CPCCBC5010B - Construction Work Assessment - Strathfield Project
VerifiedAdded on  2022/10/02
|16
|2575
|146
Homework Assignment
AI Summary
This document presents a comprehensive solution to a CPCCBC5010B construction management assignment, focusing on a proposed commercial and residential development at 2135 The Boulevarde, Strathfield. The assignment addresses several key areas of construction management, including establishing site communication processes through a formal letter outlining site meeting schedules and attendees. It details first aid requirements, method statements for safe work practices, and a material and equipment order chart. Additionally, the assignment includes a variation claim form and projected project payment schedules, alongside progress claim certificates. The content encompasses aspects of risk management, safety protocols, and financial tracking, providing a holistic overview of construction project management.

CPCCBC5010B
Student Name:
Student Number:
CPCCBC5010B
Managing Construction Work
Assessment no. 6
Student Name:
Student Number:
CPCCBC5010B
Managing Construction Work
Assessment no. 6
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

CPCCBC5010B
QUESTION 1
Student Name
XXX Construction Company,
Tel: 01234567
Fax: 02123456
Address: 444 Near way, Sydney 4000
Greetings!
My name is (Student Name) working with XXX construction Company. XXX
company is involved in the contract with tender number 2135, The Boulevard, Strathfield.
The commencement date is set to be 13th, Jan 2014. Attached please, find the schedule of site
meetings as agreed and the respective dates and information regarding the same. Please note
that these site meetings are obligatory and it is a requirement by all parties to be in
attendance.
I take this chance to thank you all for your co-operation and hoping that we are going
to work together in future. An issue regarding clarification on this letter can be settled using
the above address and contacts.
Many Regards.
Date of site meeting Description of the meeting Parties attending the
site meeting
13th, Jan 2014 Introduction of parties involved in the project
(introductory site meeting). Introduction to the
site, induction of the WHS concerning the site
amenities, the first aid chambers, safety
requirements and all expectations as per the
project need.
All parties who shall
be working on site
are expected to
attend this site
meeting
14th, March 2014 The 1st site progress meeting. During this
meeting, the contractor and subcontractors
Technical staff,
departmental
QUESTION 1
Student Name
XXX Construction Company,
Tel: 01234567
Fax: 02123456
Address: 444 Near way, Sydney 4000
Greetings!
My name is (Student Name) working with XXX construction Company. XXX
company is involved in the contract with tender number 2135, The Boulevard, Strathfield.
The commencement date is set to be 13th, Jan 2014. Attached please, find the schedule of site
meetings as agreed and the respective dates and information regarding the same. Please note
that these site meetings are obligatory and it is a requirement by all parties to be in
attendance.
I take this chance to thank you all for your co-operation and hoping that we are going
to work together in future. An issue regarding clarification on this letter can be settled using
the above address and contacts.
Many Regards.
Date of site meeting Description of the meeting Parties attending the
site meeting
13th, Jan 2014 Introduction of parties involved in the project
(introductory site meeting). Introduction to the
site, induction of the WHS concerning the site
amenities, the first aid chambers, safety
requirements and all expectations as per the
project need.
All parties who shall
be working on site
are expected to
attend this site
meeting
14th, March 2014 The 1st site progress meeting. During this
meeting, the contractor and subcontractors
Technical staff,
departmental

