This report provides an analysis of ten different research journals related to construction management. The journals cover a wide range of topics, including the ranking of construction management journals, project risk management in Nigeria, teamwork in Malaysian construction companies, sources of construction waste, sustainability in project management, project management approaches in qualitative research, factors influencing labor productivity in India, effectiveness of project management practices, managerial styles of project managers, and an index to assess project management competencies. Each journal's research methods, sampling considerations, data collection processes, reporting practices, and potential limitations are examined. The analysis highlights strengths and weaknesses in each study, such as the use of questionnaires, sample sizes, and the handling of potential biases. The report assesses the layout of questionnaires, sampling considerations, data collection methods, and the evaluation of project productivity. It also comments on the reporting quality, and identifies potential issues such as self-administered questionnaires, observation clarity, response rates, and the complexity of questions. The analysis provides a comprehensive overview of the research landscape in construction management, offering insights into the diverse approaches and challenges faced by researchers in the field.
Document Page
Second Part
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
The research journals pertaining to the following report would have to be described in generic
terms for obtaining inferences into the nature of the research activity and the objectives
related to them.
Journal 1:
The ranking of construction management journals:
This paper is directed towards the assessment of quality in construction management
journals. The use of a questionnaire survey approach is implemented for obtaining resolution
to the issue could be observed in the journal (Wing, 1997).
Journal 2:
Project Risk Management Issues in the Nigerian Construction Industry
The journal is directed towards identification of the various issues faced by the construction
industry in Nigeria with a notable reference towards determining the level of awareness
regarding risks and the use of risk management approaches (Ubani et al., 2015). The research
findings were reflective of the lower implementation of risk management processes and level
of awareness regarding risks in the construction industry.
Journal 3:
Investigation of Condition, Creativity and Performance of Teamwork in Malaysian
Construction Companies
The journal reflects on the factors of conditions, creativity and performance in context of
teamwork in the Malaysian construction industry. The paper employed investigation of the
existing scenario of teamwork in the construction industry to derive plausible insights into the
critical factors that enhance performance and creativity from teamwork (Shafie & Samari,
2014). The basic findings of the report indicated the significance of the factors such as work
environment, company rules and regulations and employee personality.
Journal 4:
Quantitative Analysis of the Sources of Construction Waste
The journal was aimed at determining the contribution rates of different identified sources of
waste in order to derive appropriate construction waste mitigation approaches. The research
Document Page
journal implemented quantitative research method for determining the frequency and severity
of the contribution of distinct sources of waste (Fadiya, Georgakis & Chinyio, 2014).
Journal 5:
Critical success factors (CSFs) for integration of sustainability into construction project
management practices in developing countries
The paper is directed towards the evaluation of the critical success factors in context of the
integration of sustainable project management precedents in the practices followed by
construction companies in developing countries (Banihashemi et al., 2017). The journal
emphasized on references to the triple bottom line pertaining to sustainability i.e. economic,
social and environmental. One of the profound characteristics of the paper is its uniqueness as
the first research study that is intended to identify CSFs for the integration of sustainability in
the project management approaches of construction companies.
Journal 6:
Applying a Project Management Approach to Qualitative Survey Research Projects
The journal is intended to accomplish the objective of application and integration of a project
management approach in a qualitative research study (Sha & Childs). The paper integrates
the project management approach in order to determine the impact of the efforts on the
credibility of the research findings and the quality of data.
Journal 7:
Factors Influencing Construction Labour Productivity: An Indian Case Study
The journal is intended to address the insufficiency of research studies pertaining to the
improvement of productivity among construction workers in India. The paper identified five
profound factors that are associated with a formidable impact on productivity (Thomas &
Sudhakumar, 2014). The factors which were identified to influence labour productivity in the
research journal included timely access to the drawings at worksite, political strikes, timely
access to physical resources at workplace, frequency of revisions in the construction plan and
the delays in delivery of material supplies.
