Construction Processes, Planning, and Health & Safety at BAM Nuttall
VerifiedAdded on 2020/10/23
|17
|3701
|411
Report
AI Summary
This report delves into the construction practices and management strategies employed by BAM Nuttall. It begins by examining modern construction processes and sequences, including precast flat panel systems, 3D volumetric modules, flat slab construction, and twin wall technology, emphasizing sustainability considerations. The report then explores contract planning techniques used in both micro and macro projects, covering contract evaluation, construction plans, and scheduling and coordination. Furthermore, it analyzes the impact of Building Information Modeling (BIM) on the operations of construction companies, highlighting its benefits in terms of higher quality, greater speed, and lower costs. The report also addresses the integration of health and safety into the construction process, government legislation, and the importance of collaboration and communication. The content is intended to provide a comprehensive overview of construction management principles and practices within the context of a real-world construction firm, BAM Nuttall.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.

Construction Practice & Management
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

Table of Contents
INTRODUCTION...........................................................................................................................3
LO3..................................................................................................................................................3
P6 Determine that modern construction processes and sequences used within company and
highlight the sustainability needs................................................................................................3
P7 Contract planning technique used within micro and macro projects.....................................5
P8 Building information modelling impact on the operations of construction companies.........6
LO4................................................................................................................................................10
P9 how health and safety has how become an integrated part of construction process. ..........10
P10 Describe the government legislation which has benchmarked health and safety within
construction...............................................................................................................................11
P11 Discuss role of collaboration and communication in ensuring safe working practices. ...12
CONCLUSION..............................................................................................................................13
REFERENCES..............................................................................................................................14
INTRODUCTION...........................................................................................................................3
LO3..................................................................................................................................................3
P6 Determine that modern construction processes and sequences used within company and
highlight the sustainability needs................................................................................................3
P7 Contract planning technique used within micro and macro projects.....................................5
P8 Building information modelling impact on the operations of construction companies.........6
LO4................................................................................................................................................10
P9 how health and safety has how become an integrated part of construction process. ..........10
P10 Describe the government legislation which has benchmarked health and safety within
construction...............................................................................................................................11
P11 Discuss role of collaboration and communication in ensuring safe working practices. ...12
CONCLUSION..............................................................................................................................13
REFERENCES..............................................................................................................................14

INTRODUCTION
Construction management is a professional work that applicable to specify the project
management technique to plan, design or construct the project in proper manner. The main
purpose of construction management is control the project cost, quality and time in proper
manner. This report will discuss about the determine the modern construction processes and
sequences used within the organization and also highlight the main point that needed for
sustainability. This assignment will discuss about the BAM Nuttall construction firm that
describe the contract planning technology applied in the both micro and macro projects.
Moreover, building information modelling tool impact on the business operations and function of
construction firm. Furthermore, this report will discuss about the health and safety that directly
integrated with the process of construction in the organization. At last task, this report describe
the government legislation which beneficial for the purpose of health and safety to the employee
during the construction process in the organization.
LO3
P6 Determine that modern construction processes and sequences used within company and
highlight the sustainability needs
Modern construction process and sequence is based on the development of design of
building and their infrastructure in proper manner. There are different type of construction
process used in the BAM Nuttall firm to manage all the operations and functions.
Precast flat panel system- This method is basically used in the construction process that
involves for making the wall and floor unit in off-site. It is required for separate factory outlet
and facilities required for development (Castillo, Alarcón and Pellicer, 2018). This process will
help for manufactured the services of doors, finishes and windows in proper manner. This
method will bring the building to envelope panels panel that provided with the decorative and
insulation for filtering with the help of factory. It is also used for loaded the elements in proper
manner.
3D Volumetric Modules- This is also construction method that involves 3D units for
manufacture in the form of modules at off site. For constructing the 3 dimensional model which
requires for installation of module to easily identify the need and requirement of project
development. Every modular unit is based on the 3 dimensional that construct the volumetric and
Construction management is a professional work that applicable to specify the project
management technique to plan, design or construct the project in proper manner. The main
purpose of construction management is control the project cost, quality and time in proper
manner. This report will discuss about the determine the modern construction processes and
sequences used within the organization and also highlight the main point that needed for
sustainability. This assignment will discuss about the BAM Nuttall construction firm that
describe the contract planning technology applied in the both micro and macro projects.
Moreover, building information modelling tool impact on the business operations and function of
construction firm. Furthermore, this report will discuss about the health and safety that directly
integrated with the process of construction in the organization. At last task, this report describe
the government legislation which beneficial for the purpose of health and safety to the employee
during the construction process in the organization.
LO3
P6 Determine that modern construction processes and sequences used within company and
highlight the sustainability needs
Modern construction process and sequence is based on the development of design of
building and their infrastructure in proper manner. There are different type of construction
process used in the BAM Nuttall firm to manage all the operations and functions.
Precast flat panel system- This method is basically used in the construction process that
involves for making the wall and floor unit in off-site. It is required for separate factory outlet
and facilities required for development (Castillo, Alarcón and Pellicer, 2018). This process will
help for manufactured the services of doors, finishes and windows in proper manner. This
method will bring the building to envelope panels panel that provided with the decorative and
insulation for filtering with the help of factory. It is also used for loaded the elements in proper
manner.
3D Volumetric Modules- This is also construction method that involves 3D units for
manufacture in the form of modules at off site. For constructing the 3 dimensional model which
requires for installation of module to easily identify the need and requirement of project
development. Every modular unit is based on the 3 dimensional that construct the volumetric and

