Business Project Report: Cloud Technology and Business Growth
VerifiedAdded on 2021/01/01
|20
|4272
|468
Report
AI Summary
This report, focusing on Continental Consulting Ltd., explores the impact of digital technology, particularly cloud computing, on small business growth and innovation. The report begins with an introduction highlighting the transformative role of digital technology in modern business, emphasizing cloud technology's importance for data storage and sharing. Task 1 outlines the project's aims and objectives, including the evaluation of cloud technology's effectiveness and the challenges faced during implementation. A project management plan covering scope, time, cost, communication, risk, and resources is also included. Task 2 delves into the research methodology, contrasting quantitative and qualitative research methods, and detailing the use of primary and secondary data collection techniques, including questionnaires. Task 3 presents an analysis of research findings and data, leading to recommendations and conclusions regarding cloud technology's impact. The report concludes with a reflection on the project's process and outcomes, referencing relevant sources to support the analysis. The report's structure covers project management, research methods, and data analysis within the context of a small business's digital transformation journey.

Managing Successful
Business Projects
Business Projects
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

Table of Contents
INTRODUCTION ..........................................................................................................................3
TASK 1............................................................................................................................................3
P1 Project aims and objectives...............................................................................................3
P2 Project management plan that covers aspects of cost, scope, time, quality, communication,
risk, and resources..................................................................................................................5
P3 Work breakdown structure and a Gantt chart ...................................................................6
..........................................................................................................................................................7
TASK 2............................................................................................................................................8
P4 Qualitative and quantitative research methods appropriate for meeting project aims and
objectives................................................................................................................................8
TASK 3..........................................................................................................................................11
P5 Analyse research and data using appropriate tools and techniques................................11
P6 Recommendations and conclusions................................................................................17
TASK 4..........................................................................................................................................18
P7 Reflection........................................................................................................................18
REFRENCES.................................................................................................................................19
INTRODUCTION ..........................................................................................................................3
TASK 1............................................................................................................................................3
P1 Project aims and objectives...............................................................................................3
P2 Project management plan that covers aspects of cost, scope, time, quality, communication,
risk, and resources..................................................................................................................5
P3 Work breakdown structure and a Gantt chart ...................................................................6
..........................................................................................................................................................7
TASK 2............................................................................................................................................8
P4 Qualitative and quantitative research methods appropriate for meeting project aims and
objectives................................................................................................................................8
TASK 3..........................................................................................................................................11
P5 Analyse research and data using appropriate tools and techniques................................11
P6 Recommendations and conclusions................................................................................17
TASK 4..........................................................................................................................................18
P7 Reflection........................................................................................................................18
REFRENCES.................................................................................................................................19

TOPIC: “The impact of digital supporting small business growth and innovation.”
INTRODUCTION
In modern era, digital technology has changed entire process of the operating business
activities. It also provide opportunities in which company can easily enhance their productivity
level. With the advancement of technology, each and every activity and aspects of the company
becomes easy and smoother as well. In this context, cloud technology is also playing a vital role
in business organization because it help in storing as well as sharing information in systematic
manner (Nicholas and Steyn, 2017). Current report is based on Continental Consulting Ltd,
which offer business solution to another companies for improving entire operational activities in
appropriate manner. Report also covers aims and objectives of the project which aid in
improving the chances of attaining positive outcomes. Project management plan is also
mentioned in this project. In addition of this, work breakdown structure and Gantt Chart is
discussed which provide time frame of entire activities. At the last, qualitative and quantitative
research methods are also includes through which researcher easily gather relevant data.
TASK 1
P1 Project aims and objectives
Every business organization wants to enhance their productivity level at market level. For
this company needs to use digital technology within their operational activities as it provides
various opportunities through which business organization improve their overall performance
level. In this context, digital technology is considered as a process of making as well implement
entire activities of company appropriately . For attaining set goals and objectives, new and
INTRODUCTION
In modern era, digital technology has changed entire process of the operating business
activities. It also provide opportunities in which company can easily enhance their productivity
level. With the advancement of technology, each and every activity and aspects of the company
becomes easy and smoother as well. In this context, cloud technology is also playing a vital role
in business organization because it help in storing as well as sharing information in systematic
manner (Nicholas and Steyn, 2017). Current report is based on Continental Consulting Ltd,
which offer business solution to another companies for improving entire operational activities in
appropriate manner. Report also covers aims and objectives of the project which aid in
improving the chances of attaining positive outcomes. Project management plan is also
mentioned in this project. In addition of this, work breakdown structure and Gantt Chart is
discussed which provide time frame of entire activities. At the last, qualitative and quantitative
research methods are also includes through which researcher easily gather relevant data.
TASK 1
P1 Project aims and objectives
Every business organization wants to enhance their productivity level at market level. For
this company needs to use digital technology within their operational activities as it provides
various opportunities through which business organization improve their overall performance
level. In this context, digital technology is considered as a process of making as well implement
entire activities of company appropriately . For attaining set goals and objectives, new and
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

