This assignment solution details a concrete take-off for the footings and foundation wall of the Garage Area (Rooms 100) of the Huron County Ambulance Station. The solution includes a take-off list identifying required items, and a quantity sheet calculating concrete, forming, reinforcing steel, and other associated quantities. Calculations consider concrete strength (25mpa), reinforcing bar placement, and dimensions derived from provided drawings and specifications. The take-off covers continuous footings and foundation walls, detailing the supply and placement of concrete, formwork, and reinforcing steel, with considerations for chamfers and insulation. The solution demonstrates the process of quantity surveying for concrete work, including the use of conversion factors and unit measurements.
Document Page
Assignment #2
CONS1010
Introduction to Cost Estimating
Measuring Concrete
Name:
Student No.:
Huron County Ambulance Station
Do a take-off of the concrete footings and foundation wall of the Garage Area of the building. (Area encompassing
Rooms 100).
Concrete is 25mpa strength and is purchased in cubic meters.
For the purposes of this assignment, assume there are 2 rows of 15M reinforcing bars in the footing and there are 2
rows of 15M reinforcing bars at the bottom and the top of the foundation wall.
Start your take-off by making a list of all the items that need to be identified.
Below you will find a sheet to be used to make your list and a Quantity Sheet to be used to do your take-off.
Be sure you have the conversion sheet handy for doing this activity and all other activities and assignments in the
course.
The 4 basic take-off categories for each element (Footings, Foundations, Slab-on-Grade, etc) of concrete work are;
1. Supply & Place Concrete
2. Forming & Stripping of the Formwork
3. Supply & Placing Reinforcing Steel
4. Miscellaneous Items Associated with Concrete Work
The diagram above shows the section of footing and foundation wall.
1
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Project: Huron County Ambulance Station Element/Trade: Footing and foundation wall
By: NAME Reference: 2538-06
Date: July 10, 2006 Other:
TAKE-OFF LIST
CODE Description Check/Complete
Continuous footing
Supply and place concrete X
Form and Strip footing X
Supply and place rebar 15M bars, 2 rows X
Form keyway X
Foundation wall
Supply & place concrete X
Form & strip wall X
Supply & place rebar 15M bars, 4 rows X
1” chamfer at top wall X
2” rigid insulation sandwich wall X
2” rigid insulation set on inside face of wall X
Prjt: Huron County Ambulance Station QS/QUANTITY SHEET Page: 1
By: NAME Element/Trade: Footing and Foundation wall of 1
Date: July 10, 2006 Reference: 2538-06
No.: B2538-06 Other:
Type: Bill of Quantities Checked:
DIMENSIONS (m)
2
Document Page
Description No. Length Width Height/Depth Conversion Quantity UOM
FORWARD FROM PAGE:
1
Continuous footings
2
Length 36’
3’’+50’7’’+50’7’’=129’3’’=137.42’
3
Supply & place concrete footings 1 137.42 2 0.83 0.028 6.39 CM
4
5
Form & Strip footings 2 137.42 1.00 274.84 SFCA
6
*Note Quantity is 2 because there are
7
2 sides to the forms to make a total
8
Of the square feet of contact area.
9
Height/depth is 1’-0” because in
10
Forming you never use less than 1’-0”
11
12
Supply & place rebar-2 rows 15M bars 2 137.42 1.055 289.96 LBS
13
14
Form keyway 1 137.42 137.42 LF
15
16
Foundation Wall
17
Length 36’
3’’+50’7’’+50’7’’=129’3’’=137.42’
18
Supply & place concrete wall 1 137.42 0.67 3.83 0.028 9.87 CM
19
Form & strip wall 2 137.42 3.83 1052.64 SFCA
20
Supply & place 15M rebar-4 rows 4 137.42 1.055 579.91 LBS
21
22
1” chamfer strip top of wall 1 137.42 137.42 LF
23
24
25
2” rigid insulation inside face of wall 1 137.42 3.50 480.97 SF
26
2” rigid insulation sandwich wall 1 137.42 2.00 274.84 SF
PAGE TOTAL
3
Document Page
Description of dimensions of room 100
Footing details showing the values of breadth and height.
Foundation wall details
4
50’7’’
36’3’’
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
References
Pratt, D., 2018. Fundamentals of construction estimating. Cengage Learning, pp.21-135.
5
chevron_up_icon
1 out of 5
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]