modular design in effective ways. On the other hand, the transportation modules can be applied
the various type of methods and forms to create dynamic structure and infrastructure.
Flat Slab Construction- This construction is based on the structural element that highly
versatile in nature. It is the dynamic and versatile structure which used in widely in the
construction process (Grahamand Warren-Myers, 2019). It has faster construction and minimum
depth in the flat slab. This system will provide the column grid structure that flexible wherever,
The engineer always concern about the fires and acoustic so that this flat slab structure suitable
for the construction project. This construction will beneficial for organization to increase the
efficiency of energy allows exploiting of thermal mass building according to their cooling need,
ventilation design and heating etc.
Twin Wall technology- This technology is based on the hybrid solution of wall system
that combine with the quality of precast concrete and erection speed. It is a type of wall system
guarantee infrastructure that integrated with the waterproof structure provide the reliability. This
is a modern construction process to increase the speed as compare to another method in term of
economical or sustainability. This process is mainly associated with the construction of precast
floor.
Sustainable construction-
Sustainability is a term that describe the different activities without harmful impact on the
constructions. BAM Nuttall firm is focused towards the sustainable building and structure to
provide the facilities for people to develop the environmental friendly design. It is responsible
the construction process, design, operations, maintenance and renovation to construct the
sustainable building (Popat and et.al., 2018). It is important for construction business to ensures
that all the resources are applied in the project to create a dynamic construction in proper
manner. On the other hand, It is considered the environmental friendly raw material that used in
the project development. There are different type of element that make sustainable building in
proper manner.
BAM Nuttall firm uses the proper insulation for making building.
This firm is design the proper airtightness to build the right ventilation.
It can be used the best thermal mass for building the structure because it easily absorbs
warmth from the sun at time of days.
the various type of methods and forms to create dynamic structure and infrastructure.
Flat Slab Construction- This construction is based on the structural element that highly
versatile in nature. It is the dynamic and versatile structure which used in widely in the
construction process (Grahamand Warren-Myers, 2019). It has faster construction and minimum
depth in the flat slab. This system will provide the column grid structure that flexible wherever,
The engineer always concern about the fires and acoustic so that this flat slab structure suitable
for the construction project. This construction will beneficial for organization to increase the
efficiency of energy allows exploiting of thermal mass building according to their cooling need,
ventilation design and heating etc.
Twin Wall technology- This technology is based on the hybrid solution of wall system
that combine with the quality of precast concrete and erection speed. It is a type of wall system
guarantee infrastructure that integrated with the waterproof structure provide the reliability. This
is a modern construction process to increase the speed as compare to another method in term of
economical or sustainability. This process is mainly associated with the construction of precast
floor.
Sustainable construction-
Sustainability is a term that describe the different activities without harmful impact on the
constructions. BAM Nuttall firm is focused towards the sustainable building and structure to
provide the facilities for people to develop the environmental friendly design. It is responsible
the construction process, design, operations, maintenance and renovation to construct the
sustainable building (Popat and et.al., 2018). It is important for construction business to ensures
that all the resources are applied in the project to create a dynamic construction in proper
manner. On the other hand, It is considered the environmental friendly raw material that used in
the project development. There are different type of element that make sustainable building in
proper manner.
BAM Nuttall firm uses the proper insulation for making building.
This firm is design the proper airtightness to build the right ventilation.
It can be used the best thermal mass for building the structure because it easily absorbs
warmth from the sun at time of days.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