innovative technology help in making communication and sharing information process effective.
This will help in attaining the positive outcomes. Under this concept , Cloud computing is one of
the important and innovative way to sharing and storing relevant data and information. With the
help of this, company can easily establish their positive brand image and at the same time also
capture market attention (Jeston, 2014). In context of Continental Consulting Ltd, company
provide business related solution to another companies in order to enhance their productivity
level at market place. By using Cloud technology, company can easily store and share huge
amount of data with entire department. This will help in managing entire activities of the
company.
Background of research:
Cloud computing refers to a method for delivering information technology services
through web based tools and application with the purpose of directly connecting to the server.
With the use of this, company can easily manage their entire activities for attaining desirable
results. In this context, Continental Consulting Ltd is a business consultancy which provide
services to another companies for improving their overall performance level. Mainly, company
operate their business at small scale with the aim of achieving higher success at market place.
For attaining the same, company needs to upgrade their application and system to maximize the
capabilities. In addition of this, concept of cloud computing can increase their efficiency level
through which company can easily improve their performance level (Keller, Parameswaran and
Jacob, 2011). By using this, company can easily share large number of data by using internet
internet. It may contribute in keeping data secure.
Research aim:
The main aim of this research is “To evaluate the effectiveness of cloud technology in
upgrading business activities. A case study on Continental Consulting Ltd.”
Research objectives:
To determine the concept of cloud technology.
To evaluate the importance of cloud technology in Continental Consulting Ltd while
improving their business activities.
To define the challenges faced by Continental Consulting Ltd while implementing cloud
technology.
Research Questions:
This will help in attaining the positive outcomes. Under this concept , Cloud computing is one of
the important and innovative way to sharing and storing relevant data and information. With the
help of this, company can easily establish their positive brand image and at the same time also
capture market attention (Jeston, 2014). In context of Continental Consulting Ltd, company
provide business related solution to another companies in order to enhance their productivity
level at market place. By using Cloud technology, company can easily store and share huge
amount of data with entire department. This will help in managing entire activities of the
company.
Background of research:
Cloud computing refers to a method for delivering information technology services
through web based tools and application with the purpose of directly connecting to the server.
With the use of this, company can easily manage their entire activities for attaining desirable
results. In this context, Continental Consulting Ltd is a business consultancy which provide
services to another companies for improving their overall performance level. Mainly, company
operate their business at small scale with the aim of achieving higher success at market place.
For attaining the same, company needs to upgrade their application and system to maximize the
capabilities. In addition of this, concept of cloud computing can increase their efficiency level
through which company can easily improve their performance level (Keller, Parameswaran and
Jacob, 2011). By using this, company can easily share large number of data by using internet
internet. It may contribute in keeping data secure.
Research aim:
The main aim of this research is “To evaluate the effectiveness of cloud technology in
upgrading business activities. A case study on Continental Consulting Ltd.”
Research objectives:
To determine the concept of cloud technology.
To evaluate the importance of cloud technology in Continental Consulting Ltd while
improving their business activities.
To define the challenges faced by Continental Consulting Ltd while implementing cloud
technology.
Research Questions:
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

