PROJ6004: Contracts and Procurement - Case Study Analysis Report

Verified

Added on  2021/04/17

|15
|3458
|130
Report
AI Summary
This report provides an in-depth analysis of the contracts and procurement processes employed in the new Royal Adelaide Hospital project, a complex infrastructure project undertaken through a Public-Private Partnership (PPP) arrangement. The report examines the project's procurement lifecycle, including understanding project needs, developing strategies, creating pre-procurement plans, documenting procurement plans, and evaluating risks. It highlights the challenges and risks associated with the project, such as ICT system integration, the use of new technologies, and financial management. The report further discusses the mitigation strategies employed, including independent consultant reviews and the importance of project governance. Key findings include the significance of project governance, contract management, and the roles of project and procurement managers in ensuring successful project delivery. The report emphasizes best practices for contract and procurement management, such as project control, interaction, risk adaptation, and proper planning. The analysis underscores the importance of these elements for achieving project success, stakeholder satisfaction, and effective risk mitigation.
Document Page
Running head: INTRODUCTION TO CONTRACTS AND PROCUREMENT
Introduction to Contracts and Procurement
Name of the Student
Name of the University
Author Note
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1
INTRODUCTION TO CONTRACTS AND PROCUREMENT
Table of Contents
1. Part A: Introduction.........................................................................................................2
2. Part B: Risks and Risk Mitigation...................................................................................4
3. Part C: Summary of key Findings...................................................................................7
4. Part D: Reflection............................................................................................................9
References..........................................................................................................................12
Document Page
2
INTRODUCTION TO CONTRACTS AND PROCUREMENT
1. Part A: Introduction
The project of new Royal Adelaide hospital is among the state’s most complex and large
infrastructure project and it is to be developed, maintained and financed for providing different
services including non-medical services and equipments using a PPP (Public Private Partnership)
arrangement. The delivery status of the project includes continuation of the design and the
construction work by the subcontracted builders (Mignone et al., 2016). At the time of reporting
the project, majority of the construction works were already completed.
The procurement Process Initiation- Public tender with a project budget of
$1,849,800,000
Execution Date for the procurement Plan- 20 May, 2011
Starting Date of the project- 6 Jun, 2011
Procurement life cycle is a cyclic process of key stages of procuring a product, good or a
service (Larson & Gray, 2013). The procurement life cycle for the Royal Adelaide hospital
project includes a number of stages which are mentioned as follows-
1. Understanding the need of the project- The main requirements or aim of the project is
to provide 800 beds, out of which 700 beds should be multi day beds. Apart from this, there is
need for 40 technical suites and different biomedical equipments as well.
2. Development of proper project strategy- Determining the auditing approach and scope
of a project. The project associated with the new Royal Adelaide hospital is a generational
project associated analyzing its size, cost, complexity and the materials associated with the
project. A robust governance plan is established for effective management of the different project
process, that is crucial for the successful delivery of a project.
Document Page
3
INTRODUCTION TO CONTRACTS AND PROCUREMENT
3. Development of the pre procurement plan-The project is huge and complex and
therefore, it was essential to develop a proper procurement plan for the same. This stage is
associated with the business planning, risk management along with the financial management of
the project (Walker, 2015).
4. Documentation of the procurement plan- Analyzing the complexity of the project, it is
essential to document the procurement activities and the procurement plan set for the project.
The SA Health had furthermore appointed an independent consultant for undertaking certain
assurance reviews that are associated with the RAH project (Mwikali & Kavale, 2012).
5. State Procurement governance and reporting arrangement- SA Health developed an
acquisition plan is a strategic manner for the state funded furniture and the equipments required
for the new RAH. The procurement plan that was prepared in the initial stages was forwarded to
the State Procurement Board for their approval. The approval of the procurement plan further
included certain other details, which are as follows-
The acquisition plan that was passed in the last quarter of the project
The purchase requirement recommendations that were passed in the last quarter
Procurement bundles that were started in the last quarter
Status of the current tender
An update on the procurement budget
6. Evaluation of the Risk exposure- the major risk that was associated with the project
was that the project may not be undertaken according to the strategic acquisition plan approved
by SPB (Hong & Kwon, 2012).
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4
INTRODUCTION TO CONTRACTS AND PROCUREMENT
7. Evaluating the contract performance- It is a necessary to evaluate the contract
performance and timely review of the same.
