Construction Practice and Management Report: Company Analysis

Verified

Added on  2020/12/29

|12
|3666
|55
Report
AI Summary
This report provides a detailed analysis of construction practice and management, focusing on the operations of Thomas Sinden Ltd. It examines the development of the construction industry, the scope and linkages between various parties involved, and the different types of contractual work. The report identifies various types of construction companies, their key features, and suggests the most suitable type for the given scenario. It explores relationships between companies in construction projects, links connecting construction companies, and factors differentiating contracts and tenders. Modern construction processes, contract planning techniques for micro and macro projects, and the impact of Building Information Modelling (BIM) are also discussed. The report also analyzes the evolution of health and safety in construction, government legislation, and the role of collaboration and communication in ensuring safe working practices. The report concludes with an evaluation of the impact of health and safety legislation within the construction industry.
Document Page
Construction Practice
& Management
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Contents
INTRODUCTION......................................................................................................................4
TASK 1......................................................................................................................................4
(a) Explain how the construction industry has developed.....................................................4
(b) Demonstrate the scope and linkage between all parties...................................................4
(c) Identify different types of contractual work tendered by contractors...............................5
(d) Analyse how the construction industry has developed overall in terms of company
structures, its employees and contracted work.......................................................................5
(e) Evaluate how construction companies have developed their structure and business......5
TASK 2......................................................................................................................................6
(a) Identify the different types of construction companies in the market and the key
features of different types. Suggest the type of Construction Company for the given
scenario and justify its suitability...........................................................................................6
(b) Explain the relationship that may exist between the companies working on the
construction project................................................................................................................6
(c) Analyse the link which connects construction companies...............................................7
(d) Compare the main factors which differentiate between construction company contracts
and tenders.............................................................................................................................7
TASK 3......................................................................................................................................7
(a) Identify, with examples, modern construction processes and sequences used within
today’s industry, highlighting the way they respond to sustainability needs.........................7
(b) Explain contract planning techniques used within micro and macro projects.................8
(c) Identify where BIM impacts upon operations and construction companies in the current
scenario..................................................................................................................................8
(d) Analyse how construction has developed in terms of innovation, designs, and within
contracts for micro and macro projects..................................................................................8
TASK 4......................................................................................................................................9
(a) Explain how health & safety has now become an integrated part of the construction
process....................................................................................................................................9
(b) Describe the government legislation which has benchmarked health & safety within
construction............................................................................................................................9
(c) Discuss the role of collaboration and communication in ensuring safe working
practices..................................................................................................................................9
(d) Demonstrate how the construction industry has benefited through changes in health &
safety legislation...................................................................................................................10
Document Page
(e) Impact of health & safety legislation, how it has evolved the drivers for it, and its
advantages or weaknesses within construction....................................................................10
CONCLUSION........................................................................................................................10
REFERENCES.........................................................................................................................11
Document Page
INTRODUCTION
Project management is the basis on which construction project is founded. It is the
responsibility of construction manager to have variety of skills so that project can be
successful. To make the construction successful, it requires effective management which
includes planning, organising, directing and controlling. To better understand this concept
Thomas Sinden Ltd has been chosen which is a construction company and established in
London. In this project, there are following topics are covered such as: demonstrate the scope
and linkage between all parties within a construction organisation, different types of
constructions companies within the market & their relationship with the tendering process
and the key stages in a constructions project & how building information modelling informs
the different stages. Apart from this it also discuss about how the construction industry has
developed suitable collaboration strategies in support of greater recognition of health &
safety.
TASK 1
(a) Explain how the construction industry has developed
Construction industry has been developed over a period of time and the construction
is continuous to develop because innovative technologies coming into play in the industry
which involves crusher machinery that is beneficial to keep in line with green construction
practices. As the UK is developed country so that the demand of construction practices are
huge and construction industry has contributes around 90 billion GBP to the nation and more
than 2.9 million people are employed in this field. As the largest construction project has
been made in United Kingdom which is known as Crossrail. As industries, factories, hotels,
corrporations are increasing continuously so that construction industries has developed.
Thomas Sinden Ltd is dealing in different construction projects such as: projects related to
public & private organisations, local authorities, commercial and household buildings,
schools, colleges & charitable trust. It encompassed professionalism within its structures so
that demands of clients can be fulfil (Phua, 2013).