It is mandatory part to use the natural light through roof lights, pipes, windows etc. this
will help for reduce the artificial lighting and increase the amount of natural light in
buildings.
The organization can choose the green and sustainable materials to ensure that the
product and materials is efficient to manage the energy and minimize the demand of
power proportion to the carbon in the building materials.
P7 Contract planning technique used within micro and macro projects.
Contract planning technique is become integral part of the development cycle that
applicable in the micro and macro project to manage their task in proper manner. Contract
technique is making plan and assist the manger to properly control or manage the contracts
through performance management, monitoring, transition management. This will help to ensure
the parties fulfil their commitments and commercial contracts. In BAM Nuttall Ltd, This
organization is mainly concern bout the contract planning to maintain the proper deadline to
completed the task in proper ways. Contract planning is applied in the both macro and micro
project that manage the challenging activity for the execution of construction project so that it is
needed for BAM Nuttall to choose the best planning for increase the profitability and
productivity in global world. There are three stages that help in contract planning to maintain
their bound between the manager and client.
Contract Evaluation- It is a process and activity to assess the programmatic progress and
technical contractors, deliverables and approaches that identify or analysis the entire procedure
of contract (Volk Jeong and Shane, 2018). This will help for organization to manage the
performance of task and also making correlation with the information to maintain or adjust the
resources to achieve the goals of organization. It also evaluates the necessary need and
requirement such as construction schedule, organization chart, external quotations, Bill of
quantities, statements method, specifications etc. these are important elements that maintain at
the time of contract management.
Construction plans- In BAM Nuttall firm, the engineer uses the type of method to plan
related the project. This organization always planning an effective strategy with the help of
engineer to visualize sequence of executing in the project. It can be represented in the form of
graphical, presentable and table format. Engineer is used the different method and application to
identify the need and requirement of project. For Example – Pert chart is the best technique to
will help for reduce the artificial lighting and increase the amount of natural light in
buildings.
The organization can choose the green and sustainable materials to ensure that the
product and materials is efficient to manage the energy and minimize the demand of
power proportion to the carbon in the building materials.
P7 Contract planning technique used within micro and macro projects.
Contract planning technique is become integral part of the development cycle that
applicable in the micro and macro project to manage their task in proper manner. Contract
technique is making plan and assist the manger to properly control or manage the contracts
through performance management, monitoring, transition management. This will help to ensure
the parties fulfil their commitments and commercial contracts. In BAM Nuttall Ltd, This
organization is mainly concern bout the contract planning to maintain the proper deadline to
completed the task in proper ways. Contract planning is applied in the both macro and micro
project that manage the challenging activity for the execution of construction project so that it is
needed for BAM Nuttall to choose the best planning for increase the profitability and
productivity in global world. There are three stages that help in contract planning to maintain
their bound between the manager and client.
Contract Evaluation- It is a process and activity to assess the programmatic progress and
technical contractors, deliverables and approaches that identify or analysis the entire procedure
of contract (Volk Jeong and Shane, 2018). This will help for organization to manage the
performance of task and also making correlation with the information to maintain or adjust the
resources to achieve the goals of organization. It also evaluates the necessary need and
requirement such as construction schedule, organization chart, external quotations, Bill of
quantities, statements method, specifications etc. these are important elements that maintain at
the time of contract management.
Construction plans- In BAM Nuttall firm, the engineer uses the type of method to plan
related the project. This organization always planning an effective strategy with the help of
engineer to visualize sequence of executing in the project. It can be represented in the form of
graphical, presentable and table format. Engineer is used the different method and application to
identify the need and requirement of project. For Example – Pert chart is the best technique to