The key issues of the project are as follows (Banaitiene & Banaitis, 2012)-
1. The project was complex and might have material consequences.
2. The project failed to stick to the timeline set.
The different key issues associated with the project have considerably affected its
contractual arrangements (Schwalbe, 2015). However, the PPP arrangements create strict and
proper contractual obligation consisting of financial fines for not finishing the project in a
particular time frame. This is a part of project governance plan as well for ensuing proper
implementation of the project according to the plan.
2. Part B: Risks and Risk Mitigation
The New Royal Adelaide Hospital project at the current moment is going comparatively
critical stage in its implementation life cycle. This is because the transition of the project from
the design and constructional phase to the operational commissioning to the new hospital from
the existing hospital is quite complex (Amann et al., 2014). There are a number of issues,
challenges, problems and risks associated with the project of New Royal Adelaide Hospital.
These are as follows-
1. One of the major challenges associated with the project is the delivery and integration
of the ICT systems of the new health enterprise as majority of them are yet to be fully developed,
while others are not tested or implemented.
Document Page
5
INTRODUCTION TO CONTRACTS AND PROCUREMENT
2. Another major risk associated with the project is the use and integration of the
innovation and new technologies in the process of project implementation. This can be either
beneficial to the project or can lay a negative impact in the project as the processes are
completely new.
3. The project is particularly huge and therefore, the continuing the operation across the
development stage of the project along with the movement to the new hospital facilities is risky.
4. Delivery of a complex project in parallel to the substantial health reform initiatives is
itself a huge challenge as intensive planning and development of proper strategies are required
for successful implementation of the same.
5. Since the project is huge, ensuring that all the resources and staffs are ready and
appropriately trained is a major challenge. Untrained workers might lay a negative impact on the
project and therefore, it is one of the major risks associated with the project. Furthermore, it is
important for the staffs to embrace the different changes and reform initiative for successful
project implementation (Kerzner & Kerzner, 2017).
6. The project budget should be fixed and in majority of the times, it becomes impossible
to frequently revise the budget associated with a project. Therefore, financial management of the
finite resources for successful project delivery is a source of risk a project might face while its
implementation.
7. Improper integration along with inaccurate coordination of the certain services
provided by the Project CO under the PPP arrangements is another significant risk that might be
encountered in the project life cycle associated with the New Royal Adelaide Hospital project.
Document Page
6
INTRODUCTION TO CONTRACTS AND PROCUREMENT
The mitigation process followed to keep in check the risks associated with the project is
as follows-
1. SA has engaged and independent consultant for undertaking the different number the
different governance reviews along with the functional review of the New RAH program
(Banaitiene & Banaitis, 2012).
2. It is recommended for the SA Health to address the different matters as raised by the
consultant and the project governance team for understanding and mitigating the different risks
associated with the project.
The possible learning associated with the risks and challenges the project might face
includes the need and importance of the project governance and proper procurement
management.
Issues with the procurement management might require the changes in objectives of the
key project resources. The dependencies of the learning outcomes associated with the project
include project governance. Successful implementation of a project largely depends on proper
project monitoring and governance (Mossalam & Arafa, 2016). It is also found out that the
completion of the model of care from new RAH is largely based on the enterprise wide ICT
systems, which needs proper governance as well. The changing environment of the project might
have a direct impact on the project progress and in turn the schedule.
The risk management or mitigation process itself is a method of achieving extensive
learning based with the implementation of the project (Serpella et al., 2014). This is because
evaluating the project risks helps the project team in understanding in details the various issues
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7
INTRODUCTION TO CONTRACTS AND PROCUREMENT
that a project might face and further helps the team members in staying prepared about those
risks.
Identification of dependencies associated with a project is essential as well because it
helps in understanding the process and methods of tracking the project progress.
3. Part C: Summary of key Findings
The main aim of this project is the building of new Royal Adelaide Hospital and the
project deals with maintenance and financing of the non- medical services and equipments using
a PPP (Public Private Partnership) arrangement. The agreement of this project is covering almost
35 years and is being carried out between the PPP proponent, which is SA health Partnership Pty
Ltd and the state (Stentoft Arlbjørn & Vagn Freytag, 2012). The project has ensured the use of
modern technology so that the project supplies are transported efficiently through the project site
that is the hospital by making use of the automated guiding vehicles. The agreement of the
project covers the set contractual obligations of both the parties ( state and project Co.).