What is concept of cloud technology?
What is importance of cloud technology in Continental Consulting Ltd. while improving
their business activities?
What are challenges that are faced by Continental Consulting Ltd while implementing
cloud technology?
P2 Project management plan that covers aspects of cost, scope, time, quality, communication,
risk, and resources.
Project management plan is necessary for doing things in better manner. Project
management plan refers to a formal document that is used while implementation of project. The
project management plan is helpful in execution, monitored and also controlled the project in
significant manner. There are different aspects related to project management plan mention
below:
Scope- It can be defined as a specific goal of the project in detailed manner for attaining
set objectives. Under this, scope of this project is wider and to collect accurate information, firm
uses different tools and sources such as primary and secondary (Doherty, Ashurst, and Peppard,
2012). Under this, manager arrange on the activities in systematic manner and so that they can
conduct their business activities at large scale.
Time- It is a necessary aspect in project plan. In this top management should arrange as
time on the basis of allotted activities. With the help of this research can easily perform activities
within the appropriate time frame. By using the digital technology in business, Continental
Consulting Ltd. can perform its activities in significant manner. It will helpful in develop
positive impact on project management plan. Along with this, researcher also set their activities
as per specific time frame with the aim of reducing the chances of arising any kind of issues
within the project.
Cost- It is an essential factor and without money, company can not perform any single
activity or task. It is estimation of money that will be needed to finish project. In order to make a
project, cost is related to resources, materials, labor charges etc. So, it is the responsibility of
manager of Continental Consulting Ltd to arrange the costs or money for completing project in
systematic manner. For doing things in proper manner, there is requirement of accurate cost
management.
What is importance of cloud technology in Continental Consulting Ltd. while improving
their business activities?
What are challenges that are faced by Continental Consulting Ltd while implementing
cloud technology?
P2 Project management plan that covers aspects of cost, scope, time, quality, communication,
risk, and resources.
Project management plan is necessary for doing things in better manner. Project
management plan refers to a formal document that is used while implementation of project. The
project management plan is helpful in execution, monitored and also controlled the project in
significant manner. There are different aspects related to project management plan mention
below:
Scope- It can be defined as a specific goal of the project in detailed manner for attaining
set objectives. Under this, scope of this project is wider and to collect accurate information, firm
uses different tools and sources such as primary and secondary (Doherty, Ashurst, and Peppard,
2012). Under this, manager arrange on the activities in systematic manner and so that they can
conduct their business activities at large scale.
Time- It is a necessary aspect in project plan. In this top management should arrange as
time on the basis of allotted activities. With the help of this research can easily perform activities
within the appropriate time frame. By using the digital technology in business, Continental
Consulting Ltd. can perform its activities in significant manner. It will helpful in develop
positive impact on project management plan. Along with this, researcher also set their activities
as per specific time frame with the aim of reducing the chances of arising any kind of issues
within the project.
Cost- It is an essential factor and without money, company can not perform any single
activity or task. It is estimation of money that will be needed to finish project. In order to make a
project, cost is related to resources, materials, labor charges etc. So, it is the responsibility of
manager of Continental Consulting Ltd to arrange the costs or money for completing project in
systematic manner. For doing things in proper manner, there is requirement of accurate cost
management.

Communication- It is an important aspect because under this communication is required
at every level or stage. If communication will not be better then all employees will not work on
project in a proper manner and conflict will also arise. It is a responsibility of manager of
Continental Consulting Ltd to make better coordination and communication among all
employees so that they can work on project management plan and perform all activities in
effective way. It will help to enhance their motivational level to work and focus completing
project within mention time period.
Risk – It is considered as a necessary step in the business management plan because risk
is uncertain in nature. Thus, project manager of Continental Consulting Ltd have to take several
steps so that they can overcome from the risk and obstacles in the future.
Resources – In this step it is important to allocate resources in proper manner as per the
requirement of each and every department. So that, they can do their work by maintaining
quality of products as well as services.
P3 Work breakdown structure and a Gantt chart
Work breakdown structure - It is the project management structure that assist in dividing
team work into different manageable sections. Main work of WBS (work breakdown structure) is
to divide work in small parts so that there will be no burden on individual for completing their
project. Most important is that through WBS things will be easily manageable and task get
completed on time in proper manner (Turner and Zolin, 2012). When Continental consultancy
limited will implement work break down structure in their working then they will be able to
manage work in better manner without any burden on individual person. Apart from this, with
the assistance of WBS project can be completed on specified time as well result in generating
more and more revenue.
Gantt Chart- It is type of bar chart which shows schedule related to the project as well as
on the vertical axis of the chart task to be performed are listed. Whereas, on the horizontal axis
time intervals are given. Moreover, width of horizontal bars in Gantt chart illustrate the duration
of each and every activity. Along with this, it help in completing work on time within specified
time period. Gantt chart is an project management tool which will assist Continental consultancy
limited in allocating job to employees with their starting and finishing time. With the assistance
of respective project management Tool Company can do their work in effective manner and
completed on specified time period.
at every level or stage. If communication will not be better then all employees will not work on
project in a proper manner and conflict will also arise. It is a responsibility of manager of
Continental Consulting Ltd to make better coordination and communication among all
employees so that they can work on project management plan and perform all activities in
effective way. It will help to enhance their motivational level to work and focus completing
project within mention time period.
Risk – It is considered as a necessary step in the business management plan because risk
is uncertain in nature. Thus, project manager of Continental Consulting Ltd have to take several
steps so that they can overcome from the risk and obstacles in the future.
Resources – In this step it is important to allocate resources in proper manner as per the
requirement of each and every department. So that, they can do their work by maintaining
quality of products as well as services.
P3 Work breakdown structure and a Gantt chart
Work breakdown structure - It is the project management structure that assist in dividing
team work into different manageable sections. Main work of WBS (work breakdown structure) is
to divide work in small parts so that there will be no burden on individual for completing their
project. Most important is that through WBS things will be easily manageable and task get
completed on time in proper manner (Turner and Zolin, 2012). When Continental consultancy
limited will implement work break down structure in their working then they will be able to
manage work in better manner without any burden on individual person. Apart from this, with
the assistance of WBS project can be completed on specified time as well result in generating
more and more revenue.
Gantt Chart- It is type of bar chart which shows schedule related to the project as well as
on the vertical axis of the chart task to be performed are listed. Whereas, on the horizontal axis
time intervals are given. Moreover, width of horizontal bars in Gantt chart illustrate the duration
of each and every activity. Along with this, it help in completing work on time within specified
time period. Gantt chart is an project management tool which will assist Continental consultancy
limited in allocating job to employees with their starting and finishing time. With the assistance
of respective project management Tool Company can do their work in effective manner and
completed on specified time period.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser


