Construction Project Information Report: Analysis and Evaluation

Verified

Added on  2020/12/08

|25
|3367
|280
Report
AI Summary
This report provides a detailed analysis of construction project information, crucial for effective building design and execution. It categorizes construction information into general and project-specific types, emphasizing the importance of each for various stakeholders like consultants, engineers, and contractors. The report explores specific information such as door schedules, floor plans, and material specifications, including acoustic performance and window U-factors. It also delves into construction drawings, differentiating between proprietary, performance, and prescriptive specifications. The report highlights potential issues like vague adjectives, insufficient site details, and missing facility requirements and provides solutions for mitigating these gaps to ensure a successful construction outcome. Finally, the report discusses the significance of the project brief and the role of skilled labor and appropriate material selection in the construction process.
Document Page
Running Head: CONSTRUCTION PROJECT INFORMATION
Construction Project Information
[Name of Student]
[Name of Institute]
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Construction Project Information 1
Construction Project Information
LO1
Task 1
(a)
Construction information is the necessary element of every construction sector because it
contains each and every detail needed for making the construction in an effective way. These
details are needed by every construction worker so that the tasks can be executed in a proper way
(Wans, et.al, 2017). Consultants, engineers, architectures, and contractors require construction so
that project can be completed. Construction information is also used for making the areas like
floor and parking. Construction information is also used for choosing the right material for the
construction project (Šestáková, 2015, pp.2-9). Durable construction materials help in elongating
the life of the construction building. Because the customer tells that the location is the industrial
park. The industrial park is very near to the International airport, so it is very essential that the
construction-related decisions need to be taken effectively. Through construction information,
the building location can be selected. It also aids in the effective analysis of the building.
(b)
The construction information is categorized majorly into Project-Specific Information
and the General Construction Information.
Document Page
Construction Project Information 2
General Construction Information
It is the construction information that helps in creating the general construction project.
For every project, this information is required. Every industrial, residential, and commercial
building requires general construction information (Šestáková, 2015, pp.2-9).
Project Specific Information
It is a more specific kind of information. Specific Information is used for a particular kind of
information. Some prominent examples are:
Schedule of windows, doors & other components.
Concept Drawings
Bill of Quantities
Schedule of works
Client’s Brief
Either the construction project is commercial or the residential different construction
information is essential. Without construction information, it is impossible to make the
construction project (Wans, et.al, 2017). It aids in giving guidance to the construction workers.
In order to construct the construction project, additional information is also necessary. This
information is required by the Surveyor. Construction information incorporates some
requirements that need to be meet (Šestáková, 2015, pp.2-9). The customer is accountable for
giving the construction information. This building has 5 stories.
Document Page
Construction Project Information 3
Structured Type-Framed Building
Within this construction project, the major material are the concrete and the building-
Steel (Wans, et.al, 2017). Along with this, there are some necessary materials included as well.
Outerwall Material: The material required for making the external wall needs to have an
optimum R-value.
Acoustic Performance: It is crucial to have adequate Acoustic Performance. It is necessary that
there should be proper absorbing material. For this building, there will be proper large rooms for
the conference. There are partition walls which have acoustic performance.
Window Material- It is crucial that the window material needs to have a proper U-factor that is
less than 0.35. In order to make this building, glass doors & curtain walls should use.
(c)
It is seen that in general construction Information, multiple regulations and codes are
there. In order to assess the construction building’s safety factors, it is necessary that there
should be adequate general construction information (Šestáková, 2015, pp.2-9). The customer is
accountable for giving all the necessary kinds of information. Project-specific information is
essential for making a specific project. Project-specific information comprises all the detail that
helps in making any specific area of the project (Pan, and Sidwell, 2011, pp.1081-1099). Project-
specific information comprises details of necessary products and raw material. This information
helps in doing the cost analysis.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Construction Project Information 4
LO2
Task 2
(a)
North Elevation
Site- Floor Plan
Document Page
Construction Project Information 5
Conflict & Specification Detection
Floor Plan- 3rd & 4th
Document Page
Construction Project Information 6
2nd section
Floor Plan of Ground
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Construction Project Information 7
South Elevation
Column & Beams Layout
Document Page
Construction Project Information 8
Schedule of windows & door.
1st & 2nd Floor Plan
Document Page
Construction Project Information 9
(b)
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Construction Project Information 10
Document Page
Construction Project Information 11
chevron_up_icon
1 out of 25
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]