It has been found out the project associated with the new Royal Adelaide Hospital has
laid increasing importance on the project governance and organization structure of the project
(Tadelis, 2012). The project has comparatively worked in the business planning and the
assurance process. The identification and risk management process have considerably helped in
tracking the project progress. Since the project size is huge and it is comparatively complex
proper budgetary and financial management is necessary. The need for proper contract and
procurement management are as follows (Olusola Babatunde, Opawole & Emmanuel Akinsiku,
2012)-
Document Page
8
INTRODUCTION TO CONTRACTS AND PROCUREMENT
1. Proper contract and procurement management includes improving the project delivery
by implementing the different project works according to the project plan.
2. Along with the improvement of the project delivery, it also involves implementation of
a project in a set schedule.
3. Contract and procurement management matters because even a small issue with a
project is capable of tarnishing the image of the organization.
The best practices for the contracts and procurement management (PPP procurement) are
as follows (McCue & Roman, 2012)-
1. It helps in ensuring the project control- Project control is a major need of successful
project management as it helps in setting up proper project review and monitoring of KPIs. It
further ensures a watch over the finances such as budget, billing, total contract cost and
payments. One of the major considerations of project control is record keeping as well along
with the audit compliance.
2. Another practice of contract and procurement management is interaction. Proper
contract and procurement management helps in building a strong relationship among the team
members at all levels and also helps in handling the disputes and disagreements (Johnson,
Leenders & McCue, 2017).
3. Proper contract and procurement management helps in adapting to the different issues
and risks associated with a project, similar to this project under consideration. Furthermore, it
helps in managing the different variations associated with the project including the written,
verbal and behavior based variation.
Document Page
9
INTRODUCTION TO CONTRACTS AND PROCUREMENT
4. Another best practice of project and procurement management is that it helps in proper
planning of the project by forecasting the demand and supply associated with a particular project,
which is in this case is the use of innovative approach for project execution. It further helps in
driving the continuous improvement among the project team members (Olatunji, 2014).
The roles of project and procurement managers in ensuring successful delivery of a
project are as follows (Spagnolo, 2012)-
1. The project and the procurement managers are responsible for resource planning,
which plays a major role in successful project implementation.
2. The project manager plays a significant role in organizing, training and motivating the
project team.
3. The project and procurement manager is further responsible for the time management
by dividing the entire project in a number of time frames (Krane, Olsson & Rolstadås, 2012).
4. One major role of the project and procurement manager is estimation of the cost and
development of an appropriate budget for a project.
5. Procurement manager ensures that the project is implemented according to the project
requirements. Project manager further works with the identification and management of the risks
associated with a project.
4. Part D: Reflection
Particularly in a complex project it is very essential to manage the associated
procurement and the financial risk. The major risk associated with the procurement of the
complex projects includes limited visibility of the contract terms, insufficient velocity, uncertain
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10
INTRODUCTION TO CONTRACTS AND PROCUREMENT
compliance, lack of standardization and the increasing complexity of the project. Furthermore,
there might be certain financial risks associated with the project, which includes budget revision,
price hike and so on. The specific financial risk with the project of new Royal Adelaide
Hospital is that the budget and the finance report provided by the committee had no comparison
of the project to date the actual expenditure of the project against the budget set for the project.
This is a major risk for the project as the project manager might not have the idea of the actual
expenditure of the project in accordance to the percentage of project completion.
I have understood that the process of risk identification and risk management plays a
major role in ensuring the project progress and its successful implementation. The different risk
mitigation techniques include risk avoidance, risk acceptance and risk transfer. Vendor
negotiation and management can further be achieved with the involvement of lawyer in the
process that will in turn help in successful contract completion.
It is project manager’s responsibility to keep the team members motivated to facilitate the
successful completion of the project. Working with the team in a suitable team environment
accelerates the project progress and ensures successful project delivery. The project manager is
further responsible for evaluation of the project scope and setting up a realistic schedule for a
project. Therefore, it can be said that project and procurement manager plays a significant role in
successful completion of the project. The new RAH project contract covers all the project
requirement and outlines the different techniques that will be used to implement the project.
The different issues associated with a particular project that can be considered by the
group or team for a group report includes the different challenges and risk a project might face
due to improper contract and procurement management. While identifying the risks associated
Document Page
11
INTRODUCTION TO CONTRACTS AND PROCUREMENT
with the particular project, I have understood that need of considering every minute details of a
project as proper evaluation of the project requirements are necessary for successfully
implementing it. The complexity of the project in consideration is huge and therefore proper
planning of the project played a major role in its successful implementation. By the time, the
report is prepared, majority of the construction works were already completed. The importance
of project manager is considerably great in a project as a project manager is intended for
managing the team and the project. The project of new Royal Adelaide Hospital is an excellent
example of the importance of project and procurement management in successful project
implementation.