CPCCBC5010B
Date of site meeting Description of the meeting Parties attending the
site meeting
shall be expected to hand in all the progress
reports. They shall also be required to submit
their planned works for the subsequent period.
In addition to this, other important reports such
as labour reports, cost reports and the trades
reports shall be handed over to engineer. The
contractor and the subcontractor shall be
expected to hand in the progress photos and if
he has any issue regarding the WHS, design
matters or other issues such as delay in
delivery of plants and material shall be dealt
with during this meeting.
supervisors, safety
officers, the client
and all the
subcontractors
involved in the
project.
14th, July 2014 The 2nd Site progress meeting. During this
meeting, the contractor and subcontractors
shall be expected to hand in all the progress
reports. They shall also be required to submit
their planned works for the subsequent period.
In addition to this, other important reports such
as labour reports, cost reports and the trades
reports shall be handed over to engineer. The
contractor and the subcontractor shall be
expected to hand in the progress photos and if
he has any issue regarding the WHS, design
matters or other issues such as delay in
delivery of plants and material shall be dealt
with during this meeting.
Technical staff,
departmental
supervisors, safety
officers, the client
and all the
subcontractors
involved in the
project.
14th, Aug 2014 The 3rd Site Progress meeting. During this
meeting, the contractor and subcontractors
shall be expected to hand in all the progress
reports. They shall also be required to submit
their planned works for the subsequent period.
In addition to this, other important reports such
as labour reports, cost reports and the trades
reports shall be handed over to engineer. The
contractor and the subcontractor shall be
expected to hand in the progress photos and if
he has any issue regarding the WHS, design
matters or other issues such as delay in
delivery of plants and material shall be dealt
with during this meeting.
Technical staff,
departmental
supervisors, safety
officers, the client
and all the
subcontractors
involved in the
project.
14th, Sep 2014 Safety checks on the worksite, project progress
reports, labour and trade reports, discussion of
major issues on design, changes or setbacks.
Technical staff,
departmental
supervisors, safety
officers, the client
and all the
subcontractors
involved in the
project.
Date of site meeting Description of the meeting Parties attending the
site meeting
shall be expected to hand in all the progress
reports. They shall also be required to submit
their planned works for the subsequent period.
In addition to this, other important reports such
as labour reports, cost reports and the trades
reports shall be handed over to engineer. The
contractor and the subcontractor shall be
expected to hand in the progress photos and if
he has any issue regarding the WHS, design
matters or other issues such as delay in
delivery of plants and material shall be dealt
with during this meeting.
supervisors, safety
officers, the client
and all the
subcontractors
involved in the
project.
14th, July 2014 The 2nd Site progress meeting. During this
meeting, the contractor and subcontractors
shall be expected to hand in all the progress
reports. They shall also be required to submit
their planned works for the subsequent period.
In addition to this, other important reports such
as labour reports, cost reports and the trades
reports shall be handed over to engineer. The
contractor and the subcontractor shall be
expected to hand in the progress photos and if
he has any issue regarding the WHS, design
matters or other issues such as delay in
delivery of plants and material shall be dealt
with during this meeting.
Technical staff,
departmental
supervisors, safety
officers, the client
and all the
subcontractors
involved in the
project.
14th, Aug 2014 The 3rd Site Progress meeting. During this
meeting, the contractor and subcontractors
shall be expected to hand in all the progress
reports. They shall also be required to submit
their planned works for the subsequent period.
In addition to this, other important reports such
as labour reports, cost reports and the trades
reports shall be handed over to engineer. The
contractor and the subcontractor shall be
expected to hand in the progress photos and if
he has any issue regarding the WHS, design
matters or other issues such as delay in
delivery of plants and material shall be dealt
with during this meeting.
Technical staff,
departmental
supervisors, safety
officers, the client
and all the
subcontractors
involved in the
project.
14th, Sep 2014 Safety checks on the worksite, project progress
reports, labour and trade reports, discussion of
major issues on design, changes or setbacks.
Technical staff,
departmental
supervisors, safety
officers, the client
and all the
subcontractors
involved in the
project.
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

