Construction Methods and Technology Report: Site Setup and Planning

Verified

Added on  2023/03/20

|19
|2137
|59
Report
AI Summary
This report delves into the critical stages of construction, from site setup to project planning. It emphasizes the importance of proper planning and coordination, including safety measures, traffic management, and material storage. The report introduces and analyzes design, tabulated, and descriptive method statements, providing detailed examples and calculations for various construction tasks. It covers site clearance, security, and the establishment of temporary site facilities. The report also includes calculations for material quantities and costs, alongside program planning considerations. It highlights the significance of method statements in outlining project details and safety protocols. The document concludes with references and appendices, including site plans and safety instructions.
Document Page
1CONSTRUCTION METHODS AND TECHNOLOGY
Construction Methods and Technology
Professor
Class
Name
Date
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
2CONSTRUCTION METHODS AND TECHNOLOGY
Introduction
When construction is taking place, there are several stages the construction goes through for an effective
product being constructed to come out well. When a stage is skipped, losses can be incurred in terms of
time wastages to recover the left part, and waste of material, especially if demolition is involved. For the
various stages of construction, there must be a proper planning done by either the project manager, or the
architect, or even any stake holder of the project. The report herein, will show the stages from the time the
site is set up, or from the design stage of the project and design methods, through to planning the project,
where there shall be a presentation of calculations of the long the project shall take, determining the
program so that an overall programme for the whole project can be established.
The site needs to be prepared to take care of safety measures for protecting the persons who will work on
the site, those visiting the site and the environment where the construction will occur. The site
management needs to make sure that there’s a proper coordination to those who are supposed to deliver
tools, personnel and materials that shall be used on site. This stage of site set up should be done carefully
and not rushed, the construction manager needs to make the crucial decisions (Turnbull, 2017). Other
activities involved in site setup includes
Traffic management, ensuring the vehicles are not posing any danger to people,
Protection, which ensures that the people visiting the site are protected from hazards, protection also
could mean restricting entrance to site,
Storage facilities and dealing with wastes, the materials brought to site should be stored well because
others like cement are damaged when exposed in moisture.
Welfare, this involves meeting the local authorities and legal requirements, others are like providing
washrooms/toilets, safe water for drinking, changing rooms etc.
Administrative measures, which ensures that the site is approved to have met safety standards and the
standard operational procedures, like the paperwork etc (Health and Safety Executive, 2019).
A good site setup is necessary because it displays the professionalism in the parties involved to the public,
and the client. When the site is properly setup, issues to do with time management and organization are
tackled easily.
It is important to know what a method statement is in construction, since this paper widely uses methods
statements in analysing the work. A method statement as widely used in construction, which others refer
to it as a safe system work, is a document prepared to display or present the details involved in a project
and how they are to be completed (Murphy, 2016). Method statement include the hazards that are going to
be encountered and how to overcome them by explaining or listing a step by step methods of doing jobs
safely. There are control measures that are being introduced that guarantees safety of persons who might
be affected by the tasks or work being carried out. These details, in some construction works, must be
presented during tender period for evaluation of a company’s operation module and if a company is able
to undertake the job at hand (Designing Buildings Wiki, 2018). This paper shall look at design, tabulated,
and descriptive method statements.
Document Page
3
CONSTRUCTION METHODS AND TECHNOLOGY
Figure 1:Design Method Statement -1
Document Page
4
CONSTRUCTION METHODS AND TECHNOLOGY
Figure 2:Design Method Statement -2
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
5
CONSTRUCTION METHODS AND TECHNOLOGY
Figure 3:Design Method Statement -3
Document Page
6
CONSTRUCTION METHODS AND TECHNOLOGY
Figure 4: Design Method Statement -4
Document Page
7
CONSTRUCTION METHODS AND TECHNOLOGY
Figure 5: Design method statement -5
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
8
CONSTRUCTION METHODS AND TECHNOLOGY
Figure 6: Design Method statement – 6
Document Page
9
CONSTRUCTION METHODS AND TECHNOLOGY
Tabulated Method Statement
Rank of labour
Rate per
hour Day Rate
Craft Operator £16.30 £130.40
Skill rate 1 £15.40 £123.20
Skill rate 2 £14.60 £116.80
Skill rate 3 £13.20 £105.60
Skill rate 4 £12.11 £96.88
General Operative £10.34 £82.72
DMS NO.
ITEM
NO. SCOPE
MATERIAL
QTY
MATERIAL
COST
PLANT
QTY
PLANT
COST
LABOUT
QTY
LABOUR
COST
TIME
DURATION
