Introduction
The construction industry is an organization that has the responsibility of creation of physical
infrastructures. This industry can certainly not be compared with production as it doesn’t involve
production of a unit product in a huge number and that also without having assured purchasers,
in architecture the projects start only prior to the assurance of the client. The architectural
industry has a huge market value around the world; around 5-10% of GDP of a nation is
contributed by the construction industries only. Architecture of any infrastructure can be on a big
or not so big scale that depends on the budget and need of the purchaser.
Document Page
LO1 Evaluate different types of construction information in the context of diverse project
types.
a) Explain the use of construction information in the context of the given
project.
Construction information is used in creation of the whole plan of the construction in order to have a
direction in which the whole construction work has to flow. The basic use of the construction
information is to have a design of various components of the infrastructure that has to be made in the
whole project such as, electrical connections, plumbing connections, sewers, architecture etc (Kim,
2013).
Document Page
b ) Describe the different types of construction information and their uses. What type of
construction information will you use for the current scenario and justify their use?
Following are the types of construction information (Kim, 2013).
1) Architectural Drawing: It has all the information of the projects like location, site plan, setting
out plans, elevation, section and plenty of more information.
2) Structural Drawing: The Structural Drawing has every detail regarding the interventions of the
structures that are that are going to arrive on an infrastructure. It also consists of different type of
drawings with small detailing and descriptions (Kim, 2013).
3) Electrical Drawing: This type of construction information provides the details regarding the
electrical connections that are to be done in the building
4) Plumbing Drawings: As the name suggests, this type of construction information provides the
details of all the plumbing related connections
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
c) Compare different types of construction information to identify their
suitability in specific contexts
Following are the different types of construction information.
1) Architectural Drawing: It has all the information of the projects like location, site plan, setting
out plans, elevation, section and plenty of more information. It is suitable for every construction
project (Kim, 2013).
2) Structural Drawing: The Structural Drawing has every detail regarding the interventions of the
structures that are that are going to arrive on an infrastructure. It also consists of different type of
drawings with small detailing and descriptions. It is suitable for large scale projects
3) Electrical Drawing: This type of construction information provides the details regarding the
electrical connections that are to be done in the building. It is suitable for buildings and houses
and not for statues or monuments.
4) Plumbing Drawings: As the name suggests, this type of construction information provides the
details of all the plumbing related connections. It is suited for large industries and houses.
Document Page
LO2 Develop construction drawings, details, schedules and
specifications in support of a given construction project.
b) Produce an outline bill of quantities.
Construction for Roads at the inside of a shopping complex (Kim, 2013)
Sr. No. Item Name Quantity
Required
Unit Price/Unit(Rs.) Total Price(Rs)
1. Supply and laying of Cement
for the foundation of the
land and formation of
smooth surface to move
50 Kilograms 7
2. Supply and laying of CPVC 10 meters 3714 37140
3. Supply and laying of tiles to
be put on the ground for
attractive look
1500 Number of tiles
20
30,000
4. Supply and laying of floor
cleansers for extra
smoothness on the surface
1 Number of
product
2000 2000
Document Page
c) Compose a schedule of works.
Task Description Starting Date Deadline Priority
Foundation of land 3 / 7 / 18 4 / 7 / 18 High
Foundation of Roof 5 / 7 / 18 6 / 7 / 18 High
Laying of Pipeline 7 / 7 / 18 9 / 7 / 18 Medium
Laying the Electrical Connections 10 / 7 / 18 13 / 7 / 18 Medium
Laying ground and roof over the
foundation
13 / 7 / 18 19 / 7 / 18 Medium
Paint 20 / 7 / 18 22 / 7 / 18 Medium
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
d) Justify the use of specific types of construction information in Task 1 & Task
2 in support of the project.
The construction type that was chosen in both of the tasks that are the task 1 and task 2 was the
architectural design because it superficially covers almost all the other types of the construction
information and hence is said to be the mother of all the design that are made in the architectural field.
Document Page
LO3 Interpret different types of construction information in order to
explain a construction project
a) Relate a set of construction drawings to a specification.
A construction drawing can be of any kind such as plumbing design or electricity design etc. Both of
these designs have their own set that is formed to lay the pipelines and wires for in different part of
house but yet both are very much related as to lay a pipe, the positioning of the wires in that area must
be kept in mind.
Document Page
b) Evaluate construction drawings and details to identify errors and clashes
Following are the types of design errors that are observed in construction
Incomplete Plans- If the plans aren’t properly been made, than many problems may occur
Non Coordinated Plans- If all teams are not in coordination and communication
Lack of detailing in the drawing
Wrong Review from the Supervisor
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
c) Critique a body of construction information, identifying errors and
discrepancies.
The above mentioned issues are most likely to appear in case of improper supervision of the project.
Proper communication between all the teams is very necessary in the constructional business; this
caused to innovation of new ideas and also reduces the risk of mistakes
Document Page
d) Propose corrections to construction drawings and specifications using
industry standard forms of notation.
The problems that are given above are most likely to appear in case of improper supervision of the
project. Proper communication between all the teams is very necessary in the constructional business;
this caused to innovation of new ideas and also reduces the risk of mistakes
chevron_up_icon
1 out of 16
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]