analyse the planning and scheduling of large complex project in effective manner. Construction
planning is including to analysis the implications of activities, task scheduling, identifying
relations etc.
Scheduling and coordination- This is the process for filtering the final project plans
within specified time scale. It shows the actual duration that applicable in the project
development. There are different various construction activities performed so that it is required
for records and capture all the time or quality in effective manner. In BAM Nuttall, manager
always considered the proper format to manage the different operations and function in
systematic ways (Otali and Oladokun, 2018). It is also necessary for contract manager to build
strong team and coordination towards the work in every departments. This will help for
construction management to increase the production and cost in marketplace. A great team is
utilized the resources to complete the construction project in particular durations.
P8 Building information modelling impact on the operations of construction companies
Building information modelling is a tool that applied in the BAM Nuttall construction
firm to building the architecture and structure in effective ways. Nowadays, this model is playing
important role in the organization that help for spanning the management and generation of
functional or physical information regarding the project. BIM is shared the proper knowledge of
resources to provide the details about the forming on the basis of decision at the time of life
cycle.
BIM impact on BAM Nuttall construction firm-
Building information modelling appears to increase the productivity and profitability in
the labour. It is directly impact the productivity of labour that finding and quantified
demonstrated between 70% to 250% in different areas. This model allows for virtual information
model to interact with the design team to different subcontractor and main contractor. In this
way, the entire system can be designed in proper ways to reduce the loss information that used
into another project development (lreshid, Mourshed and Rezgui, 2018).
Building model is relatively new technology that especially beneficial for construction
industry to increase the development technique in term of improvements.
It is improved the visualization
planning is including to analysis the implications of activities, task scheduling, identifying
relations etc.
Scheduling and coordination- This is the process for filtering the final project plans
within specified time scale. It shows the actual duration that applicable in the project
development. There are different various construction activities performed so that it is required
for records and capture all the time or quality in effective manner. In BAM Nuttall, manager
always considered the proper format to manage the different operations and function in
systematic ways (Otali and Oladokun, 2018). It is also necessary for contract manager to build
strong team and coordination towards the work in every departments. This will help for
construction management to increase the production and cost in marketplace. A great team is
utilized the resources to complete the construction project in particular durations.
P8 Building information modelling impact on the operations of construction companies
Building information modelling is a tool that applied in the BAM Nuttall construction
firm to building the architecture and structure in effective ways. Nowadays, this model is playing
important role in the organization that help for spanning the management and generation of
functional or physical information regarding the project. BIM is shared the proper knowledge of
resources to provide the details about the forming on the basis of decision at the time of life
cycle.
BIM impact on BAM Nuttall construction firm-
Building information modelling appears to increase the productivity and profitability in
the labour. It is directly impact the productivity of labour that finding and quantified
demonstrated between 70% to 250% in different areas. This model allows for virtual information
model to interact with the design team to different subcontractor and main contractor. In this
way, the entire system can be designed in proper ways to reduce the loss information that used
into another project development (lreshid, Mourshed and Rezgui, 2018).
Building model is relatively new technology that especially beneficial for construction
industry to increase the development technique in term of improvements.
It is improved the visualization

It is beneficial for improvement in the context of profitability and productivity through
the information and data retrieval.
It is increased the coordination between the documentation that used in the construction
project.
This model will help for linking the information to vendor for the purpose of specific
materials, quantities for tendering and location details.
It is also beneficial for increasing the speed for delivered the project on time to the client.
It is also helpful for decreasing the overall cost of project.
the information and data retrieval.
It is increased the coordination between the documentation that used in the construction
project.
This model will help for linking the information to vendor for the purpose of specific
materials, quantities for tendering and location details.
It is also beneficial for increasing the speed for delivered the project on time to the client.
It is also helpful for decreasing the overall cost of project.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Illustration 1: Benefits of BIM process
(Source: Building information Model, 2018)
(Source: Building information Model, 2018)