START
DATE
END
DATE REMARKS
1.
Prepossession
of the site 1
Site clearance
removal of tree
stumps and
vegetation. Levelling
the site in readiness
for construction.
Removal of shrubs
and other unwanted
materials from the
place parked for
construction. N/A
£500 on
hiring the
grader. N/A N/A
4. No. One is
the sib-
contractor and
three others
are casuals £100.00 2 days 12/03/2019 14/03/2019
Needed to
overstay
since the the
work wasn't
done well,
besides there
was enough
space for it
Securing the
site 2
Hoarding the site
with iron sheets
thereby restricting
access to site from
unwanted persons.
Fixing/installing an
entrance gate for the
official access point
of the site.
Purchasing a
container and fitting
it for the security
personnel to guard
the site and only
allow authorised
persons
(1) 120
3X1m iron
sheets (2) 2kg
of iron sheets
nails (3) 100
2m high
cedar posts
(4) 20 bags of
cement (5) 1
track of
ballast (6) 1
track of sand
£2900 overall
cost for all
the materials
mentioned
(1) 10
shovels
(2) 5
Augur
boring £230
15 persons for
doing all the
work £300 1 day 15/03/2019 16/03/2019
Sufficient
work done
but if we
could use the
machines for
boring the
holes, would
have been
hours
Document Page
10
CONSTRUCTION METHODS AND TECHNOLOGY
2 3
Fixing/construction
of the small buildings
used in site like the
temporary toilets, site
office, power house,
store house, and
preparation of space
for the materials to be
poured on
(1) Container
(2) Iron
sheets, (3)
Door hinges
(4) Boards
(for the
temporary
tables of the
office) (5)
Metal bars
(for fixing the
support of the
office and
store) (6) 15
50kg bags of
cement (6) 25
wheel
barrows of
sand (7) 30
wheel
barrows of
ballast. (8)
Hardcore
£3200 overall
cost, with the
container
costing
around £2400
of the amount
(1) 12
shovels
(2)
Augur
boring
(3) One
hired
crane
Overall
cost of
£800 12 people
£1200,
inclusive
of cost of
hiring the
crane for
one day 5 days 17/03/2019 22/03/2019
The number
of people
recommended
for the site
are 15
persons, to
avoid
overcrowding
3 4
Preparing the paths
for the tracks and
people to avoid
collusion and
accidents (1) Grader
£500 cost of
hiring for one
day N/A N/A (1) person
£45, the
grader
operator
working
for one
day 1 day 23/03/2019 24/03/2019
One was
enough, it
worked for
just some few
hours, shall
not be needed
since the
paths shall be
plain and will
be paved
during
landscape
period.
5
Linking the services
from the adjacent
building to the site.
i.e. Electrical and
Plumbing/supply of
water services from
Moulscoomb Maner
house
Shovels,
spanners,
earth loop
testers, glues
£170 for
purchasing
the other
materials
apart from
shovels N/A N/A
6 persons (3
people per
service)
£240
divided
equally 1 day 24/03/2019 25/03/2019
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
11
CONSTRUCTION METHODS AND TECHNOLOGY
The total cost for the set up of the project is £9,625
Descriptive Method Statements
DMS
NO. TMS ITEM
No. DESCRIPTION DURATION NOTES
1 1 1 Pre-construction stage on site NA
The site mobilization is yet to begin at this
stage, there's signing of contracts and agreeing
on terms
2 2 2
Possession of the site/site hand-
over. General clearance of the site,
like removal of surface, materials
like stumps of trees, shrubs, extra
grass, removing the trees on site
location, rocks being carted away,
and just general unwanted materials
removal
1 day
This period needs to be taken seriously since
those foreign materials at the construction site
could be dangerous and could affect not only the
tempo of construction bu quality of construction
as well
3 3 3
Hoarding and general site
security. This involves the
construction of hoarding to
barricade the site and protect it from
foreign unwanted persons. Also
hoarding helps in the security,
people might come and steal the
materials or the tools that are used.
Employing a security personnel and
building them a house
1 day
This period could take a longer time than
expected since, it depends on the site soil
structure. Also the supply of materials might
take longer. It might require prior planning
Document Page
12
CONSTRUCTION METHODS AND TECHNOLOGY
4 4 4
Installation of site buildings. These
are building that shall be used
during the contract administration
period, they include: Store (where
materials and tools shall be stored),
site office(where official site matters
shall be handled, also this will be a
place for conducting meetings),
temporary toilets (these shall be
carried and just installed on site),
and a section set aside for
construction materials like sand and
ballast to be poured or kept.
5 days
Another back-up time shall be left for this time,
since things like toilets being brought to site
depends on when they will be delivered. The
cranes that shall be used as well
5 5 5
Levelling of the ground to pave
ways for people and vehicles so that
when materials are delivered on site,
there shall be minimal (if any)
accidents.
1 day This also could take longer, maybe two days,
since it depends on the weather condition
6 6 6
Supply of Electricity and water to
the site. There shall be massive use
of electricity and water on site.
Especially water, shall be used to
mix the concrete for construction of
the sub and super structure of the
building. Electricity on the other
hand, shall be used for glazing,
grinding and welding of metal
works, light and power at the office
etc.
1 day
This should work well within schedule, since
the electricity is taken from an existing building
and not supplied by the authority