(b) Demonstrate the scope and linkage between all parties
A construction organisation have to link with the different parties in order to
successfully conduct the requirements of project. A construction contract is generally
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
concluded among contractor & the client. As Thomas Sinden Ltd is always emphasis to fulfil
the demands of its clients so in future it gets more projects. The parties involved in a
construction project are: owner, the person who procuring the work or it is known as
developer. The constructor is the person who is engaged by the owner to carry out &
complete the works. This contractor will usually, in turn, engage sub- contractor to carry out
& complete separate parts of the works. The design of building is suggested by the
contractor. The other party is designer or architect who makes the blue print of construction
project and provide specification for the implementation of the development. The company
will make the construction project for 20 industrial buildings, factories manufacturing baby
foods, soaps, perfumes (Meng, 2012).
(c) Identify different types of contractual work tendered by contractors
A tender is a submission made by a prospective supplier in response to an invitation
to tender. There are different types of contractual work tendered by contractors such as: open
tendering which allows anyone to submit a tender to supply the goods or services which are
required. Suppliers are allow to submit the tender by invitation in selective tendering. Where
as in negotiating tendering a single supplier is suitable for highly specialist contracts and it is
helpful to reduce the tendering cost. In serial tendering the preparation of tenders based on
schedule of work. As per the scenario, selective tendering is suitable for this type of tender
and Thomas Sinden Ltd can effectively fulfil the requirement of tender.
(d) Analyse how the construction industry has developed overall in terms of company
structures, its employees and contracted work
The structure of company has developed as per the requirement and suitability. As the
current structure of Thomas Sinden Ltd , the chain of command is horizontal so that work can
be perform as per the requirement of organisation. Due to the absence of proper information
and guidance the employees are not able to perform according to the expectations which can
hamper the productivity also. As a result contracted work cannot be completed as per the
specification. So it is important for the company to develop a appropriate structure so
effective relationship can be develop between management, employees and contracted work.
It is helpful for the corporation to satisfy the desires of clients.
(e) Evaluate how construction companies have developed their structure and business
To develop a structure is important so that work can be done effectively. In the
structure of company three persons are most important which are employees, contracted work
Document Page
and client. To develop a healthy structure it is necessary for Thomas Sinden Ltd to develop a
healthy working environment in which staffs can perform their roles and duties effectively
and it is fulfil the needs of contracted work and clients because construction project can be
develop as per the specific requirement. It has great impact because it is helpful to create
effective relationship with all the parties who engage in the construction work and
management can be improve (Lixin and Changming, 2012).
TASK 2
(a) Identify the different types of construction companies in the market and the key features
of different types. Suggest the type of Construction Company for the given scenario and
justify its suitability
There are different types of construction companies in the market which have key
features of different types such as: small renovation contractors and the features is, it
performs home alterations or small commercial & office work. General contractors are those
who experts in new buildings or alteration work. Whereas owner-builder constructor
companies are those who builds buildings only for its own ownership and sell the buildings
completely or either for rent perspective. Professional construction companies are those who
perform the functions required in building a project as a owner or agent. The construction
company for the given scenario is professional construction company because it have to
complete to complete the construction project of 20 industrial buildings and factories
manufacturing baby foods, soaps, perfumes amongst several other commodities.
(b) Explain the relationship that may exist between the companies working on the
construction project.
There are various companies who is doing the construction project and earning the
good profit and emphasis to capture high market share so that it can survive in the market for
a long time. As Thomas Sinden Ltd is always focuses to build healthy relationship with
corporations who working on the construction project. It trust the companies who provide
raw material and other ancillary things which are helpful to complete the project within
stipulated time frame. Organisation make payment time to time as per the contract so that
chances of conflicts can be resolve. It make healthy relationship with those companies who
provide contract workers so that work can be done effectively.
Document Page
(c) Analyse the link which connects construction companies
For a construction company it is necessary to create link so that it can get more
projects which is helpful to maximize its profits as well as market share. So Thomas Sinden
Ltd is has always emphasis to satisfy the needs of clients so that they can find other
consumers when they do word to mouth publicity. So that more number of persons will show
its willingness to make its construction project from the company which is helpful to develop
healthy link. Social media platform is also very beneficial link which connects construction
companies so that more number of people can aware about the organisation. Reputation and
brand image it also helpful to make a strong link which is helpful for the organisation to
expand its market share as well as profits.