Impact on Today's industry- Higher Quality- Building information modelling allow for flexible in the term of
exploration and also change the design project and documents process at any tome
without having hassle in between the team. This result will help for minimize the
coordination time and manually check the entire architecture in effective ways. In BAM
Nuttall firm, the design team have more time to manage and solve the real time problem
in proper manner. There are some common modelling platform and tool provide the
decision related to the execution of project, design and control over technical needs. It is
also record the building renovations that help for improve the management and planning. Greater Speed- Building information modelling enables for create design and
documentation work done in properly. This tool is beneficial for maintain the schedule
estimation, diagram, planning and engineering etc. It can be created the work
communication in dynamically (Oseni, Robinson and Fong, 2018). BIM tool is modify
the entire project infrastructure to adopt the new ideas in the development of project. In
this way, it helps for increasing the speed and performance of task to complete the entire
work in proper time intervals. BAM firm is also used this model to create an effective
structure according to requirement of client. Lower cost- In the organization, Smaller team is used the building information modelling
that allow for completing the task in properly. It also helps for minimize the cost and
decrease the misconception in the communication between the team members. There are
less money and time invest in the construction process by using the BIM model. The
administrator plays important role in the firm to use the BIM model for increasing the
quality of documentation so that it will develop the better construction planning for
development.
exploration and also change the design project and documents process at any tome
without having hassle in between the team. This result will help for minimize the
coordination time and manually check the entire architecture in effective ways. In BAM
Nuttall firm, the design team have more time to manage and solve the real time problem
in proper manner. There are some common modelling platform and tool provide the
decision related to the execution of project, design and control over technical needs. It is
also record the building renovations that help for improve the management and planning. Greater Speed- Building information modelling enables for create design and
documentation work done in properly. This tool is beneficial for maintain the schedule
estimation, diagram, planning and engineering etc. It can be created the work
communication in dynamically (Oseni, Robinson and Fong, 2018). BIM tool is modify
the entire project infrastructure to adopt the new ideas in the development of project. In
this way, it helps for increasing the speed and performance of task to complete the entire
work in proper time intervals. BAM firm is also used this model to create an effective
structure according to requirement of client. Lower cost- In the organization, Smaller team is used the building information modelling
that allow for completing the task in properly. It also helps for minimize the cost and
decrease the misconception in the communication between the team members. There are
less money and time invest in the construction process by using the BIM model. The
administrator plays important role in the firm to use the BIM model for increasing the
quality of documentation so that it will develop the better construction planning for
development.