Journal 8:
Document Page
ASSESSING THE EFFECTIVENESS OF PROJECT MANAGEMENT PRACTICES
IN PROJECT-DRIVEN ORGANISATIONS
The journal is intended to accomplish the objective of promotion of best practices in project
management with the use of an assessment tool. The report emphasized on illustration of the
significance of project management in contemporary organizations alongside an overview of
the background of the study (Smith). The paper implemented an assessment tool in order to
evaluate the effectiveness of project management approaches in a South African
telecommunications company, Telkom. One of the formidable findings of the report could be
identified in the influence of project planning on the success of project management.
Journal 9:
Managerial style profiles of successful project managers: a survey
The study progresses with the aim for investigating the managerial style profiles of different
project managers that have been successful in variety of projects. The research in the journal
is executed through the utilization of references to the use of a survey in order to obtain
legible insights into the differences in managerial style profiles followed in different
countries (Montequin et al., 2015). The findings of the paper explicitly highlighted that the
managerial style profiles of successful project managers include structured behaviour,
extroversion and rational decision making. The paper also accounted professional experience
and the sector of operations as underlying factors which influence the success of project
managers.
Journal 10:
An Index to Assess Project Management Competencies in Managing Design Changes
The paper is largely dedicated to the development of an index that would evaluate the
competency level of teams involved in project management initiatives. This objective would
be accomplished through recognition and rating of the competences of members of a project
management team attributed to them (Zadeh et al., 2016). The aim for determining the
competences is intended to describe the capability of the project management team to address
design changes at different instances during the project execution. The paper identified that
the awareness of composition of a project management team and the skills, background,
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
characteristics and work experience are crucial for effective responses of a project
management team to address unprecedented design changes in a project.
Journal 1:
The ranking of construction management journals
Practice Comment
Good Layout of Questionnaire The questionnaire was
grouped into two categories
of questions pertaining to the
research objective. The
questionnaire comprised only
of two questions. The first
question comprised of a list
of journals and the
respondents were asked to
rate the journals according to
scores ranging from 0 to 100.
The second question was
intended to derive the
association of the respondent
with the journal and three
distinct forms were included
as response options in the
journal (Wing, 1997). The
three different potential
forms of association were
identified as Author,
Editorial board members and
referee.
Sampling Considerations The sampling considerations
were addressed in the paper
through the observation of a
sample size of 65
Document Page
respondents from 13 different
countries.
Data Collection The collection of data was
ensured through a
questionnaire survey
comprising of two questions.
The complete data collection
process was conducted
electronically. The
questionnaires were
administered to the potential
respondents through email.
Evaluation of project
productivity
The journal does not
emphasize on any factor
relevant to the productivity
of construction project
outcomes.
Reporting The use of a scale of scoring
from 0 to 100 for the first
question and the three
options provided for the
second survey question
indicate good practices in
reporting.
Poor Self-administered
questionnaires
The questionnaire provided
in the research activity can be
classified as a self-
administered questionnaire
which leads to concerns of
poor response rate thereby
implying poor practices in
survey research.
Lack of clear observation The lack of observation that
could lead to social
Document Page
desirability bias has been
addressed in the research
journal through implying
references to the
classification of the
respondent’s association with
the journal.
Inability to contact units The inability to contact with
respondents could be
observed from the lack of
updated information
regarding the e-mail
addresses of researchers in
various databases on the
internet.
Failure to Improve response
level
The limitations on contacting
sample units lead to the poor
practice for failing to
improve response rates.
Misinterpretations and
misunderstandings
One misinterpretation can be
observed in the survey
regarding the vested interest
of the respondents in ranking
of the journals.
Formulating complex
questions
The questionnaire does not
have any complex questions
and is a simple one
comprising of two open
ended questions.