CPCCBC5010B
QUESTION 2
a. First Aid Requirement on the site:
Some of the activities considered to be high risk in Safe Work Australia in any
construction project include manual tasks, electricity, working at heights and working with
heavy plants and equipment (Rothmore, Aylward, & Karnon, 2015). On this site, there are
multiple stories and therefore each floor shall need first aid kit.
The kit shall need to contain items for the following first aid operation:
a) Scratches, cuts, grazes, punctures and splinters
b) Strains and muscular sprains
c) Burns
d) Bleeding and wounds, amputation
e) Broken bones
f) Injury on eyes and
g) Shock
Personnel
On this site, a minimum of 1 trained personnel shall be required to for first aid ticket
for every 25 employees. Evacuation and emergency plans shall be elaborated on site.
b. High risk machinery and plant to be deployed on site (Prochorov, 2018).
i. Crane to lift material
ii. Tipper trucks for transportation
iii. Hoist
iv. Bobcat
v. Excavator for excavation
vi. Concrete saw
QUESTION 2
a. First Aid Requirement on the site:
Some of the activities considered to be high risk in Safe Work Australia in any
construction project include manual tasks, electricity, working at heights and working with
heavy plants and equipment (Rothmore, Aylward, & Karnon, 2015). On this site, there are
multiple stories and therefore each floor shall need first aid kit.
The kit shall need to contain items for the following first aid operation:
a) Scratches, cuts, grazes, punctures and splinters
b) Strains and muscular sprains
c) Burns
d) Bleeding and wounds, amputation
e) Broken bones
f) Injury on eyes and
g) Shock
Personnel
On this site, a minimum of 1 trained personnel shall be required to for first aid ticket
for every 25 employees. Evacuation and emergency plans shall be elaborated on site.
b. High risk machinery and plant to be deployed on site (Prochorov, 2018).
i. Crane to lift material
ii. Tipper trucks for transportation
iii. Hoist
iv. Bobcat
v. Excavator for excavation
vi. Concrete saw
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

CPCCBC5010B
vii. Forklift
c. Method statement for Safe Work
Employer XXX Construction Company
Supervisor Student Name
Location of Works 2135 The Boulevarde Strathfield NSW
Main Task Material moving to 3rd Floor using a
crane
Risks Risk of falling from heights, accidents
involved by moving plants, weights
suspended falling on workers (Gurian,
2012).
Control measures to reduce risk
possibilities
Supervision at work and following the
safety precautions that are put in place.
Description of task, risk and control measures
Major Task
The main task involved is the lifting of heavy weight materials from the ground
floor to the third floor. The weights are lifted with the help of a mobile crane.
Hazards and Risks
Since the weights are being lifted from the ground floor to the 3rd floor, there is a
possibility of blind spots and the operator of the crane may not be in a good
position to view well (American Industrial Hygiene Association, 2005). The
weights are mostly suspended in the air and for this reason there is a possibility of
falling hence injuring people and property near the construction site. This might
cause death or injury to people working in these areas and damage in properties.
Control Measures
There is a need to employ a dogman who shall be situated at the 3rd floor to help
the crane operator in viewing the area (Seraji, 2006). Employees working below
the crane need to put on helmet and wear the correct personal protection
vii. Forklift
c. Method statement for Safe Work
Employer XXX Construction Company
Supervisor Student Name
Location of Works 2135 The Boulevarde Strathfield NSW
Main Task Material moving to 3rd Floor using a
crane
Risks Risk of falling from heights, accidents
involved by moving plants, weights
suspended falling on workers (Gurian,
2012).
Control measures to reduce risk
possibilities
Supervision at work and following the
safety precautions that are put in place.
Description of task, risk and control measures
Major Task
The main task involved is the lifting of heavy weight materials from the ground
floor to the third floor. The weights are lifted with the help of a mobile crane.
Hazards and Risks
Since the weights are being lifted from the ground floor to the 3rd floor, there is a
possibility of blind spots and the operator of the crane may not be in a good
position to view well (American Industrial Hygiene Association, 2005). The
weights are mostly suspended in the air and for this reason there is a possibility of
falling hence injuring people and property near the construction site. This might
cause death or injury to people working in these areas and damage in properties.
Control Measures
There is a need to employ a dogman who shall be situated at the 3rd floor to help
the crane operator in viewing the area (Seraji, 2006). Employees working below
the crane need to put on helmet and wear the correct personal protection