LO4
P9 how health and safety has how become an integrated part of construction process.
Health and safety is important for organization to provide the facilities and services to
their employee in BAM Nuttall firm. It is necessary for organization to increase the fatality rate
in UK than across all over the world. There are large number of employee work in the
construction business so that there are more chances related to the fatalities. According to
analysis, it can be identified that there are 5% employee worker in construction enterprises and
10% reported the major injuries and massive disaster in every year.
High risk to employee at workplace- In BAM Nuttall, this organization will perform
different operations and functions such as building, roadworks, demolition and refurbishment
etc. There are more chances to increase the risk beyond at their workplace. There is a major
difference between the risk that presented to the worker at workplace as compare to other
enterprise like retail, finance.
The fatal facts on site dangers- Each and every risk presented at the construction site
which are well documented in proper format. On the basis of analysis, 39 worker has been died
on the sites of construction in United Kingdom in 2013. On the other hand, the large number of
accident rises in every yeas(Oseni, Robinson and Fong, 2018). BAM Nuttall firm has large
budget that afford in proper ways and also measure the heath or safety practices. The risk is not
just the same but may changes according to the situation so that it needed for construction
business to designed proper safety aspects to reduce the accident on the sites.
Objects falling from higher level/ height- BAM Nuttall firm always construct the various
type of building in every year. They also do work on the big budget so that there are large
number of workers required for development of building. In this way, it will increase the risk of
workers regarding the health and safety. Sometimes, many workers are falling from the height of
building due to accident. It causes affect the reputation of organization so that it is necessary for
firm to always maintain their safety aspects on the construction site. For Example- In 2012-2017,
the worker falling to the height of building during the construction.
P9 how health and safety has how become an integrated part of construction process.
Health and safety is important for organization to provide the facilities and services to
their employee in BAM Nuttall firm. It is necessary for organization to increase the fatality rate
in UK than across all over the world. There are large number of employee work in the
construction business so that there are more chances related to the fatalities. According to
analysis, it can be identified that there are 5% employee worker in construction enterprises and
10% reported the major injuries and massive disaster in every year.
High risk to employee at workplace- In BAM Nuttall, this organization will perform
different operations and functions such as building, roadworks, demolition and refurbishment
etc. There are more chances to increase the risk beyond at their workplace. There is a major
difference between the risk that presented to the worker at workplace as compare to other
enterprise like retail, finance.
The fatal facts on site dangers- Each and every risk presented at the construction site
which are well documented in proper format. On the basis of analysis, 39 worker has been died
on the sites of construction in United Kingdom in 2013. On the other hand, the large number of
accident rises in every yeas(Oseni, Robinson and Fong, 2018). BAM Nuttall firm has large
budget that afford in proper ways and also measure the heath or safety practices. The risk is not
just the same but may changes according to the situation so that it needed for construction
business to designed proper safety aspects to reduce the accident on the sites.
Objects falling from higher level/ height- BAM Nuttall firm always construct the various
type of building in every year. They also do work on the big budget so that there are large
number of workers required for development of building. In this way, it will increase the risk of
workers regarding the health and safety. Sometimes, many workers are falling from the height of
building due to accident. It causes affect the reputation of organization so that it is necessary for
firm to always maintain their safety aspects on the construction site. For Example- In 2012-2017,
the worker falling to the height of building during the construction.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

P10 Describe the government legislation which has benchmarked health and safety within
construction.
The government legislation that benchmarked to the health and safety in the construction
business. In UK, this legislation is requires for management of organization to handle all the
complication in proper manner. In this way, employee understand their equal rights towards the
workplace. They also measure the risk on the construction sites. There are different ways to
control and manager the health and safety aspects in the construction business in order to
minimize the accident and fatality to the workers. Government always maintain their
commitment towards the working environment and provide the services to employee in effective
manner. This commitment reflect towards the employee to increase the performance at
workplace because legislation set the performance objectives and encourage the employee
towards the regulations.
The health and safety act 1974 at workplace provide the facilities to their employee
regarding the instruction, training, supervision and information because they understand their
equal rights which needed for protection to the health of employee. This law is managed by the
government to maintain their health related issues on construction sites(Oseni, Robinson and
Fong, 2018).
The health and safety act 1999 generally beneficial for employee that required to manage
their health because it will give more chances to follow this regulation at their workplace.
The construction management and design CDM 1994 to 2007, This regulation is
explicitly detailed need and requirement those who are directly influence towards the
construction sites safety and health during the planning and pre construction. There are different
type of law and regulation applicable in the construction business.
Health and safety Act 1974 at workplace-
The Notifications related to the improvement and prohibition
The health and safety executive and commission manage the regulation.
Follow the duties under the Act.
Prosecutions, offences and penalties.
construction.
The government legislation that benchmarked to the health and safety in the construction
business. In UK, this legislation is requires for management of organization to handle all the
complication in proper manner. In this way, employee understand their equal rights towards the
workplace. They also measure the risk on the construction sites. There are different ways to
control and manager the health and safety aspects in the construction business in order to
minimize the accident and fatality to the workers. Government always maintain their
commitment towards the working environment and provide the services to employee in effective
manner. This commitment reflect towards the employee to increase the performance at
workplace because legislation set the performance objectives and encourage the employee
towards the regulations.
The health and safety act 1974 at workplace provide the facilities to their employee
regarding the instruction, training, supervision and information because they understand their
equal rights which needed for protection to the health of employee. This law is managed by the
government to maintain their health related issues on construction sites(Oseni, Robinson and
Fong, 2018).
The health and safety act 1999 generally beneficial for employee that required to manage
their health because it will give more chances to follow this regulation at their workplace.
The construction management and design CDM 1994 to 2007, This regulation is
explicitly detailed need and requirement those who are directly influence towards the
construction sites safety and health during the planning and pre construction. There are different
type of law and regulation applicable in the construction business.
Health and safety Act 1974 at workplace-
The Notifications related to the improvement and prohibition
The health and safety executive and commission manage the regulation.
Follow the duties under the Act.
Prosecutions, offences and penalties.