TASK 2
P4 Qualitative and quantitative research methods appropriate for meeting project aims and
objectives.
Research is divided into different types for the sake of its better understanding of the
overall concept (Lin and Chen, 2012). Various bases can be adopted for dividing it. These are
nature of data, branch of knowledge, place of investigation, extent of coverage, time frame and
several others. Below mention are basic types of research which is involved in this project.
Descriptions are as follows:-
Quantitative Research – It is a research which is based on numeric figures and several
other numbers. Main aim of quantitative research is to measure the amount or quantity and then
compare it with the past result for trying to project future periods (Basu and Wright, 2012). The
researcher analyse data and information with the help of statistics and hope that number will be
yield an unbiased result that can be generalized to some large population. Apart from this,
quantitative methods can be used for verifying which hypotheses are true.
P4 Qualitative and quantitative research methods appropriate for meeting project aims and
objectives.
Research is divided into different types for the sake of its better understanding of the
overall concept (Lin and Chen, 2012). Various bases can be adopted for dividing it. These are
nature of data, branch of knowledge, place of investigation, extent of coverage, time frame and
several others. Below mention are basic types of research which is involved in this project.
Descriptions are as follows:-
Quantitative Research – It is a research which is based on numeric figures and several
other numbers. Main aim of quantitative research is to measure the amount or quantity and then
compare it with the past result for trying to project future periods (Basu and Wright, 2012). The
researcher analyse data and information with the help of statistics and hope that number will be
yield an unbiased result that can be generalized to some large population. Apart from this,
quantitative methods can be used for verifying which hypotheses are true.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Qualitative Research – This is a form of research which is conducted for gathering non-
numerical data. Qualitative research mainly refers to the concepts definitions, meaning,
metaphors, symbols, descriptions and so on. In this research, qualitative method is using by the
researcher for conducting overall process. Apart from this, below mention are two data collecting
method these are as follows :-
Primary method – This is the method through which researcher gather first hand data
which was never utilised nor published in books, journal and so on (Dutta and Bose,
2015). For Continental consultancy limited, primary method of data collecting is best
because through this they can directly contact with peoples and know about their views.
There are various type of primary methods but in this research Questionnaire is used for
overall project. Through primary method will research get new data or information in
their hand. There are several source of collecting respective data such as survey,
questionnaire, observation, experiments and many more.
Secondary Method – It is mainly second hand or already published data and can be
historical information of the company. In this type of research, there is required of
gathering and collecting fresh data and information from the respondents. Thus,
secondary method is not needed. There are various sources of collecting secondary data
such as books, magazines, news paper, trade journals and so on.
Sampling – It is the process through which researcher choose or select representative subset
or part of the total population. That could be studied for the topic of research and in the end will
be able to draw conclusion of the research (Muller, 2017). Moreover, there are 30 no. of
respondent’s chosen for collecting or gathering information.
Questionnaire
Name :
Age :
Q1: Does cloud technology help Continental Consulting limited in upgrading their
operation capacity?
Yes
No
Can’t say
Q2: Does adoption of cloud technology aid Continental consulting limited to attain
numerical data. Qualitative research mainly refers to the concepts definitions, meaning,
metaphors, symbols, descriptions and so on. In this research, qualitative method is using by the
researcher for conducting overall process. Apart from this, below mention are two data collecting
method these are as follows :-
Primary method – This is the method through which researcher gather first hand data
which was never utilised nor published in books, journal and so on (Dutta and Bose,
2015). For Continental consultancy limited, primary method of data collecting is best
because through this they can directly contact with peoples and know about their views.
There are various type of primary methods but in this research Questionnaire is used for
overall project. Through primary method will research get new data or information in
their hand. There are several source of collecting respective data such as survey,
questionnaire, observation, experiments and many more.
Secondary Method – It is mainly second hand or already published data and can be
historical information of the company. In this type of research, there is required of
gathering and collecting fresh data and information from the respondents. Thus,
secondary method is not needed. There are various sources of collecting secondary data
such as books, magazines, news paper, trade journals and so on.
Sampling – It is the process through which researcher choose or select representative subset
or part of the total population. That could be studied for the topic of research and in the end will
be able to draw conclusion of the research (Muller, 2017). Moreover, there are 30 no. of
respondent’s chosen for collecting or gathering information.
Questionnaire
Name :
Age :
Q1: Does cloud technology help Continental Consulting limited in upgrading their
operation capacity?
Yes
No
Can’t say
Q2: Does adoption of cloud technology aid Continental consulting limited to attain
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

