This construction management assignment presents a detailed analysis of various aspects of building construction. It begins by comparing the advantages and disadvantages of different internal wall options, including block work, framed structures, timber walls, brick walls, and rammed earth walls. The assignment then moves on to discuss timber stud wall construction, evaluating its sustainability, construction speed, quality, thermal performance, strength, and associated disadvantages. Furthermore, it details the elements used to construct a front wall, including ceiling joists, studs, noggins, and trimmers. The assignment also explores the construction sequence for the front wall, from site clearance to completion. A significant portion of the assignment is dedicated to different roof structures, such as gable, hip, mansard, gambrel, and flat roofs, and their respective advantages and disadvantages. Finally, the document includes sections showing how the roof structure sits on external walls and the details where external walls are pushed to the eaves line.