The construction design and management regulation in 1994-
According to this law, it can be followed some specific regulations to manage their health
and safety services in proper manner.
At least more than 4 worker will be one construction sites at one time.
The actual time duration of construction phase will be exceed in 500 working days.
The construction phase is also longer than 30 days.
P11 Discuss role of collaboration and communication in ensuring safe working practices.
It is required for BAM firm to maintain and develop the positive culture regarding the
safety or health because there are lot issues generated in this construction business. This
organization will face many issues regarding the time demands, sequence of task etc. Safe
working is always used for describing the attitudes, beliefs, values and norms that collaborate
with the construction process. BAM Nuttall firm were used the various approach to communicate
with the workers to provide the facilities and services in effective manner.
Collaboration allows for team members to communicate with the other by using common
platform. It also works together to achieve their goals and objectives.
Health and safety is required for construction business to provide the equal rights to their
employee and also participate or communicate related the ideas towards the construction
of buildings.
Collaboration and communication are mutually beneficial in the term of safe working at
workplace. Construction manager also gives the instruction and training for worker to do
their job in properly and also considered all the necessary safety equipment that used at
the time of work(Oseni, Robinson and Fong, 2018).
Communication and collaboration are required for employee to finish their project on
time and also aware about project development. Manager always divided the work
according to their capabilities and abilities. It is necessary to expertise in their work to
handle all type of complication effectively and efficiently.
According to this law, it can be followed some specific regulations to manage their health
and safety services in proper manner.
At least more than 4 worker will be one construction sites at one time.
The actual time duration of construction phase will be exceed in 500 working days.
The construction phase is also longer than 30 days.
P11 Discuss role of collaboration and communication in ensuring safe working practices.
It is required for BAM firm to maintain and develop the positive culture regarding the
safety or health because there are lot issues generated in this construction business. This
organization will face many issues regarding the time demands, sequence of task etc. Safe
working is always used for describing the attitudes, beliefs, values and norms that collaborate
with the construction process. BAM Nuttall firm were used the various approach to communicate
with the workers to provide the facilities and services in effective manner.
Collaboration allows for team members to communicate with the other by using common
platform. It also works together to achieve their goals and objectives.
Health and safety is required for construction business to provide the equal rights to their
employee and also participate or communicate related the ideas towards the construction
of buildings.
Collaboration and communication are mutually beneficial in the term of safe working at
workplace. Construction manager also gives the instruction and training for worker to do
their job in properly and also considered all the necessary safety equipment that used at
the time of work(Oseni, Robinson and Fong, 2018).
Communication and collaboration are required for employee to finish their project on
time and also aware about project development. Manager always divided the work
according to their capabilities and abilities. It is necessary to expertise in their work to
handle all type of complication effectively and efficiently.

CONCLUSION
From above study, it concluded that Construction management is a process that used for
planning, constructing and designing the project effectively and efficiently It also describes that
how construction management process can control the cost, quality and time of entire project in
the firm. It discusses about the identify the modern construction processes and sequences used
within the organization and also highlight the main point that needed for sustainability. It
summarized the contract planning technology applied in the both micro and macro projects.
Building information modelling tool impact on the business operations and function in the
construction firm. Furthermore, This report describes the government legislation which
beneficial for the purpose of health and safety to the employee during the construction process in
the organization. On the other hand, health and safety that directly integrated with the process of
construction process.
From above study, it concluded that Construction management is a process that used for
planning, constructing and designing the project effectively and efficiently It also describes that
how construction management process can control the cost, quality and time of entire project in
the firm. It discusses about the identify the modern construction processes and sequences used
within the organization and also highlight the main point that needed for sustainability. It
summarized the contract planning technology applied in the both micro and macro projects.
Building information modelling tool impact on the business operations and function in the
construction firm. Furthermore, This report describes the government legislation which
beneficial for the purpose of health and safety to the employee during the construction process in
the organization. On the other hand, health and safety that directly integrated with the process of
construction process.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