Journal 2:
Project Risk Management Issues in the Nigerian Construction Industry
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Practices Comment
Good Layout of Questionnaire The layout of the
questionnaire comprises of
four pages comprising of a
covering letter. The
questionnaire was grouped
into three distinct sections A,
B and C. The questions in the
survey were directed towards
anticipation of the
demographic characteristics
of respondents, the work
experience of respondents,
knowledge of risk
identification (Ubani et al.,
2015).
Sampling considerations The sample size identified in
the research was 84.
Data collection The process of data
collection was conducted by
delivering fifteen
questionnaires each to the
construction companies and
24 questionnaires were
delivered to consultancy
firms.
Evaluation of project
productivity
The ranking of risk triggers
identified in the survey
accounts for obtaining
insights for improvement of
the project productivity in
terms of cost, quality, project
objectives and scope of the
Document Page
project.
Reporting The report followed the
Likert scale which enabled
good practices in the report.
Poor Self-administered
questionnaire
Yes, the questionnaire is self
administered and does not
require the intervention of
the researcher.
Lack of clear observation There is no lack of
observation as the
classification of the
respondents on the basis of
employment position is
ensured in the paper
Inability to contact units The contact with the sample
units is established on the
grounds of the selection of a
local population
Failure to improve response
rate
The necessity for improving
the response rate was not
perceived owing to validity
of the observed response rate
i.e. 67.86%.
Misinterpretations and
misunderstandings
There are no
misunderstandings observed
in context of the survey.
Formulating complex
questions
The questions are not
complex and are classified
into distinct groups thereby
simplifying them for
respondents.
Journal 3:
Document Page
Investigation of Condition, Creativity and Performance of Teamwork in Malaysian
Construction Companies
Practices Comment
Good Layout of Questionnaire The questionnaire comprised
of four distinct sections
which elicited responses in
the dimensions of
respondent’s information,
creativity, condition of
teamwork and performance.
Sampling considerations The sample was derived from
a population involved in
construction projects and a
sample size of 837 was
finalized for the research.
Data collection The data collection process
was executed through
delivery of the questionnaire
to the 837 participants in the
sample.
Evaluation of project
productivity
The survey emphasizes on
the factors which could
promote productivity in
teamwork.
Reporting The use of Likert scale for
the different segments of
questions involved in the
survey questionnaire can be
validated as a precedent of
effective reporting.
Poor Self-administered
questionnaire
The questionnaire is self
administered in this journal
Lack of clear observation The lack of clear observation
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
is not highlighted in this
journal due to the limited
number of questions.
Inability to contact units The inability to contact units
could be observed in the
journal owing to the lower
response rate than 50%
(Shafie & Samari, 2014).
Failure to improve response
rate
The journal indicates failure
to improve the response rate
owing to the large size of the
sample.
Misinterpretations and
misunderstandings
The misinterpretations
identified in the survey were
related to the role of women
in creation of company.
Formulating complex
questions
The questions were not
complex in the journal.
Journal 4:
Quantitative Analysis of the Sources of Construction Waste
Practices Comment
Good Layout of Questionnaire The questionnaire comprised
of two distinct parts among
which the former was
inclined to obtain an
impression of the
respondent’s background.
The second part was
designed to determine the
severity and frequency
ratings for the sources of
Document Page
construction waste.
Sampling considerations Random sampling approach
was followed and 220
companies were approached
from which a sample size of
55 respondents was
determined.
Data collection The data collection process
was ensured through
accessing contacts of
building and civil
engineering contractors and
delivering the questionnaires
(Fadiya, Georgakis &
Chinyio, 2014).
Evaluation of project
productivity
The project productivity
aspect is not observed in the
survey.
Reporting The reporting is ensured
through the use of a Likert
scale in order to assess the
severity and frequency of
contribution of a source of
construction waste
Poor Self-administered
questionnaire
The questionnaire is self
administered
Lack of clear observation The lack of clear observation
is addressed in the report
through limiting any
sampling bias.
Inability to contact units The sample selected for the
research is small and the
facilities of KOMPASS
could be used to contact