CPCCBC5010B
equipment (PPE). At all time, the construction site needs to be cleared from
people and no work shall be carried out on the ground beneath the working area.
d. Employees working on this site must be trained on safety regulations on
construction site. Evacuation plans and emergency response must be discussed in
advance and made accessible to all employees. Accessibility may be achieved by
pinning the procedures on the posters where everyone can view them. Everyone
working on this site shall ensure that correct PPE is worn before entering the
construction site. Method statement for each activity to be conducted must be
handed in to the safety officers and individuals carrying out the activity. Fire
safety equipment must be in a good working condition. All amenities on site must
be clearly shown for recognisability (Allison, Hon, & Xia, 2019).
QUESTION 3.
a. Materials for construction
ï‚· Blocks
ï‚· Bricks
ï‚· Timber frame
ï‚· Windows
ï‚· Floor tiles
ï‚· Roof tiles
ï‚· Power points
ï‚· Light fittings
ï‚· Concrete
ï‚· Gutters and,
ï‚· Plasterboard
b. Material and equipment order chart
equipment (PPE). At all time, the construction site needs to be cleared from
people and no work shall be carried out on the ground beneath the working area.
d. Employees working on this site must be trained on safety regulations on
construction site. Evacuation plans and emergency response must be discussed in
advance and made accessible to all employees. Accessibility may be achieved by
pinning the procedures on the posters where everyone can view them. Everyone
working on this site shall ensure that correct PPE is worn before entering the
construction site. Method statement for each activity to be conducted must be
handed in to the safety officers and individuals carrying out the activity. Fire
safety equipment must be in a good working condition. All amenities on site must
be clearly shown for recognisability (Allison, Hon, & Xia, 2019).
QUESTION 3.
a. Materials for construction
ï‚· Blocks
ï‚· Bricks
ï‚· Timber frame
ï‚· Windows
ï‚· Floor tiles
ï‚· Roof tiles
ï‚· Power points
ï‚· Light fittings
ï‚· Concrete
ï‚· Gutters and,
ï‚· Plasterboard
b. Material and equipment order chart
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

Proposed Residential
construction Excavation
Foundation construction
Walling
Roofing
External and internal
finishes
Concreting work
Hydraulics
Electrical installation
Mechanical work
External works
CPCCBC5010B
Month 1 2 3 4 5 6 7 8 9 10 11 12
Blocks
Bricks
Timber frame
Windows
Floor tiles
Roof tiles
Power points
Light fittings
Concrete
Gutters
Plasterboard
Crane
Tipper trucks
Hoist
Bobcat
Excavator
Concrete saw
Forklift
construction Excavation
Foundation construction
Walling
Roofing
External and internal
finishes
Concreting work
Hydraulics
Electrical installation
Mechanical work
External works
CPCCBC5010B
Month 1 2 3 4 5 6 7 8 9 10 11 12
Blocks
Bricks
Timber frame
Windows
Floor tiles
Roof tiles
Power points
Light fittings
Concrete
Gutters
Plasterboard
Crane
Tipper trucks
Hoist
Bobcat
Excavator
Concrete saw
Forklift
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

CPCCBC5010B
QUESTION 4
XXX Construction Company,
Tel: 01234567
Fax: 02123456
VARIATION CLAIM FORM
Variation claim number: BBBY1
Date: 23rd Nov. 2014
Variation Details
Variation Details Units Quantity of
variation
Unit Price of
Variation
Amount
in $
Change of windows
from sliding type to
double glazing
M2 106 110 11,660
Change of doors
from sliding type to
double glazing
M2 242 200 48,400
Total price of variation: $ 60,060
Original price of the items: $ 47,500
Extra cost of the material: $ 12,500
Percentage increment: 26.3%
Lead time for materials: 1 month
Subcontractor: YYY Suppliers
Extra time required: 1 month
Reason for variation
Client request
QUESTION 4
XXX Construction Company,
Tel: 01234567
Fax: 02123456
VARIATION CLAIM FORM
Variation claim number: BBBY1
Date: 23rd Nov. 2014
Variation Details
Variation Details Units Quantity of
variation
Unit Price of
Variation
Amount
in $
Change of windows
from sliding type to
double glazing
M2 106 110 11,660
Change of doors
from sliding type to
double glazing
M2 242 200 48,400
Total price of variation: $ 60,060
Original price of the items: $ 47,500
Extra cost of the material: $ 12,500
Percentage increment: 26.3%
Lead time for materials: 1 month
Subcontractor: YYY Suppliers
Extra time required: 1 month
Reason for variation
Client request