REFERENCES
Books and Journals:
Castillo, T., Alarcón, L.F. and Pellicer, E., 2018. Finding Differences among Construction
Companies Management Practices and Their Relation to Project Performance. Journal of
Management in Engineering, 34(3), pp.1-13.
Graham, E. and Warren-Myers, G., 2019. Investigating the efficacy of a professional education
program in promoting sustainable residential construction practices in Australia. Journal
of Cleaner Production, 210, pp.1238-1248.
Popat, N. and et.al., 2018, April. Development, Adoption and Implementation of Fabrication Site
Construction Safety Recommended Practices. In SPE International Conference and
Exhibition on Health, Safety, Security, Environment, and Social Responsibility. Society of
Petroleum Engineers.
Volk, M.J., Jeong, R.S. and Shane, J.S., 2018. Effective Post-Construction Evaluation Practices
for Work Zone Management Strategies. Transportation Research Record,
p.0361198118797207.
Otali, M. and Oladokun, M.G., 2018. Evaluation of level of adoption of sustainability practices
among construction firms in the Niger Delta states of Nigeria. Journal of Construction
Project Management and Innovation, 8(1), pp.1711-1737.
Alreshidi, E., Mourshed, M. and Rezgui, Y., 2018. Requirements for cloud-based BIM
governance solutions to facilitate team collaboration in construction
projects. Requirements engineering, 23(1), pp.1-31.
Oseni, W., Robinson, H. and Fong, D., 2018. Healthcare Facilities in Nigeria: Redefining
Standards and Developing Performance Benchmarks for the Professionalisation of FM
Practices, Professionalism and ethics in construction: Improving the global industry.
Books and Journals:
Castillo, T., Alarcón, L.F. and Pellicer, E., 2018. Finding Differences among Construction
Companies Management Practices and Their Relation to Project Performance. Journal of
Management in Engineering, 34(3), pp.1-13.
Graham, E. and Warren-Myers, G., 2019. Investigating the efficacy of a professional education
program in promoting sustainable residential construction practices in Australia. Journal
of Cleaner Production, 210, pp.1238-1248.
Popat, N. and et.al., 2018, April. Development, Adoption and Implementation of Fabrication Site
Construction Safety Recommended Practices. In SPE International Conference and
Exhibition on Health, Safety, Security, Environment, and Social Responsibility. Society of
Petroleum Engineers.
Volk, M.J., Jeong, R.S. and Shane, J.S., 2018. Effective Post-Construction Evaluation Practices
for Work Zone Management Strategies. Transportation Research Record,
p.0361198118797207.
Otali, M. and Oladokun, M.G., 2018. Evaluation of level of adoption of sustainability practices
among construction firms in the Niger Delta states of Nigeria. Journal of Construction
Project Management and Innovation, 8(1), pp.1711-1737.
Alreshidi, E., Mourshed, M. and Rezgui, Y., 2018. Requirements for cloud-based BIM
governance solutions to facilitate team collaboration in construction
projects. Requirements engineering, 23(1), pp.1-31.
Oseni, W., Robinson, H. and Fong, D., 2018. Healthcare Facilities in Nigeria: Redefining
Standards and Developing Performance Benchmarks for the Professionalisation of FM
Practices, Professionalism and ethics in construction: Improving the global industry.

Online:
Building information Model. 2018. [online] Available
through:<https://d262ilb51hltx0.cloudfront.net/max/800/0*4uhg4fJKNTaOzMWy.>
Building information Model. 2018. [online] Available
through:<https://d262ilb51hltx0.cloudfront.net/max/800/0*4uhg4fJKNTaOzMWy.>

Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.

1
1 out of 17
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.