CONS1010: Carpentry Take-Off for Huron County Ambulance Station
VerifiedAdded on 2022/10/15
|8
|1179
|162
Homework Assignment
AI Summary
This document presents a detailed carpentry take-off for the garage area (Rooms 100) of the Huron County Ambulance Station. The assignment, part of CONS1010 Introduction to Cost Estimating, requires a comprehensive analysis of the building's framing materials. The take-off includes calculations for 2x6 stud framing (16” c/c), 5/8” plywood sheathing, and air barriers, along with incidental carpentry items. The solution provides a step-by-step approach to estimating the quantities of materials required, including studs, horizontal blocking, plywood sheathing, and air barriers, using the provided dimensions and formulas. The document also includes a takeoff list, quantity sheet and calculation procedures, ensuring accurate cost estimation. This assignment emphasizes practical application of cost estimating principles in a construction project, providing students with essential skills for the field. The take-off is done in lineal and square feet, with detailed calculations for the perimeter, stud spacing, and areas of openings. Fasteners are also estimated based on the lineal feet of the framing materials.
1 out of 8