electronic
framework for versatile ticketing would help the association of Riverina Agriculture and
Lifestyle Show. The portable ticketing would help in framing the successful control of operations
for the advancement of the operations. The project instatement comprises of making beginning
archives, making project sanction, introduction gatherings, accommodation of the reports, and
closing down the records. The project arranging comprises of the choosing arranging strategy,
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

4PROJECT MANAGEMNT
making arrangement plot, looking into the arrangement created, finishing the arrangement, and
plan endorsement. The e-ticket framework improvement would include the planning stage
(choosing outline stage, influencing configuration to diagram, checking on the outline created,
finishing the plan made, and outline endorsement), framework advancement (making the
interface, assembling the database, coding the capacities, programming the applications, organize
association, and framework is produced), and testing stage (interface testing, usefulness testing,
and security testing). The task documentation comprises making last reports, accommodation of
the reports, and closing down the reports. The last action of the task is the conclusion of the
project or undertaking is shut.
1.2 Team Charter
1.2.1 Skills and Knowledge Inventory
The undertaking project of “Installation of Computerized E-Ticketing System for RALS"
would tend to shape the viable framework suggestion in the association of the operations. The
electronic framework for versatile ticketing would help the association of Riverina Agriculture
and Lifestyle Show. The portable ticketing would help in framing the successful control of
operations for the advancement of the operations. The project team would require a number of
activities and processes that can be tendered for implying the effective communication and it
would involve the development of the system functions for RALS. The skills required by the
project team members are,
Name of
Member
Role in the
project
Skills and knowledge
John Lauren Documenter Powerful utilization of the documentation procedure and
legitimate making of the archives
making arrangement plot, looking into the arrangement created, finishing the arrangement, and
plan endorsement. The e-ticket framework improvement would include the planning stage
(choosing outline stage, influencing configuration to diagram, checking on the outline created,
finishing the plan made, and outline endorsement), framework advancement (making the
interface, assembling the database, coding the capacities, programming the applications, organize
association, and framework is produced), and testing stage (interface testing, usefulness testing,
and security testing). The task documentation comprises making last reports, accommodation of
the reports, and closing down the reports. The last action of the task is the conclusion of the
project or undertaking is shut.
1.2 Team Charter
1.2.1 Skills and Knowledge Inventory
The undertaking project of “Installation of Computerized E-Ticketing System for RALS"
would tend to shape the viable framework suggestion in the association of the operations. The
electronic framework for versatile ticketing would help the association of Riverina Agriculture
and Lifestyle Show. The portable ticketing would help in framing the successful control of
operations for the advancement of the operations. The project team would require a number of
activities and processes that can be tendered for implying the effective communication and it
would involve the development of the system functions for RALS. The skills required by the
project team members are,
Name of
Member
Role in the
project
Skills and knowledge
John Lauren Documenter Powerful utilization of the documentation procedure and
legitimate making of the archives

5PROJECT MANAGEMNT
Jenny Fishnet Project Manager Administration, Leadership, Communication, and Marketing
Strategy
Carmella
Augustine
Planner Utilization of arrangement functions and successful
arrangement improvement
Alfred John Designer Making compelling plan of the framework and utilizing
successful stage for planning
Andrew
Richards
IT Engineer Inclined to deal with the exercises of the framework
advancement and execution
Jessica
Lauren
System
Developer
Building up the viable framework for e-ticket era for
Riverina Agriculture and Lifestyle Show
Sam Smith Database
Administrator
Influencing proper database for the e-to ticket framework
and incorporating operations of Riverina Agriculture and
Lifestyle Show.
Table 2: Project Team Member and Required Skills
1.2.2 Roles and Responsibilities
Name of Member in the project Roles and Responsibilities
John Lauren (Documenter) Making initial documents
Creating Project Charter
Submission of the documents
Making final reports
Submission of the reports
Jenny Fishnet (Project Manager) Initialization Meetings
Signing off the documents
Reviewing the plan developed
Plan approval
Design approval
Signing off the reports
Carmella Augustine (Planner) Selecting planning methodology
Jenny Fishnet Project Manager Administration, Leadership, Communication, and Marketing
Strategy
Carmella
Augustine
Planner Utilization of arrangement functions and successful
arrangement improvement
Alfred John Designer Making compelling plan of the framework and utilizing
successful stage for planning
Andrew
Richards
IT Engineer Inclined to deal with the exercises of the framework
advancement and execution
Jessica
Lauren
System
Developer
Building up the viable framework for e-ticket era for
Riverina Agriculture and Lifestyle Show
Sam Smith Database
Administrator
Influencing proper database for the e-to ticket framework
and incorporating operations of Riverina Agriculture and
Lifestyle Show.
Table 2: Project Team Member and Required Skills
1.2.2 Roles and Responsibilities
Name of Member in the project Roles and Responsibilities
John Lauren (Documenter) Making initial documents
Creating Project Charter
Submission of the documents
Making final reports
Submission of the reports
Jenny Fishnet (Project Manager) Initialization Meetings
Signing off the documents
Reviewing the plan developed
Plan approval
Design approval
Signing off the reports
Carmella Augustine (Planner) Selecting planning methodology

