This report examines the construction of a swimming pool in modern society as a project. It begins by defining the project lifecycle, outlining the various stages from initial conception to the ongoing phases. The report details the role of project management in coordinating the project, emphasizing the importance of collaboration between project managers, engineers, and architects. Furthermore, the report identifies key project management knowledge areas relevant to the project, including integration, cost, schedule, quality, and risk management, to ensure a smooth execution. The document is a student submission and provides a practical application of project management principles within the context of a construction project. The report also includes references to support the findings and methodologies discussed.
Document Page
Running head: CONSTRUCTION OF SWIMMING POOL IN MODERN SOCIETY
Construction of swimming pool in modern society
Name of the student:
Name of the university:
Author note:
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1CONSTRUCTION OF SWIMMING POOL IN MODERN SOCIETY
Table of Contents
Role of Project Cycle in the selected project:..................................................................................2
Role of Project Management in the selected project:......................................................................2
Project management knowledge areas related to the selected project:............................................2
References:......................................................................................................................................4
Document Page
2CONSTRUCTION OF SWIMMING POOL IN MODERN SOCIETY
Role of Project Cycle in the selected project:
Project cycle refers to the logical representation of all the activities that are taken within a
project while achieving the desired objectives and intentions of the project. For the ongoing
project of construction of swimming pool in modern society, project lifecycle includes several
complexities that are faced during its execution while following through several stages such as
the initial phase where the idea to construct the swimming pool is determined and the important
critical factors for the project are hence identified which is the first step for the successful
implementation of the project (Artto, Ahola & Vartiainen, 2016). In the next step that is in the
preparation phase, the selected idea for the project is developed and the budget of the project is
estimated which is around R1.572000.00. Similarly, the project lifecycle continues with the
presentation, implementation and monitoring phase where the stakeholders, suppliers and the
possibility of the project are analyzed in detail. However, the final phase of the scheme lifecycle
is yet to be analyzed as the project is an ongoing project.
Role of Project Management in the selected project:
Managing the projects plays a vital role in project construction and the scheme managers
related to the project of constructing swimming pool in modern society need to work closely
with the engineers and the architects so as to develop the plan and establish the desired
timetables while determining the labor and mining cost of the swimming pool.
Document Page
3CONSTRUCTION OF SWIMMING POOL IN MODERN SOCIETY
Project management knowledge areas related to the selected
project:
The project organization knowledge areas that are related to the ongoing project of
constructing swimming pool in modern society includes-
Project Integration Management, , Project cost management, Project Schedule management
Project Quality Management, Project reserve management and also scheme risk management.
Maintaining these knowledge areas will help to develop suitable project charter as well as a
engrained project organization plan so that the scheme can be assessed smoothly from the
initiation phase till the final phase (Todorović et al., 2015).
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
4CONSTRUCTION OF SWIMMING POOL IN MODERN SOCIETY
References:
Artto, K., Ahola, T., & Vartiainen, V. (2016). From the front end of projects to the back end of
operations: Managing projects for value creation throughout the system
lifecycle. International Journal of Project Management, 34(2), 258-270.
Todorović, M. L., Petrović, D. Č., Mihić, M. M., Obradović, V. L., & Bushuyev, S. D. (2015).
Project success analysis framework: A knowledge-based approach in project
management. International Journal of Project Management, 33(4), 772-783.
chevron_up_icon
1 out of 5
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]