competitive advantage in market?
Yes
No
Q3: Does Continental Consulting limited have sufficient amount of resources to implement
this technology successfully?
Yes
No
Q4: What are the main resources required for implementing cloud technology within the
Continental consulting Limited?
Financial
Technological
Human Resource
Q5: Does adoption of technology aids Continental consulting Limited in expanding their
business?
Agree
Disagree
Can’t Say
Q6: What will be the main advantage for organisation after implementation of Cloud
technology?
More Storage
Easy sharing of information
Attracting number of clients
Q7: Does implementation of this technology aid in improvement of profitability of
organisation?
Yes
No
Q8: What are the major challenges faced by the organisation while implementing cloud
technology?
Employees resistance
Lack of fund
Lack of technological knowledge
Yes
No
Q3: Does Continental Consulting limited have sufficient amount of resources to implement
this technology successfully?
Yes
No
Q4: What are the main resources required for implementing cloud technology within the
Continental consulting Limited?
Financial
Technological
Human Resource
Q5: Does adoption of technology aids Continental consulting Limited in expanding their
business?
Agree
Disagree
Can’t Say
Q6: What will be the main advantage for organisation after implementation of Cloud
technology?
More Storage
Easy sharing of information
Attracting number of clients
Q7: Does implementation of this technology aid in improvement of profitability of
organisation?
Yes
No
Q8: What are the major challenges faced by the organisation while implementing cloud
technology?
Employees resistance
Lack of fund
Lack of technological knowledge

Q9: Does more number of clients contracted with Continental consulting limited after
implementing cloud technology?
Yes
No
Q10: Is there any suggestion for Continental Consultancy limited related to cloud
technology?
TASK 3
P5 Analyse research and data using appropriate tools and techniques
Theme 1: Cloud technology help Continental Consulting limited to upgrading their operation
capacity
Yes 15
No 10
Can’t Say 5
Interpretation: As per the above mention graphical representation it has been analysed that, out
of 30 respondents 15 people are saying that yes cloud technology is assisting Continental
Consultancy limited in upgrading their operation capacity. Whereas, out of remaining 15, 10 are
in the favour of n that it is not upgrading their operation capacity as well as 5 don’t have any
knowledge about it. Hence, Cloud computing technology helping respective organisation in
upgrading their operation capacity.
implementing cloud technology?
Yes
No
Q10: Is there any suggestion for Continental Consultancy limited related to cloud
technology?
TASK 3
P5 Analyse research and data using appropriate tools and techniques
Theme 1: Cloud technology help Continental Consulting limited to upgrading their operation
capacity
Yes 15
No 10
Can’t Say 5
Interpretation: As per the above mention graphical representation it has been analysed that, out
of 30 respondents 15 people are saying that yes cloud technology is assisting Continental
Consultancy limited in upgrading their operation capacity. Whereas, out of remaining 15, 10 are
in the favour of n that it is not upgrading their operation capacity as well as 5 don’t have any
knowledge about it. Hence, Cloud computing technology helping respective organisation in
upgrading their operation capacity.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 20
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.