CPCCBC5010B
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

CPCCBC5010B
QUESTION 5.
a. Projected project payment
ITEM JAN FEB MAR APR MAY JUNE JULY AUG SEP OCT NOV DEC Total
Preliminaries
$935,750.0
0 $935,750.00
Ground
works
$56,250.0
0
$56,250.0
0 $112,500.00
Concrete
$
251,350.00
$251,350.0
0 $251,350.00
$251,350.0
0
$1,005,400.0
0
Masonry
$
104,625.00
$104,625.0
0 $104,625.00
$104,625.0
0 $418,500.00
Metal works
$120,350.0
0
$120,350.0
0 $240,700.00
Hydraulics $74,250.00 $74,250.00 $148,500.00
Electricals
$
46,300.00 $46,300.00 $92,600.00
Mechanical
$
88,250.00 $88,250.00 $176,500.00
Waterproofin
g $23,100.00 $23,100.00
PC items
$100,040.0
0
$100,040.0
0 $200,080.00
Roofer $11,070.00 $11,070.00 $11,070.00 $33,210.00
Plasterer $ 48,033.33
$
48,033.33 $48,033.33 $144,100.00
Painter $18,666.67
$18,666.6
7 $18,666.67 $56,000.00
QUESTION 5.
a. Projected project payment
ITEM JAN FEB MAR APR MAY JUNE JULY AUG SEP OCT NOV DEC Total
Preliminaries
$935,750.0
0 $935,750.00
Ground
works
$56,250.0
0
$56,250.0
0 $112,500.00
Concrete
$
251,350.00
$251,350.0
0 $251,350.00
$251,350.0
0
$1,005,400.0
0
Masonry
$
104,625.00
$104,625.0
0 $104,625.00
$104,625.0
0 $418,500.00
Metal works
$120,350.0
0
$120,350.0
0 $240,700.00
Hydraulics $74,250.00 $74,250.00 $148,500.00
Electricals
$
46,300.00 $46,300.00 $92,600.00
Mechanical
$
88,250.00 $88,250.00 $176,500.00
Waterproofin
g $23,100.00 $23,100.00
PC items
$100,040.0
0
$100,040.0
0 $200,080.00
Roofer $11,070.00 $11,070.00 $11,070.00 $33,210.00
Plasterer $ 48,033.33
$
48,033.33 $48,033.33 $144,100.00
Painter $18,666.67
$18,666.6
7 $18,666.67 $56,000.00
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