(d) Compare the main factors which differentiate between construction company contracts
and tenders.
Construction contract is about to chose the suitable contract for both the parties
contractor and client. Both parties choose the contract as per its interest and want to take
maximum benefit from it. There is an agreement has to be make which have mention all
terms and condition which are associated with the construction project and client has focuses
to minimise the cost so that it have to pay less amount of money for the completion of
construction project. Whereas comparison makes with tenders. The term tender denotes an
invitation to trade under the terms on offer. It usually refers to the process in which
organisations and financial institutions invite bids for big projects which are require to be
accomplish within stipulated time frame. It ensure the selection process is fair & transparent.
So these are the main factors which are needed to be consider (Harris and McCaffer, 2013).
TASK 3
(a) Identify, with examples, modern construction processes and sequences used within
today’s industry, highlighting the way they respond to sustainability needs
The modern construction process are based on innovation and robots are used for it so
that work can be done effectively. The designs are unique and innovative which attract the
people. As an example, buildings are made on 3D printing and smart buildings are developed
by the constructions companies in which building operations including heating, air
conditioning, heating, security, lighting & other systems are controlled automatically. As per
the scenario it is important for Thomas Sinden Ltd to use innovation and creativity while
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
developing 20 industrial buildings and factories so that sustainability can develop and it can
capture more market share.
(b) Explain contract planning techniques used within micro and macro projects
In macro projects contract planning techniques are based on priorities & schedule for
the tasks require to complete the operations goals. In this planning technique projects can be
organised in different ways such as: sequential, parallel and staggered. Whereas micro
planning technique is based on the single task which is needed to be accomplish and there are
more chances that project is qualitative as well as cost effective. For the chosen scenario most
suitable contract technique is macro project planning technique because company have to
make twenty industrial buildings and factories manufacturing baby foods, soaps, perfumes
amongst several other commodities. So for Thomas Sinden Ltd macro projects are helpful
(Chou and Yang, 2012).
(c) Identify where BIM impacts upon operations and construction companies in the current
scenario
BIM is a way of representing distinct components of construction process and it
represents terrain, utilities & buildings. It can give positive impact on operations &
construction companies because it allows engineers to essentially create a building on a
computer before constructing it in the field. The information consist of everything which goes
into constructing & maintaining a building through its life cycle & will include construction
programming, cost & facilities management data. In the current scenario BIM is useful and
Thomas Sinden Ltd can use it to build industrial buildings and factories and check the feasibility
that this construction project will be successful.
(d) Analyse how construction has developed in terms of innovation, designs, and within
contracts for micro and macro projects
In the micro and macro projects construction has developed in the terms of
innovation, designs within contracts because it emphasis towards creativity in design so that
project look elegant. These are related to the BIM because with the help of it, constructor can
create a building on a computer before constructing it in the field so that feasibility can be
check and if any improvement is needed than it can be done. In the current scenario it will be
benefited because construction project will be innovative with unique design so that blue can
be prepare which has to show the client that after the completion project will look like this.
So it is very beneficial in the current scenario.
Document Page
TASK 4
(a) Explain how health & safety has now become an integrated part of the construction
process
Health and safety is becoming an integrated part of the construction process because it
is not easy for a company to successfully complete the construction project. There are
hundreds of workers are engaged in the work and they use heavy machinery and other tools.
If they are not use properly than health can be affected. So it is important for the organisation
to take care of safety of its employees. Thomas Sinden Ltd is always emphasis towards the
health & safety of its employees and provide healthy working environment with safety tools
so that their health and safety does not get affected. As a result productivity does not get
hamper (Chen and Luo, 2014).
(b) Describe the government legislation which has benchmarked health & safety within
construction
To protect the health and safety of workers government has introduced legislations. In
United Kingdom there is a legislation which is known as Health and Safety at Work Act
1974. As per this act it is the responsibility of employer to protect the health of its employees.
As Thomas Sinden Ltd has follow the legislation of government in order to take care of
health & safety of its workers. According to the scenario it is important to take safety
measures while developing the twenty buildings and factories so that an employees does not
get injure and work can be completed within stipulated time frame as per the need of client.