6PROJECT MANAGEMNT
Making plan outline
Completing the plan
Alfred John (Designer) Selecting design platform
Making design outline
Completing the design made
Andrew Richards (IT Engineer) Reviewing the design developed
Design approval
System is developed
Functionality Testing
Security Testing
Jessica Lauren (System Developer) Making the interface
Interface Testing
Coding the Functions
Programming the Applications
Network Connection
Sam Smith (Database Administrator) Building the Database
Table 3: Project team member and their role in project
1.2.3 Team Communication
The correspondence of the undertaking group and partners ought to be conceivable by
using the best possible meetings, reports, and email discourse. The diverse methodologies for the
correspondence would be valuable for confining the mix of the operations and it would achieve
moulding the issue in organizing the operations of the ticket change structure. The
correspondence of the meeting would be recommended for the progression of the operations and
Making plan outline
Completing the plan
Alfred John (Designer) Selecting design platform
Making design outline
Completing the design made
Andrew Richards (IT Engineer) Reviewing the design developed
Design approval
System is developed
Functionality Testing
Security Testing
Jessica Lauren (System Developer) Making the interface
Interface Testing
Coding the Functions
Programming the Applications
Network Connection
Sam Smith (Database Administrator) Building the Database
Table 3: Project team member and their role in project
1.2.3 Team Communication
The correspondence of the undertaking group and partners ought to be conceivable by
using the best possible meetings, reports, and email discourse. The diverse methodologies for the
correspondence would be valuable for confining the mix of the operations and it would achieve
moulding the issue in organizing the operations of the ticket change structure. The
correspondence of the meeting would be recommended for the progression of the operations and
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

7PROJECT MANAGEMNT
it would construe the capable trade of the operations. The strategies of the communication are
explained below,
Meetings: The meetings would be created for passing on the headway of the operations
of the affiliation. The fruitful use the meetings would be recommended for saving the operations
of the affiliation. The meetings would be helpful for the headway of the operations would be
derived for moulding the convincing and recommended in the operations. The meetings would
be recommended for the forming the effective part in the sending of the operations.
Reports: The reports would be recommended for joining the operations would be derived
for the use of the operations in the affiliation. The operations would be construed for planning
the operations of the affiliation. The change of the blend would shape the progression of the
compromise would help in encircling the operational getting ready of the change.
Email Conversation: The email exchange would help in confining the change of the
operations. The headway would incorporate the relationship of the operations would incorporate
the change of operations would recommend the capable method of blend. The email talk would
help in forming the consideration of the operations.
2. Part Two
2.1 Learning Cycles
Duration Project Phase Involved
Person
Organizer Communication
method
1st Week The task arranging comprises of
the choosing arranging technique,
making arrangement layout,
exploring the arrangement created,
finishing the arrangement, and plan
IT engineer IT engineer Emails
it would construe the capable trade of the operations. The strategies of the communication are
explained below,
Meetings: The meetings would be created for passing on the headway of the operations
of the affiliation. The fruitful use the meetings would be recommended for saving the operations
of the affiliation. The meetings would be helpful for the headway of the operations would be
derived for moulding the convincing and recommended in the operations. The meetings would
be recommended for the forming the effective part in the sending of the operations.
Reports: The reports would be recommended for joining the operations would be derived
for the use of the operations in the affiliation. The operations would be construed for planning
the operations of the affiliation. The change of the blend would shape the progression of the
compromise would help in encircling the operational getting ready of the change.
Email Conversation: The email exchange would help in confining the change of the
operations. The headway would incorporate the relationship of the operations would incorporate
the change of operations would recommend the capable method of blend. The email talk would
help in forming the consideration of the operations.
2. Part Two
2.1 Learning Cycles
Duration Project Phase Involved
Person
Organizer Communication
method
1st Week The task arranging comprises of
the choosing arranging technique,
making arrangement layout,
exploring the arrangement created,
finishing the arrangement, and plan
IT engineer IT engineer Emails