CPCCBC5010B
Ceramic Tiler $26,666.67
$26,666.6
7
$
26,666.67 $80,000.00
Carpet $38,400.00 $38,400.00
Cleaner $2,400.00 $2,400.00
External
works $9,333.33 $9,333.33 $9,333.33 $28,000.00
Total
$935,750.0
0
$56,250.0
0
$56,250.0
0
$
355,975.00
$379,075.0
0
$
415,078.33
$535,428.3
3
$488,293.3
3
$308,840.0
0
$
54,666.67
$54,666.6
7
$
95,466.67
$
3,735,740.00
PROGRESS CLAIM CERTIFICATE
Date of claim 03rd Feb, 2014
Previous claim: Nill
XXX Construction Company,
Tel: 01234567
Fax: 02123456
Prepared for AKM DEVELOPMENTS LIMITED SITE ADDRESS 2135 The Boulevard Strathfield NSW
Ceramic Tiler $26,666.67
$26,666.6
7
$
26,666.67 $80,000.00
Carpet $38,400.00 $38,400.00
Cleaner $2,400.00 $2,400.00
External
works $9,333.33 $9,333.33 $9,333.33 $28,000.00
Total
$935,750.0
0
$56,250.0
0
$56,250.0
0
$
355,975.00
$379,075.0
0
$
415,078.33
$535,428.3
3
$488,293.3
3
$308,840.0
0
$
54,666.67
$54,666.6
7
$
95,466.67
$
3,735,740.00
PROGRESS CLAIM CERTIFICATE
Date of claim 03rd Feb, 2014
Previous claim: Nill
XXX Construction Company,
Tel: 01234567
Fax: 02123456
Prepared for AKM DEVELOPMENTS LIMITED SITE ADDRESS 2135 The Boulevard Strathfield NSW

CPCCBC5010B
ITEM Total Prev. % Prev. $ Claim amount Claim % Amount to date % to date
Preliminaries $ 935,750.00 _ $ - $ 935,750.00 100 $ 935,750.00 100
Ground works $ 112,500.00 _ $ - $ - 0 $ - 0
Concrete $ 1,005,400.00 $ - $ - 0 $ - 0
Masonry $ 418,500.00 $ - $ - 0 $ - 0
Metal works $ 240,700.00 $ - $ - 0 $ - 0
Hydraulics $ 148,500.00 $ - $ - 0 $ - 0
Electricals $ 92,600.00 $ - $ - 0 $ - 0
Mechanical $ 176,500.00 $ - $ - 0 $ - 0
Waterproofing $ 23,100.00 $ - $ - 0 $ - 0
PC items $ 200,080.00 $ - $ - 0 $ - 0
Roofer $ 33,210.00 $ - $ - 0 $ - 0
Plasterer $ 144,100.00 $ - $ - 0 $ - 0
Painter $ 56,000.00 $ - $ - 0 $ - 0
Ceramic Tiler $ 80,000.00 $ - $ - 0 $ - 0
Carpet $ 38,400.00 $ - $ - 0 $ - 0
Cleaner $ 2,400.00 $ - $ - 0 $ - 0
External
works $ 28,000.00 $ - $ - 0 $ - 0
Total $ 3,735,740.00 $ - $ 935,750.00 0 $ 935,750.00 0
ITEM Total Prev. % Prev. $ Claim amount Claim % Amount to date % to date
Preliminaries $ 935,750.00 _ $ - $ 935,750.00 100 $ 935,750.00 100
Ground works $ 112,500.00 _ $ - $ - 0 $ - 0
Concrete $ 1,005,400.00 $ - $ - 0 $ - 0
Masonry $ 418,500.00 $ - $ - 0 $ - 0
Metal works $ 240,700.00 $ - $ - 0 $ - 0
Hydraulics $ 148,500.00 $ - $ - 0 $ - 0
Electricals $ 92,600.00 $ - $ - 0 $ - 0
Mechanical $ 176,500.00 $ - $ - 0 $ - 0
Waterproofing $ 23,100.00 $ - $ - 0 $ - 0
PC items $ 200,080.00 $ - $ - 0 $ - 0
Roofer $ 33,210.00 $ - $ - 0 $ - 0
Plasterer $ 144,100.00 $ - $ - 0 $ - 0
Painter $ 56,000.00 $ - $ - 0 $ - 0
Ceramic Tiler $ 80,000.00 $ - $ - 0 $ - 0
Carpet $ 38,400.00 $ - $ - 0 $ - 0
Cleaner $ 2,400.00 $ - $ - 0 $ - 0
External
works $ 28,000.00 $ - $ - 0 $ - 0
Total $ 3,735,740.00 $ - $ 935,750.00 0 $ 935,750.00 0
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 16
Related Documents

Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2025 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.