Detailed Construction Schedule Report for Control Room Project
VerifiedAdded on  2022/09/25
|13
|798
|22
Report
AI Summary
This report presents a comprehensive construction schedule for a proposed control room project. It begins with a Work Breakdown Structure (WBS) to outline the project's major deliverables and sub-steps. A Precedence Diagram Method (PDM) is then used to visualize the construction tasks and identify the critical path. The report also includes a detailed resource analysis, estimating the equipment, resources, and human resources required for each activity. Cost estimates are provided, covering labor, overheads, materials, and site establishment. The time analysis identifies major tasks and their order, and a construction schedule diagram is included. The report concludes with references to relevant sources. The report covers site preparation, foundation, structural works, floor slab, formwork, wall work, M&E, and finishes.