(c) Discuss the role of collaboration and communication in ensuring safe working practices.
The role of collaboration and communication in ensuring safe working practices are
very helpful. It is the responsibility of employer to make collaboration with the employees
and communicate relevant information that how they have to use the machinery and other
equipments so that their health does not get affected. Thomas Sinden Ltd is always focuses to
provide healthy and safe working environment so that workers can work safely. As per the
current scenario factory buildings are made of both steel, concrete and other materials so it the
duty of owner to provide appropriate information that how workers have to perform in order to
successfully complete the construction project.
Document Page
(d) Demonstrate how the construction industry has benefited through changes in health &
safety legislation
The construction industry has benefited from the change in health & safety legislation
because it have to follow all the norms and regulations which are associated with health and
safety law. As company have to provide health working environment to the workers so that
they can work effectively as a result they can perform the task as per the requirement. With
the help of proper safety measures and tools, accidents at work place has been reduce so that
employees does not get injure and continue its work. As Thomas Sinden Ltd has also
benefitted because it follow all health and safety legislation so that work can be done as per
the requirement.
(e) Impact of health & safety legislation, how it has evolved the drivers for it, and its
advantages or weaknesses within construction
The health and safety legislation has impact the construction industry and it is the
advantage for it. By following the laws and regulations related to health and safety, now
companies does not much worry about the contingencies which are arises at workplace. If
any contingency has arise than insurance is helpful and the amount can be spent for the
wellness of workers if they meet any accident while doing the work. As companies take care
about the health of employees and provide safety equipments so that chances of injury can be
minimize. For Thomas Sinden Ltd it is advantage because it follow the legislation related to
health and safety (AlSehaimi and Tzortzopoulos, 2012).
CONCLUSION
As from the above project, it has been concluded that construction practice and
management plays an important role for the construction companies. There are different
parties are involve and it necessary to build effective structure which support the growth of
business. It is needed to create links with constructions companies. In tenders it is require to
put an effective bid. Construction has developed in terms of innovation, designs, and within
contracts for micro and macro projects. Health & safety legislations are needed to be follow in
construction projects.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
REFERENCES
Books and Journals
AlSehaimi, A., Koskela, L. and Tzortzopoulos, P., 2012. Need for alternative research approaches in
construction management: Case of delay studies. Journal of Management in
Engineering. 29(4). pp.407-413.
Chen, L. and Luo, H., 2014. A BIM-based construction quality management model and its
applications. Automation in construction, 46, pp.64-73.
Chou, J. S. and Yang, J. G., 2012. Project management knowledge and effects on construction
project outcomes: An empirical study. Project Management Journal.43(5). pp.47-67.
Harris, F. and McCaffer, R., 2013. Modern construction management. John Wiley & Sons.
Hwang, B. G. and Low, L. K., 2012. Construction project change management in Singapore: Status,
importance and impact. International Journal of Project Management. 30(7). pp.817-826.
Lavender, S. D., 2014. Management for the construction industry. Routledge.
Lixin, C., Hui, G. and Changming, Q., 2012. Exploration and practice of construction and management
of local university laboratory [J]. Experimental Technology and Management, 3.
Meng, X., 2012. The effect of relationship management on project performance in
construction. International journal of project management. 30(2). pp.188-198.
Phua, F. T., 2013. Construction management research at the individual level of analysis: current
status, gaps and future directions. Construction Management and Economics. 31(2).
pp.167-179.
Yang, R. J., Wang, Y. and Jin, X. H., 2014. Stakeholders’ attributes, behaviors, and decisionmaking
strategies in construction projects: importance and correlations in practice. Project
Management Journal. 45(3).pp.74-90.
Zhou, Z., Goh, Y. M. and Li, Q., 2015. Overview and analysis of safety management studies in the
construction industry. Safety science.72.pp.337-350.
Zimina, D., Ballard, G. and Pasquire, C., 2012. Target value design: using collaboration and a lean
approach to reduce construction cost. Construction Management and
Economics.30(5).pp.383-398.