8PROJECT MANAGEMNT
endorsement.
2nd
Week
The project initialization consists
of making initial documents,
creating project charter,
initialization meetings, submission
of the documents, and signing off
the documents.
System
Analyst
System
Analyst
Reports
3rd
Week
The undertaking documentation
comprises making last reports,
accommodation of the reports, and
closing down the reports.
Documenter Documenter Meetings
4th Week The e-ticket system development
would involve the designing phase
(selecting design platform, making
design outline, reviewing the
design developed, completing the
design made, and design approval),
system development (making the
interface, building the database,
coding the functions, programming
the applications, network
connection, and system is
developed), and testing phase
(interface testing, functionality
testing, and security testing).
Project
Manager
Project
Manager
Telephonic
Conversation
3. Part Three
3.1 Communication Plan
Who What Why When How
IT engineer Analyst and
Specification of the
system
For developing the
initial documents of
the project
Making of
the
documents
Emails
System
Analyst
Initialization and
Conceptualization of
the project
For initiating the
project operations
At the
start of the
project
Reports
Documenter Charter Development
of the project
For ease of
operations
At the
planning
phase of
Meetings
endorsement.
2nd
Week
The project initialization consists
of making initial documents,
creating project charter,
initialization meetings, submission
of the documents, and signing off
the documents.
System
Analyst
System
Analyst
Reports
3rd
Week
The undertaking documentation
comprises making last reports,
accommodation of the reports, and
closing down the reports.
Documenter Documenter Meetings
4th Week The e-ticket system development
would involve the designing phase
(selecting design platform, making
design outline, reviewing the
design developed, completing the
design made, and design approval),
system development (making the
interface, building the database,
coding the functions, programming
the applications, network
connection, and system is
developed), and testing phase
(interface testing, functionality
testing, and security testing).
Project
Manager
Project
Manager
Telephonic
Conversation
3. Part Three
3.1 Communication Plan
Who What Why When How
IT engineer Analyst and
Specification of the
system
For developing the
initial documents of
the project
Making of
the
documents
Emails
System
Analyst
Initialization and
Conceptualization of
the project
For initiating the
project operations
At the
start of the
project
Reports
Documenter Charter Development
of the project
For ease of
operations
At the
planning
phase of
Meetings

9PROJECT MANAGEMNT
project
Project
Manager
Needs realization of
the Globex
organization
For development of
the project success
At the
project
operation
phase
Telephonic
Conversation
Part Four
4.1 Reflection
The assignment had covered the analysis of the project management concepts and
visualization for implying the effective and improved processing of the operations. I have done
the project with two other friends of mine and it is a group project. Hence, the group project
would require the use of the effective and constant communication with the team members. Our
issues and problems were resolved by using the improved communication and action plans. We
had to convey our problems and work together for bringing out the solutions for the implication
of the effective processes. The study would also help us in forming the efficient plan of
operations to form the benefit of the operations.
project
Project
Manager
Needs realization of
the Globex
organization
For development of
the project success
At the
project
operation
phase
Telephonic
Conversation
Part Four
4.1 Reflection
The assignment had covered the analysis of the project management concepts and
visualization for implying the effective and improved processing of the operations. I have done
the project with two other friends of mine and it is a group project. Hence, the group project
would require the use of the effective and constant communication with the team members. Our
issues and problems were resolved by using the improved communication and action plans. We
had to convey our problems and work together for bringing out the solutions for the implication
of the effective processes. The study would also help us in forming the efficient plan of
operations to form the benefit of the operations.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

10PROJECT MANAGEMNT
References
Jin, Y., Wang, S., and Hu, Q. (2015). Contract type and decision right of sales promotion in
supply chain management with a capital constrained retailer. European Journal of
Operational Research, 2402, 415-424.
Ko, D. G., and Kirsch, L. J. (2017). The hybrid IT project manager: One foot each in the IT and
business domains. International Journal of Project Management, 353, 307-319.
Larson, E. W., and Gray, C. (2013). Project Management: The Managerial Process with MS
Project. McGraw-Hill.
lo Storto, C. (2014). Benchmarking operational efficiency in the integrated water service
provision: does contract type matter?. Benchmarking: An International Journal, 216,
917-943.
Mahadevan, L., Kettinger, W. J., and Meservy, T. O. (2015). Running on Hybrid: Control
Changes when Introducing an Agile Methodology in a Traditional" Waterfall" System
Development Environment. CAIS, 36, 5.
Martinelli, R. J., and Milosevic, D. Z. (2016). Project management toolbox: tools and techniques
for the practicing project manager. John Wiley and Sons.
Roberts, M., Cowart, S., and Campbell, M. (2015). U.S. Patent No. 9,043,744. Washington, DC:
U.S. Patent and Trademark Office.
References
Jin, Y., Wang, S., and Hu, Q. (2015). Contract type and decision right of sales promotion in
supply chain management with a capital constrained retailer. European Journal of
Operational Research, 2402, 415-424.
Ko, D. G., and Kirsch, L. J. (2017). The hybrid IT project manager: One foot each in the IT and
business domains. International Journal of Project Management, 353, 307-319.
Larson, E. W., and Gray, C. (2013). Project Management: The Managerial Process with MS
Project. McGraw-Hill.
lo Storto, C. (2014). Benchmarking operational efficiency in the integrated water service
provision: does contract type matter?. Benchmarking: An International Journal, 216,
917-943.
Mahadevan, L., Kettinger, W. J., and Meservy, T. O. (2015). Running on Hybrid: Control
Changes when Introducing an Agile Methodology in a Traditional" Waterfall" System
Development Environment. CAIS, 36, 5.
Martinelli, R. J., and Milosevic, D. Z. (2016). Project management toolbox: tools and techniques
for the practicing project manager. John Wiley and Sons.
Roberts, M., Cowart, S., and Campbell, M. (2015). U.S. Patent No. 9,043,744. Washington, DC:
U.S. Patent and Trademark Office.
1 out of 11
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024  |  Zucol Services PVT LTD  |  All rights reserved.