Construction Project Analysis: Resource Allocation and Durations

Verified

Added on  2021/06/15

|8
|898
|22
Project
AI Summary
Document Page
Running Head: CONSTRUCTION MANAGEMENT
Construction Management
Name of the Student
Name of the University
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1CONSTRUCTION MANAGEMENT
Task 3
Resources Required:
Resource Name Type
Max.
Units
Std. Rate Ovt. Rate Cost/Use Accrue At
Base
Calendar
Construction
Manager
Work 100% $200.00/hr $0.00/hr $0.00 Prorated Standard
Construction
Supervisor
Work 100% $150.00/hr $0.00/hr $0.00 Prorated Standard
External and
Internal Works
Supervisor
Work 100% $125.00/hr $0.00/hr $0.00 Prorated Standard
Laborer Material $25.00 $0.00 Prorated
Building
Materials
Material $15,000.00 $0.00 Prorated
Bulldozer Work 100% $15.00/hr $0.00/hr $0.00 Prorated Standard
Crane Work 100% $12.00/hr $0.00/hr $0.00 Prorated Standard
Concrete Mixer Work 100% $8.00/hr $0.00/hr $0.00 Prorated Standard
Document Page
2CONSTRUCTION MANAGEMENT
Other Costs Material $15,000.00 $0.00 Prorated
Resource Allocation and Durations:
Task Name
Duratio
n
Start Finish
Predecessor
s
Resource Names Cost
Constructio
n Work
Project
200 days
Mon
6/11/18
Fri
3/15/19
$475,443.0
0
Site
Preparation
25 days
Mon
6/11/18
Fri
7/13/18
$3,500.00
Clearing
of the Site
5 days
Mon
6/11/18
Fri
6/15/18
Bulldozer, Labourer [5] $725.00
Flatten
the Site
10 days
Mon
6/18/18
Fri
6/29/18
2 Bulldozer, Labourer [5] $1,325.00
Remove
grass and
plants from
the land
5 days
Mon
7/2/18
Fri
7/6/18
3 Bulldozer, Labourer [5] $725.00
Add soil
for increasing
5 days Mon Fri 4 Bulldozer, Labourer [5] $725.00
Document Page
3CONSTRUCTION MANAGEMENT
site strength 7/9/18 7/13/18
Foundatio
n
40 days
Mon
7/16/18
Fri
9/7/18
$155,875.0
0
Excavatio
n of the Site
15 days
Mon
7/16/18
Fri
8/3/18
5
Building Materials
[1],Construction Manager,
Construction Supervisor,
Labourer [5]
$57,125.00
Preparati
on of
Foundation
5 days
Mon
8/6/18
Fri
8/10/18
7
Construction Manager,
Construction Supervisor,
Labourer [5]
$14,125.00
Placemen
t of
Foundation
Slabs
10 days
Mon
8/13/18
Fri
8/24/18
8
Construction Manager,
Construction Supervisor,
Labourer [5]
$28,125.00
Install
Footings
10 days
Mon
8/13/18
Fri
8/24/18
8
Construction Manager,
Construction Supervisor,
Labourer [ 5]
$28,125.00
Apply
Concrete
5 days
Mon
8/27/18
Fri
8/31/18
9,10
Construction Manager,
Construction Supervisor,
Labourer [5]
$14,125.00
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
4CONSTRUCTION MANAGEMENT
Complete
Foundation
2 days
Mon
9/3/18
Tue
9/4/18
11
Construction Manager,
Construction Supervisor,
Labourer [5]
$5,725.00
Fill the
Empty
Spaces with
Soil
3 days
Wed
9/5/18
Fri
9/7/18
12
Construction Manager,
Construction Supervisor,
Labourer [5]
$8,525.00
Structure 95 days
Mon
9/10/18
Fri
1/18/19
$204,443.0
0
Start
Building the
Structure
2 days
Mon
9/10/18
Tue
9/11/18
13
Building Materials
[1],Construction Manager,
Construction Supervisor,
Labourer [15]
$20,975.00
Develop
the Structural
Framework
48 days
Wed
9/12/18
Fri
11/16/1
8
15
Construction Manager,
Construction Supervisor,
Labourer [15],Crane
$139,383.0
0
Install
Bricks
15 days
Mon
11/19/1
8
Fri
12/7/18
16
Construction Manager,
Construction Supervisor,
Labourer [15]
$42,375.00
Apply
Concrete
15 days Mon
12/10/1
Fri
12/28/1
17 Concrete Mixer, Labourer $1,335.00
Document Page
5CONSTRUCTION MANAGEMENT
8 8 [15]
Apply
Plaster
15 days
Mon
12/31/1
8
Fri
1/18/19
18 Labourer [15] $375.00
Internal
Finishes
50 days
Mon
11/19/1
8
Fri
1/25/19
$65,500.00
Install
Wirings
10 days
Mon
11/19/1
8
Fri
11/30/1
8
16
External and Internal
Works Supervisor,
Labourer [5],Other Costs
[1]
$25,125.00
Install
Drainage
System
10 days
Mon
11/19/1
8
Fri
11/30/1
8
16
External and Internal
Works Supervisor,
Labourer [5]
$10,125.00
Build
Doors and
Windows
10 days
Mon
12/10/1
8
Fri
12/21/1
8
17
External and Internal
Works Supervisor,
Labourer [5]
$10,125.00
Apply
Color on
Walls
5 days Mon
1/21/19
Fri
1/25/19
19,21,22,23 External and Internal
Works Supervisor,
Labourer [5],Other Costs
$20,125.00
Document Page
6CONSTRUCTION MANAGEMENT
[1]
External
Finishes
15 days
Mon
1/21/19
Fri
2/8/19
$15,375.00
Dry the
Plaster
5 days
Mon
1/21/19
Fri
1/25/19
19
External and Internal
Works Supervisor,
Labourer [5]
$5,125.00
Apply
Color on
Walls
5 days
Mon
1/28/19
Fri
2/1/19
26
External and Internal
Works Supervisor,
Labourer [5]
$5,125.00
Add
Designs if
Necessary
5 days
Mon
2/4/19
Fri
2/8/19
27
External and Internal
Works Supervisor,
Labourer [5]
$5,125.00
External
Works
25 days
Mon
2/11/19
Fri
3/15/19
$30,750.00
Connect
Draining
System with
Water Tanks
5 days
Mon
2/11/19
Fri
2/15/19
24,28
Labourer [10], Other Costs
[1]
$15,250.00
Connect
electrical
5 days Mon Fri 30 Labourer [10] $250.00
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7CONSTRUCTION MANAGEMENT
wirings with
main line
2/18/19 2/22/19
Finishing
Works
15 days
Mon
2/25/19
Fri
3/15/19
31
Labourer [10], Other Costs
[1]
$15,250.00
Assumptions:
It has been assumed that the estimated rates for the resources are standard and feasible for
the project.
It has been assumed that the number of resources like laborers, materials and others.
The dependencies of activities are assumed to be accurate and feasible for the project.
chevron_up_icon
1 out of 8
circle_padding
hide_on_mobile
zoom_out_icon
logo.png

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]